DETAILED COMPLETE SOLUTIONS
PASSED 100%
Which set of documentation is required to be maintained and retained for the life of the
system?
as built drawings, hydraulic calculations, original acceptance test records, and device
manufacturer's data sheets
as built drawings, hydraulic data plate, and annual maintenance and test records
inspection reports, test records, and maintenance as required by the standard
installation drawings, permit applications, and submittals signed by the Authority Having
Jurisdiction (AHJ) - Correct Answer ✔✔ a
What provisions must be made for a main drain test?
shut down fire pump
shut down jockey pump
shut down main control valve
verify adequate drainage - Correct Answer ✔✔ c
Which set of steps are taken when an inspector notices that the air gauge on a freezer
is lower than the air gauge on a supply/air compressor?
The air line in service is shut down and the ice block is removed. If the ice block cannot
be totally removed then the alternate air line is opened and used.
The dry valve or pre-action system is shut down and the air lines are dismantled to
remove the ice block.
The gauges are replaced with new gauges. If the gauges still do not match pressure,
the alternate air line is opened to increase pressure.
The inspector takes the in-service air line out of service and the alternate air line is
opened to equalize the pressure on the system. The out-of-service air line is taken apart
and the ice block is removed and used as future alternate air line. - Correct Answer ✔✔
d?
In a building with multiple wet pipe systems, for how many systems and at what
frequency are internal inspections of piping required?
every other system every 2 years
every other system every 5 years
every system every 2 years
every system every 5 years - Correct Answer ✔✔ b
After an impariment has been restored, who shall verify that all conditions have been
addressed in order to remove an impairment tag?
alarm company representative
, Authority Having Jurisdiction (AHJ)
fire department official
impairment coordinator - Correct Answer ✔✔ d
An inspection company is performing its first inspection of an existing warehouse owned
by a new client. The warehouse has rack storage with large sprinklers near the roof.
The spare sprinkler cabinet is empty. The sprinklers near the roof are within 20 to 28
inches from the top of the storage.After noting that the sprinkler cabinet needs to be
replenished, what should be recommended?
call for an engineering evaluation
have the storage moved down to a 36-inch clearance
have the storage moved down to a 48-inch clearance
no further action is needed; the head clearance is correct - Correct Answer ✔✔ a?
During a 5-year internal inspection on an alarm valve, what areas or devices will the
inspector inspect?
airline strainer and air compressor drip legs
clapper, trim ports, and water motor gong assembly
FDC caps, swivels, and piping and check valves
strainers, filters, and restriction orifices - Correct Answer ✔✔ d
What are the acceptable limits for a gauge having a 200 psi maximum radius installed
on a system with a 60 psi normal pressure?
between 50 psi and 55 psi
between 54 psi and 66 psi
between 55 psi and 65 psi
between 58 psi and 66 psi - Correct Answer ✔✔ b
How frequent shall the operating stem of an outside screw and yoke (OS&Y) valve be
lubricated?
quarterly
annually
every 2 years
when necessary due to the conditions - Correct Answer ✔✔ b
When pre-planning impairments, the inspector shall first coordinate with whom?
fire marshal
impairment coordinator
insurance carrier
police department - Correct Answer ✔✔ b
When performing a semi-annual inspection on a pre-action system, how should the
water flow alarm device be tested?
because of the nature of the type of system, water flow alarm devices do not need to be
tested on pre-action systems
by taking off the cover of the device and manually activating it