FINAL EXAM FOR:IS-1005: Public Assistance Alternative Procedures 100% ANSWERED

Beoordeling
-
Verkocht
-
Pagina's
9
Cijfer
A
Geüpload op
24-11-2021
Geschreven in
2021/2022

Final Exam for: IS-1005: Public Assistance Alternative Procedures Privacy Act Statement (Public Law 93 579) Each time that this test is loaded, you will receive a unique set of questions and answers. The test questions are scrambled to protect the integrity of the exam. 1. Under the Alternative Procedures Pilot Program for Permanent Work, the Applicant is granted ______ flexibility in repairing and rebuilding eligible facilities. A. minimal B. complete C. more D. less 2. When determining the reasonableness of Direct Administrative Costs, FEMA considers whether the employee's skill level is appropriate for the activities performed and: A. whether a portion of the Direct Administrative Cost allowance should be withheld B. if the work could have been performed by a pre-qualified contractor C. the level of effort required to perform an activity D. why the employee was hired for those specific job duties 3. All of the following are options for the Public Assistance Alternative Procedures Pilot Program for Debris Removal except: A. reduced Debris Removal B. recycling Revenue C. FEMA-Accepted Debris Management Plan D. reimbursement of Straight-Time for Force Account Labor This study source was downloaded by from CourseH on :47:23 GMT -06:00 This study reso

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

Final Exam for: IS-1005: Public Assistance Alternative
Procedures
Privacy Act Statement (Public Law 93 579)

Each time that this test is loaded, you will receive a unique set of questions and answers. The test
questions are scrambled to protect the integrity of the exam.




1. Under the Alternative Procedures Pilot Program for Permanent Work, the Applicant is
granted ______ flexibility in repairing and rebuilding eligible facilities.
A. minimal
B. complete




m
er as
C. more




co
eH w
D. less




o.
2. When determining the reasonableness of Direct Administrative Costs, FEMA considers
rs e
whether the employee's skill level is appropriate for the activities performed and:
ou urc
A. whether a portion of the Direct Administrative Cost allowance should be withheld
B. if the work could have been performed by a pre-qualified contractor
o

C. the level of effort required to perform an activity
aC s
vi y re


D. why the employee was hired for those specific job duties

3. All of the following are options for the Public Assistance Alternative Procedures Pilot
Program for Debris Removal except:
ed d




A. reduced Debris Removal
ar stu




B. recycling Revenue
C. FEMA-Accepted Debris Management Plan
is




D. reimbursement of Straight-Time for Force Account Labor
Th
sh




This study source was downloaded by 100000836386117 from CourseHero.com on 11-24-2021 01:47:23 GMT -06:00


https://www.coursehero.com/file/88171997/IS-1005docx/

, 4. Choose the false statement about Consolidation of Multiple Fixed Cost Estimate
Grants.
A. An Applicant may consolidate grants from different Categories of Work (Category C-G) or
consolidate within the same Category of Work.
B. The consolidated grant may be used to restore the pre-disaster condition of all or some
of the Applicant's facilities.
C. Consolidation of Multiple Fixed Cost Estimate Grants provides less flexibility to
Applicants in completing their projects.
D. An Applicant can decide to use Consolidation of Multiple Fixed Cost Estimate Grants
when it combines two or more fixed estimate grants into a single grant.

5. All of the following are special considerations for Alternative Procedures except which
one?
A. Hazard mitigation




m
B. Environmental and historic preservation




er as
co
C. Contractors




eH w
D. Insurance




o.
rs e
6. An example of a special consideration that must be documented is:
ou urc
A. Dumping debris in a landfill
B. Use of Grants Portal
o

C. Staffing requirements
aC s


D. Choosing a contractor
vi y re



7. How does FEMA cap consolidated fixed cost estimate grants?
A. As separate amounts for each individual fixed estimate grant.
ed d




B. At the combined amount of the eligible costs for the formerly separate, individual fixed
ar stu




estimate grants.
C. In separate phases as each project is completed and deemed eligible.
is




D. By the amount of ineligible costs for each of the individual grants.
Th




8. Expenses the Applicant incurs from administering and managing Public Assistance
awards that are directly chargeable to a specific project are called:
A. Eligible Administrative Costs
sh




B. Direct Administrative Costs
C. Public Assistance Grant Costs
D. Direct Project Costs




This study source was downloaded by 100000836386117 from CourseHero.com on 11-24-2021 01:47:23 GMT -06:00


https://www.coursehero.com/file/88171997/IS-1005docx/

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
24 november 2021
Aantal pagina's
9
Geschreven in
2021/2022
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Havilah Yale University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
292
Lid sinds
4 jaar
Aantal volgers
249
Documenten
2333
Laatst verkocht
1 maand geleden

3.6

44 beoordelingen

5
19
4
8
3
6
2
2
1
9

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen