UPDATED 2026 (LATEST VERSION VERIFIED FOR ACCURACY)
2026 LATEST!!!!
According to CCR Title 23 UST Regulations, a monitoring equipment certification must be documented
using a:
Monitoring system certification form
Emergency shut off valves (Shear Valves, Crash Valves, and Earth Quake Valves) shall be installed at
what location?
At the base of each dispenser device
Spill containers may be constructed of metal provided:
The exterior wall is protected from Galvanic Corrosion.
A spill containment structure(spill bucket) is required at the:
Fill Riser
Given; a monitoring system certification is being conducted on a UST system with a double-walled
tank and single-walled pressurized piping. A positive shut off device (flapper valve) is used for overfill
prevention to complete the monitoring system certification the service technician must functionally
test all of the following components except:
Automatic Tank Gauge(ATG Inventory Probe)
All of the following must be included when performing a VST(they could also mean AST) monitoring
System Certification except:
Functionality of the Flapper or Ball Float Valves
If no manufacture training is available a service technician can service the leak detection component
only when ________________.
Approved by the local agency.
Tanks without secondary containment located within a specific distance of a public drinking water
well requires enhanced leak detection testing:
Every 3 years
All of the following licenses allow an individual to perform secondary containment testing except:
C-10 Electrical Contractor
By December 22, 1998 all Automatic Line Leak Detectors installed on Single-Walled Pressurized Piping
must be capable of ___________.
Restrict product flow