M10: Green Building Design + Construction has three type of rating systems. These are
LEED for New _____, LEED for _____& _____, and LEED for ______.
Give this one a try later!
construction, core, shell, schools
M6: Most construction materials are evaluated and selected based on performance,
aesthetics, and cost. Environmentally Preferable Products are expanded to include:
Give this one a try later!
A.Health impacts.
B.Environmental Impacts
C.Promote good indoor air quality
,M5: Monitoring the energy and water use of a building is an activity that can provide
assurance that the building is working:
Give this one a try later!
A.according to its energy plan
B.at its optimal level of efficiency
M7: With roughly 92% of a building's total lifetime cost expenses being allotted to
personnel costs, and only 2% due to its initial construction, it is essential to reduce
future personnel costs by creating an environment that is:
Give this one a try later!
A.productive
B.healthy
C.energy efficient
D.inviting for its occupants
M9: The sustainable coordinator will provide the design team with guidance and
inspiration to insure that the client's needs and the sustainable goals of the project are
met, as well as having:
Give this one a try later!
1.a firm understanding of green design strategies
2.knowledge of the financial and managerial policies of the project
3.an understanding of the environmental, and social implications of a
sustainable project
, M9: Listed below are some of the systems that can dramatically affect the design of a
sustainable building and should be included in schematic design if appropriate to the
project:
Give this one a try later!
1.daylighting
2.passive solar heating systems
4.massing of the building
M2: The Green Movement of the 1970's highlighted the ideas of alternative energy,
energy efficiency, air and water pollution abatement, waste management and control,
and natural ecosystem habitat preservation. These issues still a large part of the
dialogue concerning "green architecture" today and have been expanded to include:
Give this one a try later!
A.appropriate materials selection
B.indoor air quality
C.urban planning considerations
M10: What is the maximum number of credits a project can earn under the Regional
Priority category?
Give this one a try later!
4
LEED for New _____, LEED for _____& _____, and LEED for ______.
Give this one a try later!
construction, core, shell, schools
M6: Most construction materials are evaluated and selected based on performance,
aesthetics, and cost. Environmentally Preferable Products are expanded to include:
Give this one a try later!
A.Health impacts.
B.Environmental Impacts
C.Promote good indoor air quality
,M5: Monitoring the energy and water use of a building is an activity that can provide
assurance that the building is working:
Give this one a try later!
A.according to its energy plan
B.at its optimal level of efficiency
M7: With roughly 92% of a building's total lifetime cost expenses being allotted to
personnel costs, and only 2% due to its initial construction, it is essential to reduce
future personnel costs by creating an environment that is:
Give this one a try later!
A.productive
B.healthy
C.energy efficient
D.inviting for its occupants
M9: The sustainable coordinator will provide the design team with guidance and
inspiration to insure that the client's needs and the sustainable goals of the project are
met, as well as having:
Give this one a try later!
1.a firm understanding of green design strategies
2.knowledge of the financial and managerial policies of the project
3.an understanding of the environmental, and social implications of a
sustainable project
, M9: Listed below are some of the systems that can dramatically affect the design of a
sustainable building and should be included in schematic design if appropriate to the
project:
Give this one a try later!
1.daylighting
2.passive solar heating systems
4.massing of the building
M2: The Green Movement of the 1970's highlighted the ideas of alternative energy,
energy efficiency, air and water pollution abatement, waste management and control,
and natural ecosystem habitat preservation. These issues still a large part of the
dialogue concerning "green architecture" today and have been expanded to include:
Give this one a try later!
A.appropriate materials selection
B.indoor air quality
C.urban planning considerations
M10: What is the maximum number of credits a project can earn under the Regional
Priority category?
Give this one a try later!
4