According to CCR, Title 23 UST Regulations, What is the frequency that the Monitor Certification must
be performed?
Every 12 Months
If visual monitoring is utilized as the means of release detection for single walled tank, it must be
conducted on a _______ Basis.
Daily
The Purpose of spill and overfill protection equipment is to minimize the potential for a release
during:
Fuel Deliveries
Which of the following is a potential symptom of toxic petroleum exposure:
Dizziness
Tremors
Eye irritation
All of the above(correct)
Under-Dispenser Containment is required for ______ underground storage tank systems
All
All of the following are true for Automatic Tank Gauging (ATG) except for:
ATG system are required to be installed in all UST system
According to CCR Title 23, UST regulations Spill containment (spill bucket) must meet all of the
following requirements except:
Be installed on vent risers
Suction piping may not require leak detection if it has one check valve located where?
Directly below the suction pump
Service Technician performing work on Monitoring equipment must be trained and certified by
__________
The manufacture of the equipment.
Air monitoring must be conducted ________ when performing work within a confined space.
Prior to and during
, A UST Service Technician must be recertified by the equipment Manufacture at the time interval
recommended by the equipment manufacture or at least every ____ months, whichever is greater.
36 Months
When an automatic tank gauge is utilized for single-walled tank leak detection, it shall test the tank at
least monthly after product delivery or when the tank is filled to within _____ percent of the highest
operating level during the previous month.
10
The following is true of spill buckets except:
Must provide drainage for spilled product into the secondary containment sump.
If during an inspection of dispensing equipment at a retail gas station you find that the product is
dispensing at a significant lower rate than usual. You should check:
For piping leaks.
According to CCR title 23, UST Regulations the local agency must be notified by the Owner/Operator
how long before conducting Secondary Containment Testing?
At least 48 hours before the test.
Poppet Valves are a Vapor Recovery Component installed:
on the vapor recovery riser
If equipped with an ATG it shall be programmed to test the tank _______?
at least monthly
A Vacuum-assist nozzle is a component of a(n) ________?
Stage II vapor recovery system
Stage I Vapor Recovery can be installed in the following configured(s):
Dual Point, Manifold, & Coaxial
An Underground tank System includes:
The underground storage tank
Piping
Ancillary Equipment
All of the above is correct
If equipped with an overfill alarm, the alarm must be triggered to alert the delivery operator when the
tank is no more than _______ full.
90%
Approved Cathodic Protection Methodologies include: