Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Overig

Cambridge Technicals Level 3 IT - Unit 8 - Project Management - D3 Coursework

Beoordeling
-
Verkocht
-
Pagina's
8
Geüpload op
09-02-2022
Geschreven in
2018/2019

Coursework report for Unit 8 project management, D3. Already passed marking and overall received D*. D3: Prepare a project closure report based on the execution phase review of the identified project - Learners are required to prepare a project closure report based on the execution phase review carried out for M3. The project closure report must include the actions identified in the phase review which must be carried out prior to the project being closed. The bullet points within the teaching content should be included in the project closure report. - Using the information developed from Activity 1, prepare a project closure report. If you don’t have enough information to complete any of the elements of the report, explain what type of information you would include in these sections

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

Project Closure Report
Project summary:
Project background:

I will be creating an e-commerce website that allows a local artist to promote their paintings and other
artwork online. This will allow them to sell their art to a wider audience as anyone from around the world will
be able to access it at any time (24/7). The purpose of this website is to promote and sell artwork from a
local artist, who has limited knowledge of online stores and websites. This in turn will allow for a wider
reach to people from around the world that want to access the artist’s work at any time in the day.

Project objectives:

The website aims to promote the artists paintings and other artwork through an online store. The website
should work efficiently without any faults, so that the customers can use it. It is also necessary to discuss
alternative options with the client so that they can make their own choices and know that there are other
options, which may be more suited to them. The implementation of the client’s decision will also have to be
planned and the project will have to be carried out to conclusion with the project team. It is then a
requirement to evaluate the outcome of the project whether the outcome was expected or not. If the project
is successful than the artist should be able to reach a wider audience through the website. The website will
contain an online store, which allows people from any location to access the artists’ products anytime.

Project closure synopsis:

The project has achieved the following original objectives:

PID Objective 1:

To create a fully functioning website that advertises the artists’ artwork; this website will also contain an
online store that allows customers to purchase the artists’ products.

PID Objective 2:

The website will allow for a wider reach to people from around the world that want to access the artist’s
work at any time in the day (24/7) rather than just the local people that artist previously acquired business
from.


The project has not achieved the following original objectives:

PID Objective 3:

The project has achieved all of the original objectives set.

PID Objective 4:

The project has achieved all of the original objectives set.

, Project performance:
Project achievements:

The main objectives within the Project Initiation Document was to:


PID Objective 1:

To create a fully functioning website that advertises the artists’ artwork; this website will also contain an
online store that allows customers to purchase the artists’ products.

PID Objective 2:

The website will allow for a wider reach to people from around the world that want to access the artist’s
work at any time in the day (24/7) rather than just the local people that artist previously acquired business
from.


PID Objective 3:

We must create the website whilst keeping all the risks and consequences to a minimum, by sticking to
allocated time frames, budgets etc. This ensures the client is happy with our services and we, nor the
client, have to pay any extra fees or time that was not initially agreed to.




Outstanding objectives:

The following objectives are still being worked on, or have been agreed as not being achieved:

PID Objective 1:

As the product was rushed towards the end, we have not had time to test it once more. Therefore as an
outstanding object, the product tester will have to test the website once more to filter out any minor
functionality problems that may have been missed.

PID Objective 2:

There are no more outstanding objectives.

Project schedule overview:

The business case for the project was approved on dd/mm/yyyy.

Completion
Milestone Revised date Actual date
planned date
Initiation 25.09.2019 - 25.09.2019
In the initiation
phase the
objectives,
scope,
purpose and
deliverables
will be defined

Gekoppeld boek

Geschreven voor

Study Level
Publisher
Subject
Course

Documentinformatie

Geüpload op
9 februari 2022
Aantal pagina's
8
Geschreven in
2018/2019
Type
OVERIG
Persoon
Onbekend

Onderwerpen

$16.59
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
8K University of Southampton
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
92
Lid sinds
4 jaar
Aantal volgers
32
Documenten
22
Laatst verkocht
3 weken geleden

3.5

17 beoordelingen

5
6
4
4
3
3
2
1
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen