Latest Version |Already Graded A+
1. Public Owner money comes from federal, state, or local
owner is the taxpayer
projects can be managed by private organizations
2. Private Owner most construction financed this way
developer
3. Developer private owner that only owns the project for the duration of construction
4. Owner Represen- facility managers
tatives
building committee (users, financial backers,
residents) pm/cm
5. Architects translate and develop an owner's requirements and graphically represent
them
so that a contractor can accurately price, schedule, and implement the
design owner's representative thru construction phase
licensed individuals
6. Drafters/CAD/BIMproduce construction documents in support of architect's work
Operators
increasingly independent of architects
7. Specificati prepares the specifications, which lays out the level of performance
on Writers requirements and quality expected
8. Interior work on nonstructural interior spaces, interior finishes
Design-ers
1/
43
,COSC 353 - Final Exam with all Correct & 100% Verified Answers |Latest
Version |Already Graded A+
9. Landscape location of trees and shrubs
Archi-tects
set grades, establish walkways, walls, and
fences site design
10. Engineers mechanical, electrical, structural, civil
licensed individual
hired by owner, not the architect
11. Structural calculate strengths and deflections, foundation sizes, beam thickness,
Engi-neer and strength of floor slabs
building can withstand nature
12. Mechanical design heating, cooling, water supply, and sanitary systems
Engi-neers
13. Electrical calculate overall electrical load required, size equipment accordingly
Engi-neers
determine amount of lighting required
14. Civil Engineers determine location of a project on a site (actually the surveyor does this)
design roads, bridges, tunnels
15. Surveyors measure distances and elevations of land
surfaces site development
16. Constructor professional responsible for all construction activities, GC or CM
2/
43
,COSC 353 - Final Exam with all Correct & 100% Verified Answers |Latest
Version |Already Graded A+
can be brought in before architect to advise owner
3/
43
, COSC 353 - Final Exam with all Correct & 100% Verified Answers |Latest
Version |Already Graded A+
17. Estimators prepare a complete list of all job costs
18. Schedulers define distinct construction activities and understand the relationships
among the activities
monitor job progress, coordinate subs, analyze changes and impact of
delays
19. Purchasin buy subcontracts once a job is won
g Agents
get best price while ensuring all contract requirements are
20. Specialty met hired by and work directly for a general contractor
Con-tractors
supply most material and labor on a job
21. Trades have specialized knowledge
22. Material manufacture, fabricate, and install materials and components
Suppli-ers
form trade associations that establish level of quality for each
23. Equipment product sell or rent
Sup-pliers
who maintains and who
24. Construction operates first person
Project
Manager assigned to project
configures project team, schedules the job, and sets up cost control system
25. Superintendent interact with subs, coordinate flow of workers, supplies, and equipment to
ensure schedule is met
4/
43