Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Oregon Construction CC B Test Examination Questions with Verified A+ Answers 2026 Edition – Complete Construction Certification Practice Exam and Study Guide

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
23-06-2026
Written in
2025/2026

This document contains Oregon Construction CC B test examination questions with verified answers for the 2026 edition. It covers core construction and inspection topics including building codes, safety standards, construction methods, site procedures, permit requirements, and regulatory compliance. The material is designed to help candidates understand exam-style questions, strengthen technical knowledge, and improve readiness for certification. It serves as a structured study resource for individuals preparing for the Oregon CC B construction examination.

Show more Read less
Institution
Course

Content preview

OREGON CONSTRUCTION CC B TEST EXAMINATION
QUESTIONS WITH VERIFIED A+ ANSWERS 2026
EDITION.
A written construction contract with the owner of a residential structure must contain all of the
following EXCEPT:

A list of any subcontractors who will work on the project.

Which financial statement shows the financial condition of the business by summarizing business
assets, liabilities, and owners' equity at a particular point in time?

Balance Sheet

The Oregon CCB requires contractors to keep a list of subcontractors working on a project. This list
must include:

The subcontractor's CCB license number and the subcontractor's address.

An Information Notice to Owner About Construction Liens need not be given when

The property owner is a licensed Oregon contractor

The CCB dispute resolution authority allows a property owner:

To file a complaint to recover funds spent in discharging a lien.

There are several steps to becoming an Oregon licensed contractor. One of the important steps is
determining who will take the required license test. This person is known as:

The Responsible Managing Individual.

The building exterior shell provides protection for the building at its exterior boundaries by providing
all of the following EXCEPT:

Variable interior environment.

When a party to a contract fails to do what the contract requires, without a legally sufficient excuse,
this is referred to as a:

Breach of contract.

A contractor must carry workers' compensation insurance unless it is a

Sole proprietorship with a residential endorsement and no employees.

Contracts between the general contractor and other independent contractors are called subcontracts.
In such a case, all of the following are true, EXCEPT:

The subcontractor works under the contractor's CCB license and does not need a CCB license.

A licensed contractor operating as a Sole Proprietorship files their federal tax return reporting the
business income as:

, Ordinary income.

Which of the following is not considered hazardous waste and can be disposed of at any solid waste
landfill?

Used bricks.

Company overhead is the cost of doing business and includes

Office expenses.

Every employer in Oregon must do the following, EXCEPT:

File weekly tax reports electronically

Open burning is often regulated by local regulations. Which activities are allowed as open burning?

Burning stumps to clear land.

All contractors with a MINIMUM of how many employees MUST keep an OSHA 300 log and comply
with Oregon OSHA record keeping and reporting requirements?

11

If a contractor requests an inspection and the inspector does not perform the inspection when
scheduled, then

The contractor must leave open the portion of the construction requiring inspection until the inspector
gives approval.

The contractor must leave open the portion of the construction requiring inspection until the
inspector gives approval.

At least 60 days

Scheduling a project involves many elements including knowing how much time is needed as a buffer
particularly for tasks subject to delays such as weather. This planning tool is known as:

Contingency Time.

A construction company calculates its annual overhead percentage with the following formula:

Prior year, or anticipated, overhead costs divided by prior year, or anticipated, revenue.

Which of the following is not a disadvantage to forming a partnership?

Ease of formation.

Contractors are required to have an RMI designated at all times. An RMI is an individual for whom all
of the following are true, EXCEPT:

Has achieved a score of at least 65 on the CCB exam.

Retainage is partial withholding of payment until project completion and acceptance. In Oregon
retainage CANNOT exceed what percentage?

Written for

Course

Document information

Uploaded on
June 23, 2026
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
TESTBANKSSTORES
4.0
(1)

Get to know the seller

Seller avatar
TESTBANKSSTORES Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
10
Member since
9 months
Number of followers
1
Documents
1424
Last sold
1 month ago
TESTBANKSSTORES

Accounting, Finance, Statistics, Computer Science, Nursing, Chemistry, Biology & More — A+ Test Banks, Study Guides & Solutions As a Top 1st Seller on Stuvia and a nursing professional, my mission is to be your light in the dark during nursing school and beyond. I know how stressful exams and assignments can be, which is why I’ve created clear, reliable, and well-structured resources to help you succeed. I offer test banks, study guides, and solution manuals for all subjects — including specialized test banks and solution manuals for business books. My materials have already supported countless students in achieving higher grades, and I want them to be the guide that makes your academic journey easier too. I’m passionate, approachable, and always focused on quality — because I believe every student deserves the chance to excel. **Ace Your Exams with Confidence!**

Read more Read less
4.0

1 reviews

5
0
4
1
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions