The Virginia Stormwater Management
How many design scales are there fore
1 2 Program is authorized by the ______ and
infiltration practices?
administered through the ______
What is the lower limit of the range of The Stormwater Management Act requires
3 imperviousness that can result in stream 4 the following individuals to obtain and
degradation? maintain a certificate of competency
Don't know?
Terms in this set (114)
The Virginia Stormwater Management Program is Virginia Stormwater Management Act, Virginia Stormwater Management
authorized by the ______ and administered through the Program Regulation
______
VPDES Permit/Construction GP authorizes discharge of greater than or equal to an acre
stormwater from construction activities that are
, The Stormwater Management Act requires the State permit, regulate, and control stormwater runoff
Water Control Board to
DEQ has ___ days to complete review of real or 90
potential inter-jurisdictional impacts upon request
The Stormwater Management Act requires the staff of a stormwater program, anyone contracted by a VSMP authority,
following individuals to obtain and maintain a certificate standard and specification holders
of competency
The dual certificate will expire three years from the latest date of the certificates
SWM plan must be approved by ___ before land VSMP program authority
disturbance
The water quality criteria sets a site-based load limit of 0.41 lbs/acre/year
____ of total phosphorus for new development
The phosphorus load limit uses the 10% impervious cover
Part II B and II C water quantity criteria addresses channel protection and flood protection
Which two plans in the SWPPP must be approved? SWM plan, ESC plan
Does the SWM plan address runoff during or after post-construction
construction?
What is the lower limit of the range of imperviousness 10%
that can result in stream degradation?
What do land disturbing activities consist of? excavating, clearing, grading
LDA threshold for the SWM Act and Regulation 1 acre or 2500 square feet for Chesapeake Bay Preservation Act
Latest Already Graded A+ UPDATE |2026
Leave the first rating
Save
Students also studied
Flashcard sets Study guides
AERT 3820 Midterm CPCS FORWARD TIPPING DUMPER ... ACI Concrete Field Testing Technici... TC
Teacher 90 terms Teacher 15 terms Teacher 125 terms 27
maxk85791 Preview joan63400 Preview Smart_Achiever Preview
Practice questions for this set
Learn 1 /7 Study with Learn
3
Choose an answer
The Virginia Stormwater Management
How many design scales are there fore
1 2 Program is authorized by the ______ and
infiltration practices?
administered through the ______
What is the lower limit of the range of The Stormwater Management Act requires
3 imperviousness that can result in stream 4 the following individuals to obtain and
degradation? maintain a certificate of competency
Don't know?
Terms in this set (114)
The Virginia Stormwater Management Program is Virginia Stormwater Management Act, Virginia Stormwater Management
authorized by the ______ and administered through the Program Regulation
______
VPDES Permit/Construction GP authorizes discharge of greater than or equal to an acre
stormwater from construction activities that are
, The Stormwater Management Act requires the State permit, regulate, and control stormwater runoff
Water Control Board to
DEQ has ___ days to complete review of real or 90
potential inter-jurisdictional impacts upon request
The Stormwater Management Act requires the staff of a stormwater program, anyone contracted by a VSMP authority,
following individuals to obtain and maintain a certificate standard and specification holders
of competency
The dual certificate will expire three years from the latest date of the certificates
SWM plan must be approved by ___ before land VSMP program authority
disturbance
The water quality criteria sets a site-based load limit of 0.41 lbs/acre/year
____ of total phosphorus for new development
The phosphorus load limit uses the 10% impervious cover
Part II B and II C water quantity criteria addresses channel protection and flood protection
Which two plans in the SWPPP must be approved? SWM plan, ESC plan
Does the SWM plan address runoff during or after post-construction
construction?
What is the lower limit of the range of imperviousness 10%
that can result in stream degradation?
What do land disturbing activities consist of? excavating, clearing, grading
LDA threshold for the SWM Act and Regulation 1 acre or 2500 square feet for Chesapeake Bay Preservation Act