TEST 2 2026 REVIEW PAPER COMPLETE
QUESTIONS WITH PROFESSIONAL MARKING
SCHEME AND SOLUTIONS
◉ 𝑺𝒊𝒙 𝒎𝒂𝒋𝒐𝒓 𝒂𝒄𝒕𝒊𝒗𝒊𝒕𝒊𝒆𝒔 of system implementation: Answer: 1.
Coding
2. Testing
3. Installation
4. Documentation
5. Training
6. Support
◉ 𝘾𝙊𝘿𝙄𝙉𝙂, 𝙏𝙀𝙎𝙏𝙄𝙉𝙂, 𝘼𝙉𝘿 𝙄𝙉𝙎𝙏𝘼𝙇𝙇𝘼𝙏𝙄𝙊𝙉 𝙋𝙍𝙊𝘾𝙀𝙎𝙎𝙀𝙎 Answer:
◉ 𝑪𝒐𝒅𝒊𝒏𝒈 is the process where the Answer: 𝒑𝒉𝒚𝒔𝒊𝒄𝒂𝒍 𝒅𝒆𝒔𝒊𝒈𝒏
𝒔𝒑𝒆𝒄𝒊𝒇𝒊𝒄𝒂𝒕𝒊𝒐𝒏𝒔 are turned into working computer code.
◉ 𝑻𝒆𝒔𝒕𝒔 are performed using various Answer: strategies.
◉ 𝑻𝒆𝒔𝒕𝒊𝒏𝒈 is performed in 𝒑𝒂𝒓𝒂𝒍𝒍𝒆𝒍 with Answer: coding.
,◉ 𝑰𝒏𝒔𝒕𝒂𝒍𝒍𝒂𝒕𝒊𝒐𝒏 is the process in during which Answer: the current
system is 𝒓𝒆𝒑𝒍𝒂𝒄𝒆𝒅 by the new system.
◉ 𝘿𝙀𝙇𝙄𝙑𝙀𝙍𝘼𝘽𝙇𝙀𝙎 𝙁𝙊𝙍 𝘾𝙊𝘿𝙄𝙉𝙂, 𝙏𝙀𝙎𝙏𝙄𝙉𝙂, 𝘼𝙉𝘿 𝙄𝙉𝙎𝙏𝘼𝙇𝙇𝘼𝙏𝙄𝙊𝙉
Answer:
◉ Two deliverables for 𝑪𝒐𝒅𝒊𝒏𝒈: Answer: • Code
• Program documentation
◉ Two deliverables for 𝑻𝒆𝒔𝒕𝒊𝒏𝒈: Answer: • Test scenarios (test
plan) and test data
• Results of program and system testing
◉ Three deliverables for 𝑰𝒏𝒔𝒕𝒂𝒍𝒍𝒂𝒕𝒊𝒐𝒏: Answer: • User guides
• User training plan
• Installation and conversion plan
◉ The 𝒊𝒏𝒔𝒕𝒂𝒍𝒍𝒂𝒕𝒊𝒐𝒏 𝒂𝒏𝒅 𝒄𝒐𝒏𝒗𝒆𝒓𝒔𝒊𝒐𝒏 𝒑𝒍𝒂𝒏 focuses on what three
issues: Answer: • Software and hardware installation schedule
• Data conversion plan
• Site and facility remodeling plan
,◉ 𝙏𝙃𝙀 𝙋𝙍𝙊𝘾𝙀𝙎𝙎𝙀𝙎 𝙊𝙁 𝘿𝙊𝘾𝙐𝙈𝙀𝙉𝙏𝙄𝙉𝙂 𝙏𝙃𝙀 𝙎𝙔𝙎𝙏𝙀𝙈, 𝙏𝙍𝘼𝙄𝙉𝙄𝙉𝙂
𝙐𝙎𝙀𝙍𝙎, 𝘼𝙉𝘿 𝙎𝙐𝙋𝙋𝙊𝙍𝙏𝙄𝙉𝙂 𝙐𝙎𝙀𝙍𝙎 Answer:
◉ Although the process of documentation proceeds throughout the
life cycle, it receives 𝒇𝒐𝒓𝒎𝒂𝒍 𝒂𝒕𝒕𝒆𝒏𝒕𝒊𝒐𝒏 during the implementation
phase because Answer: the end of implementation largely marks the
𝒆𝒏𝒅 𝒐𝒇 𝒕𝒉𝒆 𝒂𝒏𝒂𝒍𝒚𝒔𝒊𝒔 𝒕𝒆𝒂𝒎'𝒔 𝒊𝒏𝒗𝒐𝒍𝒗𝒆𝒎𝒆𝒏𝒕 𝒊𝒏 𝒔𝒚𝒔𝒕𝒆𝒎𝒔
𝒅𝒆𝒗𝒆𝒍𝒐𝒑𝒎𝒆𝒏𝒕.
◉ As the team is getting ready to move on to new projects, you and
the other analysts need to prepare documents that reveal all of the
important information you have accumulated about this system
during its Answer: 𝒅𝒆𝒗𝒆𝒍𝒐𝒑𝒎𝒆𝒏𝒕 and 𝒊𝒎𝒑𝒍𝒆𝒎𝒆𝒏𝒕𝒂𝒕𝒊𝒐𝒏.
◉ 𝑻𝒘𝒐 𝒂𝒖𝒅𝒊𝒆𝒏𝒄𝒆𝒔 for final documentation: Answer: 1. Information
systems personnel who will maintain the system throughout its
productive life.
2. People who will use the system as part of their daily lives.
◉ 𝑼𝒔𝒆𝒓 𝒕𝒓𝒂𝒊𝒏𝒊𝒏𝒈 can be one of either two things: Answer: •
Application-specific
• General for operating system and off-the-shelf software
◉ 𝘿𝙀𝙇𝙄𝙑𝙀𝙍𝘼𝘽𝙇𝙀𝙎 𝙁𝙊𝙍 𝘿𝙊𝘾𝙐𝙈𝙀𝙉𝙏𝙄𝙉𝙂 𝙏𝙃𝙀 𝙎𝙔𝙎𝙏𝙀𝙈, 𝙏𝙍𝘼𝙄𝙉𝙄𝙉𝙂
𝙐𝙎𝙀𝙍𝙎, 𝘼𝙉𝘿 𝙎𝙐𝙋𝙋𝙊𝙍𝙏𝙄𝙉𝙂 𝙐𝙎𝙀𝙍𝙎 Answer:
, ◉ Two deliverables for 𝑫𝒐𝒄𝒖𝒎𝒆𝒏𝒕𝒂𝒕𝒊𝒐𝒏: Answer: • System
documentation
• User documentation
◉ Two deliverables for the 𝑼𝒔𝒆𝒓 𝑻𝒓𝒂𝒊𝒏𝒊𝒏𝒈 𝑷𝒍𝒂𝒏: Answer: • Classes
• Tutorials
◉ Two deliverables for 𝑼𝒔𝒆𝒓 𝑻𝒓𝒂𝒊𝒏𝒊𝒏𝒈 𝑴𝒐𝒅𝒖𝒍𝒆𝒔: Answer: •
Training materials
• Computer-based training aids
◉ Three deliverables for 𝑼𝒔𝒆𝒓 𝑺𝒖𝒑𝒑𝒐𝒓𝒕 𝑷𝒍𝒂𝒏: Answer: • Help desk
• Online help
• Bulletin boards and other support mechanisms
◉ 𝙎𝙊𝙁𝙏𝙒𝘼𝙍𝙀 𝘼𝙋𝙋𝙇𝙄𝘾𝘼𝙏𝙄𝙊𝙉 𝙏𝙀𝙎𝙏𝙄𝙉𝙂 Answer:
◉ A 𝒎𝒂𝒔𝒕𝒆𝒓 𝒕𝒆𝒔𝒕 𝒑𝒍𝒂𝒏 is developed during what phase? Answer:
𝒂𝒏𝒂𝒍𝒚𝒔𝒊𝒔 phase.
◉ The 𝒂𝒄𝒕𝒖𝒂𝒍 𝒕𝒆𝒔𝒕𝒊𝒏𝒈 is done during Answer: 𝒊𝒎𝒑𝒍𝒆𝒎𝒆𝒏𝒕𝒂𝒕𝒊𝒐𝒏.