Questions And Answers
2026/2027|100% Correct
Which of the following are statuses that can apply to a BOM?
A. On
B. Off
C. Active
D. Inactive
E. Open - ANSWER>Active
Inactive
What are the basic time elements in the production process?
A. Setup Time
B. Alternate time
,C. Build Time
D. Teardown time
E. Processing time - ANSWER>Setup time
Teardown time
Processing time
The material master is grouped into different views or segments based on which factors?
A. Processes that use the material
B. Material Type
C. Organizational level
D. Material Composition
E. Material description - ANSWER>Processes that use the material
Material type
Organizational level
Examples of production resource tools are?
, A. Raw materials
B. Fixtures
C. Engineering drawings
D. Calibration instruments
E. Warehouse building - ANSWER>Fixtures
Engineering drawings
Calibration instruments
A planned order is a formal request that indicates?
A. How many units of a product are needed
B. Where the finished goods are to be shipped
C. What materials are needed
D. Where the raw materials are stored
E. When the materials are needed. - ANSWER>How many units of a product are needed
What materials are needed