Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

COSC 153 Exam 2 with all Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
20-06-2026
Written in
2025/2026

COSC 153 Exam 2 with all Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+

Institution
Course

Content preview

COSC 153 Exam 2 with all Correct & 100% Verified
Answers |Actual Complete Exam |Already Graded A+

Name the four fundamental stages of the construction management process after the design
stage. ✔Correct Answer-Pre construction, procurement, construction and post construction

What are the five distinct stages of the design process? ✔Correct Answer-programming,
feasibility, schematic design, design development and contract documents

How does the quality of the design drawings impact the quality of construction? ✔Correct
Answer-poor drawings=poor construction, vice versa

In relation to construction, what is meant by the term due diligence? ✔Correct Answer-to
ensure the property is suitable for its intended purpose and mitigate any risks that could
potentially arise during development. Occurs during the preconstruction phase.

What are the two procurement instruments used to buy out the construction job? ✔Correct
Answer-subcontractors and purchase orders

Name at least three positions that make up the members of the onsite construction
management team. ✔Correct Answer-superintendent, assistant superintendent, field
engineer.

What occurrence marks the official end of the project? ✔Correct Answer-the architect
releases a certificate of substantial completion

What is the name of the tool used to keep track of and manage completion of all the loose
ends, minor repairs, adjustments, and missing items at the end of a project? ✔Correct
Answer-a punch list

What is value engineering and what is its purpose? ✔Correct Answer-to simplify products and
processes

Why is it important to have a clear distinction between the project punchout and the warranty
period? ✔Correct Answer-the completion of a punchout and warranty implies substantial
completion of the project. If work items continue to be added to the punch list a project will
never end.

Name three key members of the project team. ✔Correct Answer-owner, principle design firm,
and the general contractor.

, List at least three common factors that will influence your ability to trust or not trust someone
on your team ✔Correct Answer-History, experience, ability, similarities and differences and
character.

How is vulnerability-based trust related to accountability within the team? ✔Correct Answer-
With vulnerability-based trust, all team members should be aware of each other's tasks and
deliverables. Team members should authentically ask each other how things are going and
respond honestly. Each team member should use this information to help each other as needed
for the success of the individual team member and the overall project.

According to Fernando Flores, what are the five basic speech acts? ✔Correct Answer-The five
basic speech acts include declaring, requesting, promising, assessing, and asserting.

Define committed listening and committed speaking. ✔Correct Answer-Committed listening is
listening intently to another person to make sure that you clearly understand what they mean
by the words they are speaking without judging, assessing, or negating what they are saying.
Committed speaking is speaking with intention and purpose, using words specifically to clearly
convey your exact meaning.

Give three examples of effective listening ✔Correct Answer-Examples of effective listening are
to stop talking, give others an extended chance to talk, hear their whole question/comment,
paraphrase to assure your understanding, show respect and concern, withhold evaluation, be
patient, and project positive listening energy

Give three examples of effective speaking. ✔Correct Answer-Examples of effective speaking
are to ask for specifics and/or clarification, get examples, avoid broad statements which do not
allow core understanding, watch for nonverbal cues, facial expressions and eye contact which
are clues for understanding, review and summarize, rephrase what you determined to be key
information, clarify what needs to be done now or "by when."

Define the role of the Integrated Project Leader (IPL) ✔Correct Answer-The role of the
Integrated Project Leader (IPL) is to be the individual who has primary accountability with
leading the design-build team. The IPL may take the place of the traditional project manager or
the project manager may be subordinate to the IPL.

How does the low bid mentality challenge the ability for the (AEC) industry to make cultural
shifts ✔Correct Answer-when low price drives the project delivery process, there is no room
for any real value generation or innovative solution finding to optimize our clients return on
investment.

What is the basic differences between management and leadership ✔Correct Answer-
management is the ability to control a group, leadership is to influence and motivate

Written for

Institution
Course

Document information

Uploaded on
June 20, 2026
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$11.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclub Yale School Of Medicine
Follow You need to be logged in order to follow users or courses
Sold
54
Member since
1 year
Number of followers
1
Documents
11568
Last sold
2 days ago
"The Club for Top Academic Performance."

Welcome to StudyClub—the ultimate destination for students who want to make studying not only effective but also enjoyable! Whether you’re preparing for an exam, looking to improve your grades, or mastering new subjects, StudyClub is your go-to space to find the tools and resources you need to succeed. At StudyClub, I believe in the power of community. That’s why I’ve created a collection of high-quality study materials designed to simplify complex concepts and help you achieve your academic goals. Whether you’re an individual looking to study independently or a student seeking the support of a virtual study group, you’ll find everything you need to succeed. Join the StudyClub today, where learning is made easier, more organized, and—most importantly—more collaborative. Let’s grow together, learn smarter, and unlock your academic potential. Thank you for being part of the StudyClub community. I can’t wait to see you succeed!

Read more Read less
3.6

14 reviews

5
6
4
1
3
4
2
1
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions