Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

FORMULATION EXAM: Introduction to Planning and Programming

Beoordeling
-
Verkocht
-
Pagina's
6
Cijfer
A+
Geüpload op
22-11-2021
Geschreven in
2021/2022

FORMULATION EXAM: Introduction to Planning and Programming FORMULATION EXAM: Introduction to Planning and Programming 1) Which cost analysis is focused on reasonable extrapolations from historical experiences with similar programs and usually result in higher costs? "Could Cost" "Fixed Costs" "Will Cost" "Should Cost 2) Which of the following represents the financial manager's role during the PPBE Programming Phase? Balance and prioritize requirements based on senior leader’s guidance Build and validate resource requirements Manage funding for the service’s different programs Validate and integrate services 3) A Life-Cycle Cost Estimate (LCCE) reflects major program reviews for Milestone A, B, and C. True False 4) Which of the following inputs is used in the PPBE Planning process? Program Objectives Memorandum (POM) Life Cycle Costs (LCC) Quadrennial Defense Review (QDR) Resource Management Decisions (RMD) 5) Which of the following provide guidance for the development of the Program Objective Memorandum (POM) of the PPBE Programming Phase? Program/Budget Reviews Service Guidance Budget Assessment Review Budget Adjustment 6) Which of the following is a focus of the PPBE Planning phase? Current execution Guidance for programming and budgeting Fund policies Pricing 7) Programmatic Guidance is captured in the Program Objective Memorandum (POM). True False 8) All of the following are included in an affordability analysis EXCEPT: Component Cost Estimate (CCE) All component fiscal obligations under TAO Program life-cycle constraints Portfolio fiscal obligations 9) Life Cycle Costs (LCC) and Total Ownership Costs (TOC) differ in several key areas. Match the description of the key element with its costs type (LCC or TOC). a) LCC In Logistics, includes depot maintenance and spares, but not delivery costs (FBCF). b) TOC For Training, includes system-specific training and schoolhouse and accession training. 10) An action taken in the immediate time frame that will decrease costs in the future is known as: Should cost Cost savings Will cost Cost avoidance 11) Resource Management Decisions resulting from issue papers are published in . November/December July 1st week in February August 12) What is the impact of the Defense Planning Guidance (DPG) document with respect to fiscal guidance? It establishes the strategic programmatic priorities and requirements for DoD. It establishes a 'bottom line' for each service. It establishes a balanced set of programs that respond to the guidance and priorities set forth thus far in the PPBE process. It establishes a detailed and comprehensive description of the proposed programs, including time- phased allocation of resources by program over five years. 13) Which document used in the DoD Planning Process assesses the threats and challenges that the nation faces and rebalances DoD's strategy, capabilities and forces to address today's conflicts and tomorrow's threats? Chairman's Program Recommendations (CPR) National Military Strategy (NMS) Chairman's Program Assessment (CPA) Quadrennial Defense Review (QDR) 14) Which of the following is used to prepare the Independent Cost Estimate (ICE) during the PPBE Programming Phase? Cost Analysis Requirements Description (CARD) Life-Cycle Cost Estimate (LCCE) Life-Cycle Cost (LCC) Program Office Estimate (POE) 15) The Total Obligation Authority (TOA) is the "top line" of the resources that the Office of the Secretary of Defense (OSD) designates to support a program. True False 16) Which of the following is NOT a principle player of the PPBE Planning Phase? Service Chiefs Secretary of Defense Chairman, Joint Chiefs of Staff Combatant Commanders 17) Which document acts as a bridge to transition the PPBE process from the Budgeting Phase to the Execution Phase of the PPBE Process? President's Budget (PB) Major Budget Issues (MBI) Funds Distribution Budget Estimate Submission (BES) 18) Planning for the PPBE Planning Process should begin about five years prior to the budget request year. True False 19) "Affordability" provides a way for programs to reduce underestimating their costs True False 20) What is the next step after a component program submission is sent to an issues team? Creation of an issue paper that presents alternatives to the Component program's position Creation of an analysis of the implications of the issue(s) Creation of an analysis of the impact to cost and personnel Creation of a rebuttal position that is sent to the Budget Review OSD (CAPE) Leads 1) Which of the following is true of the business financial manager’s role during the PPBE Programming Phase? Directly support Under Secretary of Defense (Comptroller) Directly support OSD budget analysts Directly support OMB budget analysis Directly support the PM 2) Which of the following is used to prepare the Program Office Estimate (POE) during the PPBE Programming Phase? Component Cost Estimate (CCE) Life-Cycle Cost (LCC) Cost Analysis Requirements Description (CARD) Quadrennial Defense Review (QDR) 3) Which of the following is a focus of the PPBE Planning phase? Provision of resources Compliance with DPG Pricing Threat vs. capabilities

Meer zien Lees minder
Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
22 november 2021
Aantal pagina's
6
Geschreven in
2021/2022
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
abram23 Adams State College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
675
Lid sinds
5 jaar
Aantal volgers
546
Documenten
3339
Laatst verkocht
1 maand geleden
QUALITY WORK OF ALL KIND OF QUIZ or EXAM WITH GUARANTEE OF AN A

Im an expert on major courses especially; psychology,Nursing, Human resource Management & Project writting.Assisting students with quality work is my first priority. I ensure scholarly standards in my documents . I assure a GOOD GRADE if you will use my work.

4.0

142 beoordelingen

5
78
4
26
3
16
2
3
1
19

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen