What are the manned and locked spaces 24 hours? correct answers Radio,EKMS vault, post
office, disbursing office, ship store, Log room
What are 11 spaces with halon? correct answers Aux 1, Aux 2, Main 1, Main 2, Flame 1, Flame
2, Troop flame, JP5, Issue hazmat return, paint locker
What is the abbreviation of EDORM? correct answers Engineering department organizational
manual
What is the meaning of physical security in sounding security? correct answers Entering the
spaces and checking all of the equipment is operating in parameters and in normal condition
What is the abbreviation of RPM? correct answers Repair party manual
How many AFFF station do we have on board? correct answers 4 AFFF station (1 and 3
starboard) (2 and 4 portside)
How many fire pump we have on board? correct answers 5 fire pump (Aux 1 pump 1, Main 1
pump 2, Main 2 pump 3, Aux 2 pump 4 and 5 )
Provides comprehensive guidance for the safe and effective operation of the engineering
department. correct answers EDORM (engineering department organization and regulation
manual)
stresses the management principles deemed most essential: importance of watch officer overview
in departmental operations, importance of management programs, and increasing watch stander
level knowledge of programs and system. correct answers EDORM
maintain and operate the engineering plant in a consistently high state of readiness in order to
support the ship's primary mission as an instrument of national policy. correct answers
Engineering department
the backbone of any training and or qualification program. correct answers Personnel
qualification program
the cornerstone of a well run department is maintaining a formal, properly documented, and well
managed ____________ and ______________. correct answers training, qualification
what are the types of operational procedures? correct answers operational sequencing system
documents, planned maintenance system(PMS), Naval ships technical manual (NSTM),
commanding officer or engineer officer standing orders, restricted maneuvering doctrine
, what are the types of communication are found in all aspects of departmental duties? correct
answers Log keeping, management program execution, internal communications, tracking
material assessment and readiness.
All officers and enlisted personnel assigned duty in connection with supervision, operation, or
maintenance of the engineering plant will be qualified for such assignment using __________ or
_______________ as implemented per applicable office of the Chief of Naval operation, Bureau
of Naval personnel (BUPERS) and Navy type Command Instructions. correct answers PQS, Job
qualification requirements
assigned by the Chief Of Naval Personnel (CNP) and is responsible for the safe and proper
supervision, operation, and maintenance of the engineering plant. correct answers Commanding
Officer
will participate actively in evolutions and inspections to determine training effectiveness and
readiness of the engineering department. correct answers Executive Officer
normally designated as the integrated training team leader and the damage control training team
leader in accordance with reference (a) and (c) correct answers Executive officer
a).subject to the orders of the CO and is responsible for the proper performance of the
department. serve as damage control officer for fire fighting and damage control functions
1.) provide direction to all repair lockers
2.)designate appropriate casualty power configuration.
b.) upon getting underway, proceeding to anchorage, arriving pier side ad at other times when
extra care is required, serve as plant control officer and personally supervise the engineer officer
of the watch in proper operation of the plant.
c.) Satisfy the required critical schools course requirements as specified by TYCOM
d.) Ensure that the organization, training and qualification of the engineering training team
(ETT) and (DCTT) are current and effective.
e.) Act as the final PQS qualifying authority for all engineering watchstanders, except EOOW
f.) Be responsible for the performance of all evolutions, assessments, and repair work correct
answers Engineer officer
The engineer officer will personally inspect the following before and during closure. what are
this? correct answers Main and generator reduction gears, Main reduction gear lube oil sump and
excess covers, Main and auxiliary condensers, Main engine and ship's service generator lube oil
sumps, lower and upper diesel engine sumps, main engine internals, clean side of gas turbine
intake/inlet plenums, main engine internals, clean side of gas turbine/ inlet plenums, all tanks and