Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Case uitwerking

Workshop - The Jogging Line in Action - Case Project Management Case Studies in Project, Program, and Organizational Project Management, ISBN: 9781118174296

Beoordeling
-
Verkocht
-
Pagina's
4
Cijfer
A
Geüpload op
13-02-2022
Geschreven in
2017/2018

This note includes my personal answer to cases in the book mentioned below: Milosevic, D. Z., Patanakul, P., & Srivannaboon, S. (2010). Case Studies in Project, Program, and Organizational Project Management. John Wiley and Sons Inc.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

CASE STUDIES IN PROJECT MANAGEMENT SYSTEMS 1



Workshop: The Jogging Line in Action
Dragan Z. Milosevic, Peerasit Patanakul, and Sabin Srivannaboon

I. PROBLEM AND SOLUTION

Problem: Can we consider the Jogging Line approach as an effective schedule control tool? What
are its benefits and drawbacks that could help determine the extent of its effectiveness?

II. EXECUTIVE SUMMARY

Ball Inc. is a widely known consulting firm for advice in management, coaching, and
project specialist. One of its respectable senior consultants was Konrad Cerni, certified as a Project
Management Professional and Program Management Professional. In a workshop to be led by him,
he decided to teach a technique that for him is essential and precise since there was a limited time
to discuss all tools that comprised of more than fifty. He decided to pick only the necessary tools
and that includes the Jogging Line. By definition, the Jogging Line is one of the widely used
schedule control tools that indicate the amount of time each project activity is ahead or behind
schedule. Hence, it is used to predict the project completion date and map counteractive actions
necessary to exterminate any potential delay. According to Cerni, this Jogging Line is usually used
as an informal tool. Its results are not recorded and all you need are a chart and a marker.
III. BRIEF HISTORY

Konrad Cerni, a Program and Project Management Professional with expertise in project
management tools and metrics, was one of the prominent senior consultants of Ball, Inc. which is
a local management consulting firm that is widely known for its assistance in organizational
change management; development of coaching skills; and technology, project, and operations
management improvements. Konrad was assigned to lead a workshop at the client’s premises that
would talk about the project management tools and was expecting more than 30 project and
program managers in the workshop. The project management consisted of more than fifty tools
however, it was not feasible to discuss all since there was a limited time of nine hours, starting
from eight in the morning up to five in the afternoon having only a one-hour lunch break. Thus,
Konrad opt to select the significant tools only, and the “Jogging Line” was one of the critical tools.
Konrad explained to the managers that the jogging line is one of the critical and widely
used schedule control tools that shows or indicates the amount of time each project activity is
ahead or behind schedule. He also added that the line point out the fraction of accomplishment for
each activity to its left, and to its right is what remains or still needs to be completed. It is beneficial
since the amount of time each activity is advanced or delayed, it could help in predicting the project
completion date and map corrective actions necessary to eradicate any potential delay.
Furthermore, Konrad stated that a jogging line is an informal tool whereas the outcomes are not
documented since the required materials are chart and marker only. He also explained that there
are three rules when using the jogging line, which include: (1) Rule of the past is everything to the
left of the jogging line is done. (2) Rule of the present means that everything on the jogging line
is at this moment. (3) Rule of proactive management, which is the most important, means that
everything to the right of the jogging line remains to be done.

Gekoppeld boek

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
13 februari 2022
Aantal pagina's
4
Geschreven in
2017/2018
Type
Case uitwerking
Docent(en)
Dr. manahan
Cijfer
A

Onderwerpen

$5.98
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
GelC
1.0
(1)

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
GelC Course Hero
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
5
Lid sinds
4 jaar
Aantal volgers
4
Documenten
34
Laatst verkocht
2 jaar geleden

1.0

1 beoordelingen

5
0
4
0
3
0
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen