NRPP Exam Study Guide,
Radon Mitigation Installer
NRPP Exam Study Guide,
Radon Mitigation, Radon
Measurment
Radioactive elements - ANSWER ✔✔Elements that decay and
release protons, changing their atomic number
Rn - ANSWER ✔✔Radon, part of the Uranium decay chain
RDP - ANSWER ✔✔Immediate decay product of Rn: Polonium,
Lead, and Bismuth
,Rn measurement units - ANSWER ✔✔picoCuries per liter (pCi/L) in
the U.S., Becquerels per cubic meter (Bq/m3) internationally
Alpha particles - ANSWER ✔✔Most massive, slowest moving, and
least penetrating type of radiation
Beta particles - ANSWER ✔✔Smallest mass type of radiation
Gamma rays - ANSWER ✔✔No mass, fastest moving, and deepest
penetrating type of radiation
Half-life - ANSWER ✔✔Amount of time required for one-half the
atoms in a sample to decay
Rn half-life - ANSWER ✔✔3.8 days
Rn - ANSWER ✔✔Group A Carcinogen, known to create cancer in
humans
Epidemiological Studies - ANSWER ✔✔Comparisons of indoor Rn
concentrations in homes of lung cancer victims and non-lung cancer
persons
Linear no-threshold risk model - ANSWER ✔✔Assumes any radiation
dose increases the risk of cancer proportionately
,Rn exposure - ANSWER ✔✔Cumulative (chronic) risk, greater for
smokers and children
Rn transport mechanisms - ANSWER ✔✔Advection, diffusion,
emanation, and well water transport
Causes of air pressure differences - ANSWER ✔✔Indoor/outdoor
temperature differences and mechanical equipment
Mechanical ventilation - ANSWER ✔✔Can impact indoor Rn
concentrations in different ways
Homes served by private, drilled wells - ANSWER ✔✔May have
elevated indoor Rn due to radon in water transport
Indoor Rn concentrations - ANSWER ✔✔Commonly highest near the
source (e.g., ground-contacted rooms)
Measurement protocols - ANSWER ✔✔Short-term and long-term
testing deployment
Closed-building conditions - ANSWER ✔✔Required for short-term
tests, including specific instructions
Proper Test Location(s) - ANSWER ✔✔Determining if the device was
located in an appropriate room
3
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2026. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
, NRPP certified/State licensed person - ANSWER ✔✔Determining if
the test was conducted by a certified/licensed individual
NRPP approved device - ANSWER ✔✔Determining if the
measurement device was approved by NRPP
Differential pressure - ANSWER ✔✔Pressure needed to overcome
stack and mechanical effects
Estimate airflow needs - ANSWER ✔✔Based on vacuum cleaner test
Identify need for multiple suction points - ANSWER ✔✔Determining if
multiple points are required for effective mitigation
Identify barriers to sub-slab communication - ANSWER
✔✔Recognizing obstacles that prevent effective communication
Recognize sub-slab hazards - ANSWER ✔✔Identifying potential
dangers in the sub-slab area
Select membrane type - ANSWER ✔✔Choosing the appropriate
membrane based on specific requirements
Select soil gas collector type - ANSWER ✔✔Choosing the
appropriate collector for soil gas