Question:
Calculate the Cost Schedule below.
Assume that the fixed cost is $55.
Q VC TC AFC AVC ATC MC
0 0 n/a n/a n/a n/a
1 10
2 30
3 60
4 100
5 150
6 210
Answer:
Q TFC TVC TC AFC AVC ATC MC
0 55 0 55 n/a n/a n/a n/a
1 55 10 65 55 10 65 10
2 55 30 85 27.5 15 42.5 20
3 55 60 115 18.33 20 38.33 30
4 55 100 155 13.75 25 38.75 40
5 55 150 205 11 30 41 50
6 55 210 265 9.17 35 44.17 60
Calculate the Cost Schedule below.
Assume that the fixed cost is $55.
Q VC TC AFC AVC ATC MC
0 0 n/a n/a n/a n/a
1 10
2 30
3 60
4 100
5 150
6 210
Answer:
Q TFC TVC TC AFC AVC ATC MC
0 55 0 55 n/a n/a n/a n/a
1 55 10 65 55 10 65 10
2 55 30 85 27.5 15 42.5 20
3 55 60 115 18.33 20 38.33 30
4 55 100 155 13.75 25 38.75 40
5 55 150 205 11 30 41 50
6 55 210 265 9.17 35 44.17 60