BANK| DESIGN-BUILD INSTITUTE OF AMERICA
CERTIFICATION EXAM PREP WITH COMPLETE 850 REAL
EXAM QUESTIONS AND CORRECT VERIFIED ANSWERS/
ALREADY GRADED A+
1. What is the primary characteristic of the design-build project delivery
method?
A. Separate contracts for design and construction
B. One entity is responsible for both design and construction
C. The owner performs all design work
D. Construction begins only after design is complete
Answer: B
Rationale: In design-build, a single entity holds responsibility for both
design and construction, creating a single point of accountability.
2. Which project delivery method is most associated with collaborative
teamwork and integrated processes?
A. Design-Bid-Build
B. Design-Build
C. Construction Management at Risk
pg. 1
,D. Lump Sum Contracting
Answer: B
Rationale: Design-build emphasizes collaboration among designers,
builders, and owners from project inception.
3. In design-build, who typically holds the contract with the owner?
A. The architect only
B. The contractor only
C. The design-builder
D. The construction manager
Answer: C
Rationale: The owner contracts directly with the design-builder, who is
responsible for delivering the completed project.
4. A major advantage of design-build is:
A. Increased adversarial relationships
B. Faster project delivery
C. Elimination of owner involvement
D. Guaranteed lowest initial cost
Answer: B
pg. 2
,Rationale: Overlapping design and construction phases can significantly
reduce project duration.
5. Which of the following is a core DBIA principle?
A. Maximize separation between designer and builder
B. Foster open communication and trust
C. Limit owner participation
D. Avoid shared risk
Answer: B
Rationale: DBIA promotes collaboration, transparency, and trust among
all project participants.
6. What is the owner’s role in a design-build project?
A. Design the project
B. Construct the project
C. Define project goals, scope, and performance requirements
D. Manage subcontractors directly
Answer: C
Rationale: The owner establishes project objectives and performance
criteria while the design-builder delivers the solution.
pg. 3
, 7. Which procurement method is commonly used for selecting a design-
builder?
A. Low-bid only
B. Qualifications-based selection (QBS)
C. Random selection
D. Open auction
Answer: B
Rationale: Owners often use qualifications-based or best-value selection
to choose the most capable design-build team.
8. Best-value procurement evaluates:
A. Price only
B. Qualifications only
C. A combination of price and technical qualifications
D. Schedule only
Answer: C
Rationale: Best-value procurement balances cost with qualifications,
experience, and technical approach.
9. Bridging documents in design-build are used to:
A. Replace the contract
pg. 4