Leadership in Energy and Environmental Design (LEED) has 4 certification levels.
Installation of EVSE at an existing building is worth as many as 15 LEED points.
Installing electric vehicle charging equipment may improve public perception of a business.
, When a business installs charging equipment the public may sense that the business supports sustainability.
Determining the appropriate location for EVSE requires the person planning the installation to consider all of the above.
Proper location of EVSE may include consideration of ADA guidelines depending on location.
Jurisdictional codes and requirements should always be checked when determining the location and other features of
the EVSE.
Bollards, curbs, and wheel stops can protect charging equipment from physical damage from vehicles.
Adequate site lighting increases the safety of an EVSE location.
Trailblazing signs are for directing drivers to the location of EV charging equipment.
According to the ADA guidelines 4% of general parking spaces should be accessible.
ADA parking space guidelines can be used as a guide when determining the number of EV charging spaces that
should be made accessible.
ADA guidelines are useful when planning an EVSE installation because all of the above.
Operable parts of accessible equipment should be located 15"-48" above finish grade per ADA guidelines.
The maximum depth of a barrier such as a curb or housekeeping pad, in front of accessible equipment is 10".
DC fast chargers pose accessibility challenges because their cables and connectors are larger and
heavier than standard Level 1 and Level 2 EVSE.
Benefits of commissioning the installation of electric include all of the above.
vehicle supply equipment (EVSE)
commissioning is the process that ensures mechanical, electrical, and other building systems are
installed, tested, and perform interactively in accordance with design documents.
test EVSE ground fault response One of the tests performed by an EVSE test set.
Documentation transfers important information about an installation from the contractor to the
owner.
true A statement indicating that the documentation transfer is important.
QUESTIONS AND CORRECT ANSWERS
Leadership in Energy and Environmental Design (LEED) has 4 certification levels.
Installation of EVSE at an existing building is worth as many as 15 LEED points.
Installing electric vehicle charging equipment may improve public perception of a business.
, When a business installs charging equipment the public may sense that the business supports sustainability.
Determining the appropriate location for EVSE requires the person planning the installation to consider all of the above.
Proper location of EVSE may include consideration of ADA guidelines depending on location.
Jurisdictional codes and requirements should always be checked when determining the location and other features of
the EVSE.
Bollards, curbs, and wheel stops can protect charging equipment from physical damage from vehicles.
Adequate site lighting increases the safety of an EVSE location.
Trailblazing signs are for directing drivers to the location of EV charging equipment.
According to the ADA guidelines 4% of general parking spaces should be accessible.
ADA parking space guidelines can be used as a guide when determining the number of EV charging spaces that
should be made accessible.
ADA guidelines are useful when planning an EVSE installation because all of the above.
Operable parts of accessible equipment should be located 15"-48" above finish grade per ADA guidelines.
The maximum depth of a barrier such as a curb or housekeeping pad, in front of accessible equipment is 10".
DC fast chargers pose accessibility challenges because their cables and connectors are larger and
heavier than standard Level 1 and Level 2 EVSE.
Benefits of commissioning the installation of electric include all of the above.
vehicle supply equipment (EVSE)
commissioning is the process that ensures mechanical, electrical, and other building systems are
installed, tested, and perform interactively in accordance with design documents.
test EVSE ground fault response One of the tests performed by an EVSE test set.
Documentation transfers important information about an installation from the contractor to the
owner.
true A statement indicating that the documentation transfer is important.