✔✔Division 01 - General Requirements - ✔✔General requirements for execution of the
work. Broad enough to apply to all divisions. Admin & Procedure, Temporary Facilities,
Performance Requirements, Life Cycle Activities.
✔✔Specifying Allowances - ✔✔Procurement Requirements
Conditions of Contract
Division 01 - Gen Req
Individual Specification Sections
✔✔Procurement Requirements - ✔✔Solicitation
Instructions for Procurement
Available Information
Procurement Forms & Supplements
✔✔Project Forms - ✔✔Performance Bond
Payment Bond
Certificates
✔✔Drawing - ✔✔Graphic and textual information in 2D format. Conveys design intent.
✔✔Construction Drawings - ✔✔Consist of contract drawings and resource drawings.
✔✔Contract Drawings - ✔✔Legally enforceable drawings. Could show deconstruction,
alteration, new construction.
✔✔Record Drawings - ✔✔Marked-up or corrected contract drawings that identify
changes incorporated into the work during construction.
✔✔Scaled Views - ✔✔Plans - Horizontal Planes
Elevations - Vertical Planes
Sections - Vertical Cut
Detail - may be a plan, elevation, or section view
✔✔Nonscaled Views - ✔✔Diagrams, Key Plans, Schedules, Perspectives, Isometric,
Title Sheet
✔✔Two methods for preparing written changes - ✔✔Narrative Method and Revised
Page Method
, ✔✔Addenda - ✔✔Written or graphic instruction to clarify, revise, add to, or delete
information in the procurement documents. Clarifies questions raised by bidders, issue
new requirements, and correct errors/omissions. Usually prior to receiving bids.
✔✔Contract Document Modifications - ✔✔Change Orders
Construction Change Directive
Minor Changes in the Work
✔✔Change Order - ✔✔Written instruction that authorizes addition, deletion, or revision
in work, contract sum, or contract time.
✔✔Construction Change Directive - ✔✔Written order directing a change in work *prior*
to agree on adjustment and stating proposed basis for adjustment in contract sum or
contract time.
✔✔Minor Changes in Work - ✔✔Written instruction or interpretation not involving
adjustment to contract sum or contract time.
✔✔Drawings - ✔✔Show size, form, quantity, relationship, generic type, and graphic
representation of construction materials.
✔✔Specifications - ✔✔Define qualitative requirements for products, materials, and
workmanship on which contract is based.
✔✔Part 1 - General - ✔✔Summary
Price and Payment Procedures
References
Administrative Requirements
Submittals
Quality Assurance
Delivery Storage and Handling
Field Conditions
Warranty
✔✔Entitlement Due
Owner - time and price
Contractor and owner control - time
Contractor control - nothing - ✔✔
✔✔Part 2 - Products - ✔✔Describes products, materials, equipment, fabrications,
mixes, systems, and assemblies that are required for the project. Source Quality Control
✔✔Part 3 - Execution - ✔✔Describes installation or application, including preparatory
actions and post-installation cleaning. Field Quality Control