TRUE or FALSE? You can pre-assign a service time as an True
attribute before you actually get to the server that you'll
be using.
TRUE or FALSE? If you have Create module generating False
one-at-a-time customer arrivals, then it is not possible to
use a different Create module with 4-at-a-time customer
arrivals.
TRUE or FALSE? Fake customers can be used to schedule True
machine breakdowns, keep track of which time period the
simulation is currently in, and carry out other duties not
associated with actual customers.
Which module/spreadsheet is NOT in the Advanced Process Module. This is in the Basic Process panel.
Process panel?
Why are things like Seize, Delay, Release in multiple The Process module does not allow us to use Seize, Delay, Release with sufficient
templates? generality.
TRUE or FALSE? You can schedule failures to occur after True
a random number of customers have used a resource or
after a random amount of time has passed.
TRUE or FALSE? You are only allowed to schedule one False
type of failure for a particular resource.
Which block is NOT in the Blocks template? Process block. There is no such thing. However, the Process module is in the Basic
Process panel.
TRUE or FALSE? The Queue block can connect up to the False
Seize module from the Advanced Process template.
Which kinds of sets are allowed? Resources set, counter set, entity type set, entity picture set
TRUE or FALSE? It is possible for the resource Joey to be True
a member of three different resource sets.
TRUE or FALSE? For easy display and organizational True
purposes, our Call Center simulation is divided into
several submodels.
, TRUE or FALSE? The customer arrival pattern for our Call True
Center changes over the day and is therefore modeled as
a nonhomogeneous Poisson proces.
TRUE or FALSE? All of the Tech Support servers for our False
Call Center are equally skilled and have the same
concurrent work schedules.
TRUE or FALSE. In our Call Center demo, fake customers True
are used to update a variable that keeps track of the
period of the day.
Consider our Call Center demo. What is the following Grab one server from the set Product 1 in the order listed when the set was
Seize request asking for? Set, Product 1, 1, Preferred defined, and store that guy's identity int he attribute Agent.
Order, Agent
TRUE or FALSE. In our inventory demo, fake customers True
are used to initiate a periodic inventory review.
Consider the Arena expression DISC(0.3,1,0.5,3,1.0,6) (0.3)(1) + (0.5-0.3)(3) + (1.0-0.5)(6) = 3.9
which is a discrete random variable. What is the random
variable's expected value?
Consider a vanilla (s,S) = (5,12) inventory policy. If my 9.
inventory slips to 3, how many items do I order? Since 3<s, we order S-3 = 9
TRUE or FALSE? It's perfectly OK for a customer to go True
from server 1 to server 2 and then back to server 1.
TRUE or FALSE? Crazy stuff can happen if you start True
fooling around with multiple server visits, service
priorities, and server times.
TRUE or FALSE? There are 100s of SMARTs files for you to True
play around with.
Modules and spreadsheets from which panels are used in Basic Process, Advanced Process, Advanced Transfer
the demo?
((1==1)10) + ((1==0)5) = ? 10
CORRECT ANSWERS ACTUAL UPDATED QUESTIONS AND CORRECT
ANSWERS
TRUE or FALSE? You can pre-assign a service time as an True
attribute before you actually get to the server that you'll
be using.
TRUE or FALSE? If you have Create module generating False
one-at-a-time customer arrivals, then it is not possible to
use a different Create module with 4-at-a-time customer
arrivals.
TRUE or FALSE? Fake customers can be used to schedule True
machine breakdowns, keep track of which time period the
simulation is currently in, and carry out other duties not
associated with actual customers.
Which module/spreadsheet is NOT in the Advanced Process Module. This is in the Basic Process panel.
Process panel?
Why are things like Seize, Delay, Release in multiple The Process module does not allow us to use Seize, Delay, Release with sufficient
templates? generality.
TRUE or FALSE? You can schedule failures to occur after True
a random number of customers have used a resource or
after a random amount of time has passed.
TRUE or FALSE? You are only allowed to schedule one False
type of failure for a particular resource.
Which block is NOT in the Blocks template? Process block. There is no such thing. However, the Process module is in the Basic
Process panel.
TRUE or FALSE? The Queue block can connect up to the False
Seize module from the Advanced Process template.
Which kinds of sets are allowed? Resources set, counter set, entity type set, entity picture set
TRUE or FALSE? It is possible for the resource Joey to be True
a member of three different resource sets.
TRUE or FALSE? For easy display and organizational True
purposes, our Call Center simulation is divided into
several submodels.
, TRUE or FALSE? The customer arrival pattern for our Call True
Center changes over the day and is therefore modeled as
a nonhomogeneous Poisson proces.
TRUE or FALSE? All of the Tech Support servers for our False
Call Center are equally skilled and have the same
concurrent work schedules.
TRUE or FALSE. In our Call Center demo, fake customers True
are used to update a variable that keeps track of the
period of the day.
Consider our Call Center demo. What is the following Grab one server from the set Product 1 in the order listed when the set was
Seize request asking for? Set, Product 1, 1, Preferred defined, and store that guy's identity int he attribute Agent.
Order, Agent
TRUE or FALSE. In our inventory demo, fake customers True
are used to initiate a periodic inventory review.
Consider the Arena expression DISC(0.3,1,0.5,3,1.0,6) (0.3)(1) + (0.5-0.3)(3) + (1.0-0.5)(6) = 3.9
which is a discrete random variable. What is the random
variable's expected value?
Consider a vanilla (s,S) = (5,12) inventory policy. If my 9.
inventory slips to 3, how many items do I order? Since 3<s, we order S-3 = 9
TRUE or FALSE? It's perfectly OK for a customer to go True
from server 1 to server 2 and then back to server 1.
TRUE or FALSE? Crazy stuff can happen if you start True
fooling around with multiple server visits, service
priorities, and server times.
TRUE or FALSE? There are 100s of SMARTs files for you to True
play around with.
Modules and spreadsheets from which panels are used in Basic Process, Advanced Process, Advanced Transfer
the demo?
((1==1)10) + ((1==0)5) = ? 10