QUESTIONS WITH VERIFIED A+ ANSWERS 2026
EDITION.
Which of these is NOT a commonly recommended site rule?
- Keep job site clean and free of debris
- All work must comply with all applicable codes, drawings/plans, and specifications
- Workers must supply their own protective gear
- Follow all safety policies as well as Oregon OSHA regulations
Workers must supply their own protective gear
True or False
The application fee is the same for both an active and inactive license
True
When changing business entities, once a previous entity has already been established, the license
must:
- Pay new fees
- Do all of these things
- Complete a new CCB application
- Provide a new bond and insurance for the new business entity
Do all of these things
Which one of these is NOT a common form of corporation in the construction industry?
- Limited Liability Corporation
- 501 ©
- "S" Corporation
- "C" Corporation
501 ©
When hiring a subcontractor you should always:
- Check references
- Ensure they have proper and current insurance coverage
- Allow them sufficient advance time to plan and schedule
- Do all of these things
Do all of these things
The central contractor who has a direct contract with the property owner is referred to as the :
- Prime Contractor
- Original contractor
- General Contractor
- Any of these could apply
Any of these could apply
, Which of the following describes one of the purposes of Oregon construction lien law?
- Punishes contractors for faulty construction work
- Helps as owner avoid paying contractors and suppliers twice for the same work by knowing who has
lien rights
- Helps establish fault when craftsmanship disputes ensue
- Is an audit system to ascertain as to whether non-exempt contractors carry workers comp coverage
Helps as owner avoid paying contractors and suppliers twice for the same work by knowing who has lien
rights
A lien is foreclosed by filling a lawsuit. The lawsuit to foreclose a lien must be filed within ___ days
after the lien is recorded.
- 75
- 120
- 60
- 30
120
How long does the subcontractor have to supply the property owner with the Notice of Right to Lien
in order to preserve his lien rights?
- 14 working days
- 10 working days
- 8 working days
- 5 working days
8 working days
A claim of lien must be recorded 75 days of:
- When the first progress payment was made
- The initial contract date
- When the project is substantially complete
- The date in which the information to owner about construction liens was provided
When the project is substantially complete
Of the following, what would generally not be considered equipment?
- Concrete
- Power cord
- Hand drill
- A crane
Concrete
A bid or proposal should never be submitted before:
- A contractor posts a $30,000 bond
- The contractor has tools services
- All work is completed
- A markup percentage is added to the project costs