●● If visual monitoring is utilized as the means of release detection for
single walled tank, it must be conducted on a _______ Basis.
Answer: Daily
●● The Purpose of spill and overfill protection equipment is to minimize
the potential for a release during:
Answer: Fuel Deliveries
●● Which of the following is a potential symptom of toxic petroleum
exposure:
Answer: Dizziness
Tremors
Eye irritation
All of the above(correct)
●● Under-Dispenser Containment is required for ______ underground
storage tank systems
Answer: All
,●● All of the following are true for Automatic Tank Gauging (ATG)
except for:
Answer: ATG system are required to be installed in all UST system
●● According to CCR Title 23, UST regulations Spill containment (spill
bucket) must meet all of the following requirements except:
Answer: Be installed on vent risers
●● Suction piping may not require leak detection if it has one check
valve located where?
Answer: Directly below the suction pump
●● Service Technician performing work on Monitoring equipment must
be trained and certified by __________
Answer: The manufacture of the equipment.
●● Air monitoring must be conducted ________ when performing work
within a confined space.
Answer: Prior to and during
●● A UST Service Technician must be recertified by the equipment
Manufacture at the time interval recommended by the equipment
manufacture or at least every ____ months, whichever is greater.
, Answer: 36 Months
●● When an automatic tank gauge is utilized for single-walled tank leak
detection, it shall test the tank at least monthly after product delivery or
when the tank is filled to within _____ percent of the highest operating
level during the previous month.
Answer: 10
●● The following is true of spill buckets except:
Answer: Must provide drainage for spilled product into the secondary
containment sump.
●● If during an inspection of dispensing equipment at a retail gas station
you find that the product is dispensing at a significant lower rate than
usual. You should check:
Answer: For piping leaks.
●● According to CCR title 23, UST Regulations the local agency must
be notified by the Owner/Operator how long before conducting
Secondary Containment Testing?
Answer: At least 48 hours before the test.
●● Poppet Valves are a Vapor Recovery Component installed:
Answer: on the vapor recovery riser