Questions and Correct
Answers | New Update
Common standard time period for station battery to handle outage of AC
power to chargers - ANSWER ✔✔8-12 hours
Time to restore data exchange redundancy when redundancy testing by
RC/TOP/BA deemed unsuccessful - ANSWER ✔✔2 hours
Transition period to backup control facility (fully functioning) -
ANSWER ✔✔2 hours
Annual testing of backup control facility must prove to be functional for
this long - ANSWER ✔✔2 hours
, Every 2 years TO/TOP/DSP must provide how many hours of system
restoration training to field switching personnel - ANSWER ✔✔2
hours
Every 2 years GOP's with blackstart resources shall provide how many
hours of training to operating personnel responsible for startup -
ANSWER ✔✔2 hours
BAL-002 default contingency reserve restoration period (following
disturbance recovery period) - ANSWER ✔✔90 minutes
How often should BA calculate and record inadvertent interchange -
ANSWER ✔✔60 minutes/hourly
How often should BA provide MW-hour meter readings to adjacent BA's
- ANSWER ✔✔60 minutes/hourly
TLR procedure (identifying TLR level and actions to be implemented)
needs updating how often - ANSWER ✔✔60 minutes/hourly
Hourly ATC for next 48 hours calculated how often - ANSWER ✔✔60
minutes/hourly
During EEA2/3 the energy deficient entity needs to update the RC how
often until alert is terminated - ANSWER ✔✔60 minutes/hourly