questions with answers |\ |\
inspection dept performs the following inspections: - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔1. footing |\ |\
2. under slab
|\ |\
3. foundation/ wood framing
|\ |\ |\
4. rough-in
|\
5. building framing
|\ |\
6. insulation
|\ |\
7. fire protection
|\ |\
8. final
|\
exceptions to design professional seal requirement - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔1. family residence up to 8 attached units |\ |\ |\ |\ |\ |\ |\ |\
2. a building used by a farmer (unless it involves the health or safety
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
of the public)
|\ |\ |\
3. an institutional or commercial bldg less than $90,000 or exceed
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
2500 sq ft. |\ |\ |\
4. reno which doesn't alter structural system, egress, or live/ dead
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
load.
, Name the parts of a reference stake - CORRECT ANSWERS ✔✔
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
the distance shown on a reference stake is... - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔the horizontal measurement of the distance from the hub to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
center line of the end of the fill. Also called the "offset"
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Slope= - CORRECT ANSWERS ✔✔Rise divided by Run
|\ |\ |\ |\ |\ |\ |\
What is angle of a 100% slope - CORRECT ANSWERS ✔✔45*
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Which rock is the hardest to excavate or rip? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔Igneous Rock (or ignorant, hardheaded)|\ |\ |\ |\ |\
What is igneous rock formed from? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔Molten magma |\
Which rock is the easiest to excavate or rip? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔Sedimentary Rock
|\ |\
How is Sedimentary rock formed? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\
✔✔formed from sediments being compressed by other overlying
|\ |\ |\ |\ |\ |\ |\ |\
sediments or water |\ |\