1. Which of the following is NOT one of the principles of usercentered design?
A) Evaluate design to ensure usability.
B) Focus early on the users and their work.
C) Use iterative development.
D) Business requirements drive development.
Points Earned: 4.0/4.0
Correct Answer(s): D
2.
What type of stakeholders are those that do not use the system on day to day tasks, but use
information, such as reports, from the system.
A) Business stakeholders
B) Client stakeholders
C) Executive stakeholders
D) External stakeholders
Points Earned: 4.0/4.0
Correct Answer(s): C
3. Which of the following items is NOT a part of the application architecture?
A) programming languages and development tools
B) software
C) virtual private networks
D) userinterface technology
Points Earned: 3.0/3.0
Correct Answer(s): C
4.
A person that functions as an architect to plan, capture the vision, and understand the needs for a new
system is often called a ____________________.
A) software engineer
B) programmer analyst
http://gwinnetttech.angellearning.com/Section/Assessment/Question/GradeDelivery.aspx?entryId=7EF87AABA0E247AFA98A0CA9A4DC1F73&response_Id=… 1/19
,4/30/2015 Final Exam
C) software developer
D) systems analyst
Points Earned: 4.0/4.0
Correct Answer(s): D
5.
A big part of designing the environment is identifying and defining all the types of computing devices
that will be required.
A) True
B) False
Points Earned: 5.0/5.0
Correct Answer(s): True
6. Clients play what role in the development of the new system?
A) Fund the project
B) Lead the project team
C) Define business processes
D) Develop the project plan
Points Earned: 3.0/3.0
Correct Answer(s): A
7. Persons who regularly interact with the system as part of their jobs are called _______.
A) operational stakeholders
B) client stakeholders
C) user stakeholders
D) executive stakeholders
Points Earned: 4.0/4.0
Correct Answer(s): A
8. Performing indepth fact finding to understand details is done as part of which Core Process?
A) 1
B) 3
C) 2
D) 6
E) 4
http://gwinnetttech.angellearning.com/Section/Assessment/Question/GradeDelivery.aspx?entryId=7EF87AABA0E247AFA98A0CA9A4DC1F73&response_Id=… 2/19
, 4/30/2015 Final Exam
F) 5
Points Earned: 4.0/4.0
Correct Answer(s): B
9.
requirements are based on the procedures and rules that the organization uses to run its business.
A) System
B) Logical
C) Physical
D) Functional
Points Earned: 0.0/3.0
Correct Answer(s): D
10. Which one of the six core process can be considered as a “bridge” process.
A) Design system components.
B) Discover and understand the details.
C) Build, test and integrate system components.
D) Identify the problem and obtain approval.
Points Earned: 5.0/5.0
Correct Answer(s): A
11.
The term _______ refers to all the people who have an interest in the successful implementation of
the system.
A) clients
B) managers
C) users
D) stakeholders
Points Earned: 4.0/4.0
Correct Answer(s): D
12. When a system is partitioned into pieces, each piece is referred to as a _________________.
A) program
B) application
C) subsystem