Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers with Verified Solutions | Latest Updated 2026

Rating
-
Sold
-
Pages
22
Grade
A+
Uploaded on
24-06-2026
Written in
2025/2026

ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers with Verified Solutions | Latest Updated 2026

Institution
ACI Concrete
Course
ACI Concrete

Content preview

ACI- Concrete Field-Testing Technician -
Grade 1 Exam Questions and Answers
with Verified Solutions | Latest Updated
2026



Q1. Start molding specimens B. False ASTM C172
for strength tests within 30
minutes after fabricating the - Para (4.1.2)
composite sample. A. True B.
False - Start molding. specimens for
strength tests within 15 min after
fabricating the composite sample.


Q2. The maximum allowable B. False ASTM C172
time between obtaining the
first and last portions of the - Para (4.1)- The elapsed time shall
composite sample may not not exceed 15 min. between
exceed 5 minutes. A. True B. obtaining the first and final portions
False of the composite sample.


Q3. The composite concrete A. True ASTM C172
sample must be protected
from sun, wind, contamination - Para (4.1.2)
and rapid evaporation. A. True
B. False


Q4. If the concrete contains A. True ASTM C172- Para (6.1)
aggregates larger than those
that are appropriate for a size
of mold or equipment used,
the sample should be wet

,sieved before making the test.
A. True B. False


Q5. The composite sample B. False ASTM C172-Para (4.1.1)
should not be remixed before
beginning any tests. A. True B. - The sample shall be combined and
False remixed with a shovel the minimum
amount necessary to ensure
uniformity and compliance with the
maximum time limits


Q6. Sampling should normally B. False ASTM C172-Para (5). NOTE
be performed, as the concrete 2-Sampling should normally be
is discharged from the mixer. performed as the concrete is
A. True B. False delivered from the mixer. To the
conveying vehicle used to transport
the concrete to the forms; however,
specifications may require other
points of sampling, such as the
discharge of a concrete pump.


Q7. ASTM Method C172 A. True ASTM C172- Para (1.1)
includes sampling from
stationary mixers, paving
mixers, truck mixers,
agitators, and non-agitating
equipment. A. True B. False


Q8. After sampling is D. None of the above ASTM C172-
completed, start the tests for Para (4.1.2) Start tests for slump,
slump and air content within: temperature, and air content within
A. 2 ½ minutes B. 10 minutes 5 min after obtaining the final
C. 15 minutes D. None of the portion of the composite sample.
above

, Q9. In any case, do not obtain A. All the water and admixtures
samples until: A. All the water have been added to the concrete.
and admixtures have been ASTM C172- Para (5.2.3). In any case
added to the concrete B. 200 do not obtain samples until after all
revolutions of the drum have of the water has been added to the
been obtained C. ½ of the mixer.
water has been added D. None
of the above


Q10. No samples shall be A. 10% or after 90% ASTM C172-
taken before_________ or Para (5.2.1). NOTE 3-No samples
after_________ of the batch has should be taken before 10 % or after
been discharged. A. 10% or 90 % of the batch has been
after 90% B. 20% or after 90% discharged. Due to the difficulty of
C. 20% or after 80% D. None determining the actual quantity of
of the above concrete discharged, the intent is to
provide samples that are
representative of widely separated
portions, but not the beginning and
the end of the load.


Q11. When strength tests are B. 1 cubic foot ASTM C172- Para
to be made, the minimum size (5.1). Make the samples to be used
of the composite sample shall for strength tests a minimum of 28 L
be: A. ¼ cubic foot B. 1 cubic (1 ft3).
foot C. Any convenient size D.
1 Wheelbarrow


Q12. Sample the concrete B. Passing a receptacle completely
from the chute of a truck through the discharge steam or by
mixer by: A. Raising chute to completely diverting the discharge
stop the flow and scoop into the sample container. ASTM
concrete from there into the C172- Para (5.2.3).
slump cone and cylinder molds

Written for

Institution
ACI Concrete
Course
ACI Concrete

Document information

Uploaded on
June 24, 2026
Number of pages
22
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.98
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
Examlytic

Get to know the seller

Seller avatar
Examlytic Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
5 days
Number of followers
0
Documents
978
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions