What is the min clearance distance while traveling uncer a
6 Feet
12kv powerline?
For a non-qew how far must you stay away from 50-200
15 feet
kv energized powerline?
2.2 What is the MAD for QEW working on a 12KV
What is the min clearance distance while traveling under
No parameter set parameter must be set bby engineer
110 KV powerline?
If a non QEW is operating a crance and there are pow-
50 FT erlines of unknown voltages near the work area, but over
35KV, What is the min clearance distance
2.2FT QEW approach on 12 KV
Crawler, locomotive and truck cranes used for general
1910.180
industry are found in what OSHA regulation
Operation and maintience of electrical power, generation,
1910.269
trans, and distro line and equipment
Construction of electrical power, generation, trans, and
1910.269
distro line and equipment electrical power
Construction of electrical power, generation, trans and
1926 SUB part V
distro line equipment and electrical power
1926 sub part CC Cranes and derricks used in contruction
The American society of mechanical engineers (ASME)
B30.5 standards
mobile and locomotive cranes
Be trained and qualified This must be done before an operator runs a new crane
This paperwork allows IBEW memebers to operate cranes
EICA crane cert
and recognize in most states
OSHA Who developed the chart for hand signals
pads and cribbing blocks Supporting surfaces for our outrigger float
1/7
, this capacityt decreases when more layers of wire are
Line pull
wound onto the drum
this digger derrick fuction should not be used to looses
swinging side to side
poles in the ground
no operators cert is required for the digger derrick be-
1910.269 and 1926 subpart V cause it is exempt as long as it is used under which OSHA
codes
what condition can be worse if ti happens during extreme
shock load
cold when chocker breaks with heavy load
when moving the accessory from the intermediate boom
pole tons or pole flares to the outer boom you must deduct 100 pounds from your
load chart
when drilling a hole to set a pole you must allow for
kelly bar/ auger adjustment of scope in and out to keep this component
plumb
over the corner or one outrigger a crane creates the most ground pressure over which area
these must be installed in wire rope sling eye on the man
thimble
baskets
who must let you know about underground utilities and
controlloing entity
hazards on jobsite
what can be done to reduce the strain on slings pur on a
lenghthen the slings
hook, shackle, or master link
at what windspeeds must QEW make a decision to shut-
20MPH
down or continue man basket work
if you are a piece of equipment with extendable outrigger
use a spotter and you cannot see them while extending them, what
must you do