ITS commissioning - ANSWERS-Completion of Level A testing of an Intelligent
Transportation System per 704.03.01. This does not constitute Acceptance by the
Department of the work.
Materials Engineer - ANSWERS-The Department's Manager of the Bureau of Materials,
or the Department's Regional Materials Engineer and their designated representatives
land surveyor - ANSWERS-A person who is legally authorized to practice land
surveying in New Jersey according to the provisions of N.J.S.A. 45:8-27, et seq
manufacturer's recommendations - ANSWERS-Recommendations and instructions by
the manufacturer including but not limited to the construction requirements, drawings,
plans, and material requirements
New Work - ANSWERS-Work directed by the Department that is not covered under an
existing Item or combination of Items in the Contract. Items established to provide
payment modifications as specified in the Contract, such as damages, bonuses, and
penalties, are not this.
Others. - ANSWERS-An individual or a legal entity other than the Contractor, the
Surety, or an individual or a legal entity in a contractual relationship with the Contractor
or the Surety.
pavement structure - ANSWERS-The combination of pavement, base courses, and
when specified, a subbase course, placed on a subgrade to support the traffic load and
distribute it to the roadbed (see Figure 101-1). These various courses are defined as
follows: 1. pavement. One or more layers of specified material of designed thickness at
the top of the pavement structure. 2. base course. One or more layers of specified
, material of designed thickness placed on the subgrade or subbase. 3. subbase. One or
more layers of specified material of designed thickness placed on the subgrade.
plan - ANSWERS-The Contractor's proposed methods of performing work including but
not limited to materials, equipment, personnel, and schedules.
Plans. - ANSWERS-The advertised plans as amended by addenda and Change of
Plan. This includes the version of the Standard Details specified on the key sheet.
Professional Engineer - ANSWERS-A person licensed to practice engineering in the
State of New Jersey.
Project. - ANSWERS-The specific section of highway or other public improvement
constructed under the Contract.
Project Limits - ANSWERS-These are shown on the key sheet and modified as follows:
1. The areas of construction operations and areas used by the Contractor to perform the
work. If only a portion of a lane or shoulder of a road is being constructed, they include
all lanes and shoulders of the roadway. 2. Where only one direction of a road is being
constructed, and the road is divided by a median, island, or barrier curb, they include all
of the lanes in that direction and the median. Otherwise, they include all lanes in both
directions. 3. The longitudinals include all safety devices and signs excluding signs
greater than 1,600 feet outside the ones shown on the key sheet. 4. Areas within the
ROW provided for the Contractor's use.
Proposal - ANSWERS-The schedule of Items and estimate of the various quantities and
kinds of Work to be performed for which bid prices are invited. It also includes the
location and description of the Project and the date and time of the opening of bids.
qualified products list (QPL) - ANSWERS-A list of specific qualified products maintained
by the Department for use in the Work. Available at the following website:
http://www.state.nj.us/transportation/eng/materials/qualified