Which of the following is not true about a side-hinged exit
door?
Select one:
a. Must be used to connect any room to an exit route
b. Must swing out in the direction of exit travel if the room is
designed to occupy more than 50 people or contains high
hazard contents
c. Must swing in so that it does not get in the way of the
direction of exit travel if the room is designed to occupy
more than 50 people or contains high hazard contents -
ANSWER-c. Must swing in so that it does not get in the way
of the direction of exit travel if the room is designed to
occupy more than 50 people or contains high hazard
contents
Which of the following is not part of an exit route?
Select one:
a. Exit discharge
b. Exit
,c. Exit alarm
d. Exit access - ANSWER-C. Exit ALARM
What is an EIS?
Select one:
a. A document prepared to describe the effects for proposed
construction activities on the surrounding natural and
physical environment
b. A process used to determine the feasibility of constructing a
project
c. The format used to organize construction trades into specific
categories
d. None of these
e. A document used by a contractor to inquire about additional
information from the owner and/or design team - ANSWER-a.
A document prepared to describe the effects for proposed
construction activities on the surrounding natural and
physical environment
How many CSI divisions does the post-2004 masterformat
have?
Select one:
a. 100 Divisions
b. 32 Divisions
c. 16 divisions
d. 50 Divisions - ANSWER-D
,Which of the following is not a method used to procure a
constructor?
Select
one:
a. Qualifications-
based selection
b. Job order
contracting
c. Best
value
d. Low bid - ANSWER-b.
Job order contracting
During design, which phase represents the best time to
realize cost saving
opportunities for value
engineering?
Select one:
a. Final design
b. Construction
c. Conceptual design
d. Project close-out
e. Preliminary design - ANSWER-c. Conceptual design
The effect on productivity when crews know they are being
observed is called
, what?
Select
one:
a. Productivity
trend line
b. Total quality
management
c. None of
these
d. Superintendent
effect
e. Hawthorne effect - ANSWER-e.
Hawthorne effect
A crew of four electricians that has been studied can be
represented by the
following productivity
trend line:
y = -3.25x2 + 1.5x +0.56
What is the maximum productivity of this crew (in hours of
overtime)?
Select
one: a.
3.25 hrs
b. 9.5 hrs