Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

ACI Concrete Field Testing Exam Questions and Answers with Verified Solutions | Latest Updated 2026

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
24-06-2026
Written in
2025/2026

ACI Concrete Field Testing Exam Questions and Answers with Verified Solutions | Latest Updated 2026

Institution
ACI Concrete
Course
ACI Concrete

Content preview

ACI Concrete Field Testing Exam
Questions and Answers with Verified
Solutions | Latest Updated 2026



ASTM 172 Describes procedures for obtaining
samples of fresh concrete for plastic
properties testing and casting
strength specimens


QA Program Testing performed by the owner,
verifies QC


QC Programs Testing performed by the contractor


ASTM 172 includes sampling Stationary Mixers (central mixers)
from Paving and truck mixers Agitating
and non-agitating equipment
Continuous mixers (volumetric)


Composite sample Two or more portions of concrete
obtained generally from the middle
portion of the batch The portions of
concrete should be spaced or timed
separating them at equal intervals


If casting strength specimens, 1 cubic foot or roughly half a wheel
need this much concrete barrow


What must be done when an Wet sieve
aggregate is too large for

, testing equipment?


Nominal Maximum Aggregate Smallest specified sieve in which
Size 100% of the material is allowed to
pass


Composite sampling time limit Time between the first and final
portion of the composite sample
shall not exceed 15 minutes


Cover the sample To protect it from Sun, wind,
contamination and rapid
evaporation


Plasticity testing time limit Begin tests for temp, slump and air
within 5 minutes after obtaining the
final portion of the composite
sample


Compressive strength testing Begin casting strength test
time limit specimens within 15 minutes after
fabricating the composite sample
Cylinders Beams Prisms


Sampling should normally be on concrete as it is delivered to the
performed project site and after all water and
admixtures have been added Some
spec may require sampling from
other points such as the point of
discharge of a pump


Procedure for stationary two or more regularly spaced
mixers (plant) intervals middle portion of the batch

Written for

Institution
ACI Concrete
Course
ACI Concrete

Document information

Uploaded on
June 24, 2026
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.98
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
Examlytic

Get to know the seller

Seller avatar
Examlytic Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
5 days
Number of followers
0
Documents
978
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions