ICC CALIFORNIA UST Inspector Exam
Questions with 100% Correct Answers Latest
Version Top Rated A+
Question >> 1
*Which of the following is not considered an enforcement action?
a. Permit fee increase
b. Red tag
c. Civil ...
Answer
a. Permit fee increase
Question >> 2
All of the following are duties of authorized confined space entrants, EXCEPT
a. Know the hazards that may be faced during entry, including information on the
mode, signs or symptoms, and consequences of the exposure;
b. Properly use equipment as required e.g. testing, ventilation, PPE, ladders,
c. Communicate with the attendant as necessary to enable the attendant to monitor
entrant status
Page 1 of 220
,d. The entrant must alert the attendant whenever: Any warning sign or symptom of
exposure to a dangerous situation is recognized, or a prohibited condition is detected;
and the entrant then investigates and mitigates any dangerous condition encountered.
e. Exit the permit space as quickly as possible whenever an evacuation alarm is
activated.
Answer
d. The entrant must alert the attendant whenever: Any warning sign or symptom of
exposure to a dangerous situation is recognized, or a prohibited condition is detected;
and the entrant then investigates and mitigates any dangerous
condition encountered Title 8 CCR; 5157
Question >> 3
The design and construction of all primary containment including any integral
secondary containment system, shall be approved by an independent testing
organization in accordance with any of the following, EXCEPT
a. Industry codes
b. Local agency standards developed by the State water Resources Control Board
c. Voluntary consensus standards
d. Engineering standards
Answer
b. Local agency standards developed by the State water Resources Control Board CCR;
Page 2 of 220
,2631 (b)
Question >> 4
Which of the following is exempt from secondary containment testing?
a) UDCs
b) Secondary piping
c) Monitored turbine sumps
d) Hydrostatically monitored annular space
Answer
(d) Hydrostatically monitored annular space CCR Title 23, sec 2637 (a)
Question >> 5
If a UST operating permit is issued to a person other than the operator of the UST
system, that person shall do all of the following, EXCEPT
a. Enter into a written agreement with the operator of the tank to monitor the tank
system as set forth in the permit.
b. Provide the operator with a copy or summary of Section 25299 in the form that
the board specifies by regulation.
c. Notify the local agency of any change of operator.
d. Periodically inspect the operator to ensure compliance with this chapter.
Answer
Page 3 of 220
, d. Periodically inspect the operator to ensure compliance with this chapter.
H≻ 25284 (a)(3)
Question >> 6
What does not describe how suction piping is designed/constructed?
A) The below-grade piping operates at less than atmospheric pressure
B) Suction piping is continuously monitored
C) No valves or pumps are installed below grade in the suction line. Only one check
valve is located directly below and as close as practical to the suction pump
D) The below-grade piping is sloped so that the contents of the pipe will drain back
into the storage tank if the suction is released
Answer
B) Suction piping is continuously monitored
§ 2636(a)(3). Design, Construction, Installation, Testing, and Monitoring Requirements
for Piping
(3) Suction piping if the piping is designed, constructed, and installed as follows:
(A) The below-grade piping operates at less than atmospheric pressure (suction
piping);
(B) The below-grade piping is sloped so that the contents of the pipe will drain back
into the storage tank if the suction is released (gravity-flow piping);
(C) No valves or pumps are installed below grade in the suction line. Only one check
valve is located directly below and as close as practical to the suction pump; and
Page 4 of 220
Questions with 100% Correct Answers Latest
Version Top Rated A+
Question >> 1
*Which of the following is not considered an enforcement action?
a. Permit fee increase
b. Red tag
c. Civil ...
Answer
a. Permit fee increase
Question >> 2
All of the following are duties of authorized confined space entrants, EXCEPT
a. Know the hazards that may be faced during entry, including information on the
mode, signs or symptoms, and consequences of the exposure;
b. Properly use equipment as required e.g. testing, ventilation, PPE, ladders,
c. Communicate with the attendant as necessary to enable the attendant to monitor
entrant status
Page 1 of 220
,d. The entrant must alert the attendant whenever: Any warning sign or symptom of
exposure to a dangerous situation is recognized, or a prohibited condition is detected;
and the entrant then investigates and mitigates any dangerous condition encountered.
e. Exit the permit space as quickly as possible whenever an evacuation alarm is
activated.
Answer
d. The entrant must alert the attendant whenever: Any warning sign or symptom of
exposure to a dangerous situation is recognized, or a prohibited condition is detected;
and the entrant then investigates and mitigates any dangerous
condition encountered Title 8 CCR; 5157
Question >> 3
The design and construction of all primary containment including any integral
secondary containment system, shall be approved by an independent testing
organization in accordance with any of the following, EXCEPT
a. Industry codes
b. Local agency standards developed by the State water Resources Control Board
c. Voluntary consensus standards
d. Engineering standards
Answer
b. Local agency standards developed by the State water Resources Control Board CCR;
Page 2 of 220
,2631 (b)
Question >> 4
Which of the following is exempt from secondary containment testing?
a) UDCs
b) Secondary piping
c) Monitored turbine sumps
d) Hydrostatically monitored annular space
Answer
(d) Hydrostatically monitored annular space CCR Title 23, sec 2637 (a)
Question >> 5
If a UST operating permit is issued to a person other than the operator of the UST
system, that person shall do all of the following, EXCEPT
a. Enter into a written agreement with the operator of the tank to monitor the tank
system as set forth in the permit.
b. Provide the operator with a copy or summary of Section 25299 in the form that
the board specifies by regulation.
c. Notify the local agency of any change of operator.
d. Periodically inspect the operator to ensure compliance with this chapter.
Answer
Page 3 of 220
, d. Periodically inspect the operator to ensure compliance with this chapter.
H≻ 25284 (a)(3)
Question >> 6
What does not describe how suction piping is designed/constructed?
A) The below-grade piping operates at less than atmospheric pressure
B) Suction piping is continuously monitored
C) No valves or pumps are installed below grade in the suction line. Only one check
valve is located directly below and as close as practical to the suction pump
D) The below-grade piping is sloped so that the contents of the pipe will drain back
into the storage tank if the suction is released
Answer
B) Suction piping is continuously monitored
§ 2636(a)(3). Design, Construction, Installation, Testing, and Monitoring Requirements
for Piping
(3) Suction piping if the piping is designed, constructed, and installed as follows:
(A) The below-grade piping operates at less than atmospheric pressure (suction
piping);
(B) The below-grade piping is sloped so that the contents of the pipe will drain back
into the storage tank if the suction is released (gravity-flow piping);
(C) No valves or pumps are installed below grade in the suction line. Only one check
valve is located directly below and as close as practical to the suction pump; and
Page 4 of 220