Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Agile E1 (CBO) 60566 1) Which of the following statements are useful visual radiators?

Beoordeling
-
Verkocht
-
Pagina's
5
Cijfer
A+
Geüpload op
14-02-2022
Geschreven in
2021/2022

1) Which of the following statements are useful visual radiators? Wall of frame to recognize the associates. Key failurepoints and important rules & regulations on digital/whiteboard to keep the associates aware and alert key events and happening on digital display/whiteboard to keep the associates informed All of the Above (Ans) 2) Which of the following is not a benefit of visualization of work Reduced inflow of work items (Ans) Reduced status reporting overhead Quick identification of blocked items Reduced cycle time of work item 3) What is the most effective way to identify improvement opportunities for Value log? Automation team analyzes work items and identifies improvement opportunities Performance Improvement (PI) Champion performs Value Stream Mapping and identifies improvement opportunities Every Team member constantly questions. "Is there a better way to do our work?",and identifies improvement opportunities (Ans) Team members wait for the management to set up ideation events and then identify improvement opportunities 4) Which of the following is not true about Value Maximization Scrum? Composition of scrum can change for each sprint depending on the Value Log opportunities selected for that sprint BAU remains the top priority and the team works on the value log opportunities without impacting BAU scrum teams members full time everyday on the value log opportunities (Ans) scrum teams members make a little time everyday to work on value log opportunities 5) Survey Q, Non-scoring: what benefits are you experiencing with agile for CBO? Select all that apply. I feel more happy and empowered (Ans) I feel more productive (Ans) I feel better team spirit (Ans) I am able to see the big picture of my work (Ans) I don't see any benefits 6) Which of the following is the least important consideration while forming a value maximization scrum? A) Associate's years of experience (Ans) B) value log entries selected for the sprint C) potential impact on BAU D) associate's skills 7) Who can add entries to value log? select the correct option(s) and click Submit. Performance Improvement (PI) Champion SMEs of the Team Team Lead Anyone in the team (Ans) 8) Which of the following is not an intended outcome of collective work management? A team who makes all the decisions and a Lead who does not monitor the team (Ans) A team that is empowered & motivated,and a Lead who acts as a mentor A team that is self-organized and a Lead who acts as a facilitator A team that collaborates well and a Lead who acts as a servant leader 9) What should you do when you receive a brief communication that the format of input files will change from next month? a.) understand the change by getting the details of the change as well as a sample input file in the new format b.) align your people (eg. training), process(e.g sops), and technology (e.g tool configuration) in accordance with the change c.) both option (a.) and (b.) (Ans) d.) wait for the detailed communication as you received only a brief communication 10) A BAU team is already struggling to complete their daily BAU work. So, they should defer Value Maximiza .Select the correct option(s) and click Submit. True - Instead of doing Value Maximization Scrum, they should rather use that time to complete a few more BAU tasks False - Value Maximization Scrum must be done to achieve Audit compliance True - BAU team should only do BAU work. They should not focus on anything else, including Value Maximization Scrum False - They should start Value Maximization Scrum to identify the pain points and improve their way of doing the BAU work​ (Ans) 11) What is the best way to continuously capture and share a team's knowledge ? Continuously updating knowledge into a central repository (Ans) conducting knowledge sharing sessions Sharing knowledge during team meetings Sharing knowlege through emails 12) Which of the following is an Agile approach for work allocation in a team? Team lead assigns works to team members without consulting them One of the Senior SMEs assigns work to team members without consulting them Customer assigns work to team members without consulting them Team lead consults team members and assigns work to them (Ans) 13) Which of the following is the most practical and Agile approach for achieving work coordination among a distributed team? Relocating all team members into one location to promote face-to-face conversation Having a digital Kanban board that is common for all team members across the locations (Ans) Designating a team member to coordinate across locations Having Daily Coordination Meetings among Location Leads 14) Which of the following is not a mandatory practice of Value Maximization scrum? Burndown Chart (Ans) Sprint Value Log Scrum Team 15) Which of the following is not recommended for change implementation? Perform impact analysis and highlight any risks in Change Advisory Board (CAB) meeting Perform multi-taking while executing Change implementation steps (Ans) Follow Make-Checker practice while executing the Change implementation steps Review the implementation steps with the Change Requestor and ensure that there is no ambigulty 16) What is the best approach for a team to keep the stakeholders continuously updated on the work status? Sending Daily, Weekly, and Monthly status report. Explaining the status in Daily status Update meetings sharing a digital/physical Kanban board that is continuously updated (Ans) Designating a senior Team member to keep the stakeholders Updated 17) When you discover an uncommunicated change in your tool (e.g. workflow management tool, itsm tool, etc),we may take following steps:- As a team, understand the change in detail, and update SOPs, scripts ,etc.If required As a team, investigate why the change communication was missed and take corrective actions to avoid recurrence As a team, analyze any past work items were impacted by this change, and take necessary corrective action if required All of above (Ans) 18) who should be a Product owner (PO) in a Value Maximization scrum team?Select the correct option(s) and click submit Only Performance Improvement (PI) Champion because he/she has a good understanding of six sigma and Value Stream Mapping Anyone who has a clear vision for the selected Value Log opportunities and who can validate whether the implementation achieved the expected benefits (Ans) Only Lead because he/she has a good underst

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

Your text here 1

1) Which of the following statements are useful visual radiators?

Wall of frame to recognize the associates.

Key failurepoints and important rules & regulations on digital/whiteboard to keep the associates
aware and alert

key events and happening on digital display/whiteboard to keep the associates informed

All of the Above (Ans)

2) Which of the following is not a benefit of visualization of work

Reduced inflow of work items (Ans)

Reduced status reporting overhead

Quick identification of blocked items

Reduced cycle time of work item

3) What is the most effective way to identify improvement opportunities for Value log?

Automation team analyzes work items and identifies improvement opportunities

Performance Improvement (PI) Champion performs Value Stream Mapping and identifies
improvement opportunities

Every Team member constantly questions. "Is there a better way to do our work?",and identifies
improvement opportunities (Ans)

Team members wait for the management to set up ideation events and then identify
improvement opportunities

4) Which of the following is not true about Value Maximization Scrum?

Composition of scrum can change for each sprint depending on the Value Log opportunities
selected for that sprint

BAU remains the top priority and the team works on the value log opportunities without
impacting BAU

scrum teams members full time everyday on the value log opportunities (Ans)

scrum teams members make a little time everyday to work on value log opportunities

5) Survey Q, Non-scoring: what benefits are you experiencing with agile for CBO? Select all
that apply.




This study source was downloaded by 100000831887191 from CourseHero.com on 02-14-2022 03:27:13 GMT -06:00


https://www.coursehero.com/file/63060491/Agile-E1-CBO-60566rtf/

, I feel more happy and empowered (Ans)

I feel more productive (Ans)

I feel better team spirit (Ans)

I am able to see the big picture of my work (Ans)

I don't see any benefits

6) Which of the following is the least important consideration while forming a value
maximization scrum?

A) Associate's years of experience (Ans)

B) value log entries selected for the sprint

C) potential impact on BAU

D) associate's skills

7) Who can add entries to value log?

select the correct option(s) and click Submit.

Performance Improvement (PI) Champion

SMEs of the Team

Team Lead

Anyone in the team (Ans)

8) Which of the following is not an intended outcome of collective work management?

A team who makes all the decisions and a Lead who does not monitor the team (Ans)

A team that is empowered & motivated,and a Lead who acts as a mentor

A team that is self-organized and a Lead who acts as a facilitator

A team that collaborates well and a Lead who acts as a servant leader

9) What should you do when you receive a brief communication that the format of input files
will change from next month?

a.) understand the change by getting the details of the change as well as a sample input file in
the new format

b.) align your people (eg. training), process(e.g sops), and technology (e.g tool configuration) in


This study source was downloaded by 100000831887191 from CourseHero.com on 02-14-2022 03:27:13 GMT -06:00


https://www.coursehero.com/file/63060491/Agile-E1-CBO-60566rtf/

Geschreven voor

Vak

Documentinformatie

Geüpload op
14 februari 2022
Aantal pagina's
5
Geschreven in
2021/2022
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.97
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EvaTee Phoenix University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
5235
Lid sinds
4 jaar
Aantal volgers
3570
Documenten
56251
Laatst verkocht
12 uur geleden
TIGHT DEADLINE? I CAN HELP

Many students don\'t have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don\'t hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

3.8

952 beoordelingen

5
453
4
167
3
174
2
48
1
110

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen