CORRECT ANSWERS
T/F: The solicitation and basis for award for Design-Bid-Build is both quantitative and
xc xc xc xc xc xc xc xc xc xc xc xc xc
qualitative. - ans-False xc xc
T/F: Design-Bid-Build is typically Low Bid Based. - ans-True
xc xc xc xc xc xc xc xc
T/F: One of the factors for success of a Design-
xc xc xc xc xc xc xc xc xc
Build delivery system is to engage the construction team before 20% of the design is compl
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc
eted by the owner. - ans-True
xc xc xc xc xc
T/
F: Proposals with 35% or more of the design in the RFP will more than likely be based on Lo
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc
w Bid (Price). - ans-True
xc xc xc xc
T/F: As long as Design-Builder meets performance requirements, the Design-
xc xc xc xc xc xc xc xc xc
Builder has some flexibility to figure out the best approach. - ans-True
xc xc xc xc xc xc xc xc xc xc xc
What existing Federal Law required any federal project exceeding $100,000 to require two
xc xc xc xc xc xc xc xc xc xc xc xc xc
bonds (Performance Bond and Labor and Material Bond)? - ans-Miller Act
xc xc xc xc xc xc xc xc xc xc
What are the 3 fundamental decisions an Owner must make when initiating a feasible proje
xc xc xc xc xc xc xc xc xc xc xc xc xc xc
ct? - ans-Type of delivery system, type of procurement method, and type of contract format.
xc xc xc xc xc xc xc xc xc xc xc xc xc xc
Design-Build means ________________. - ans-One company/ xc xc xc xc xc
firm is responsible for both design and construction, construction can begin before all the d
xc xc xc xc xc xc xc xc xc xc xc xc xc xc
esigns are complete. xc xc
What is a primary reason for choosing a Design-Build delivery system? - ans-
xc xc xc xc xc xc xc xc xc xc xc xc
If the project needs to be done fast, it places more risk on owner, if the owner wishes to fast t
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc
rack project design and construction, if the project is complex and requires close coordinati
xc xc xc xc xc xc xc xc xc xc xc xc xc
on of design and construction.
xc xc xc xc
Owners who choose to use Design- xc xc xc xc xc
Build as their project delivery method of choice should expect all of the following outcomes
xc xc xc xc xc xc xc xc xc xc xc xc xc xc xc
except for: xc
a) cost guarantee during design
xc xc xc xc
b) time savings
xc xc
c) increased administration
xc xc
d) high quality
xc xc