Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Recap Summary of PRM-3701 Answers and Questions

Beoordeling
3.0
(2)
Verkocht
5
Pagina's
40
Cijfer
A+
Geüpload op
27-02-2022
Geschreven in
2020/2021

Summary of Questions and Answers for your Exams

Instelling
Vak

Voorbeeld van de inhoud

Chapter 1:


1. Define a project. What are five characteristics which help differentiate
projects from other functions carried out in the daily operations of the
organization?


1). A project is a complex, non-routine, one-time effort limited by time, budget,
resource, and specifications.


2). Differentiating characteristics of projects from routine, repetitive daily work are
below:


a). A defined life span


b). A well-defined objective


c). typically involves people from several disciplines


d). A project life cycle


e). Specific time, cost, and performance requirements.


4 stages of Project Life Cycle:


1. Defining: (GSTR)


a). Goals.


b). Specifications.


c). Tasks.


d). Responsibilities,


2. Planning: (SBRRS)


a). Schedules.


b). Budgets.


c), Resources.


d). Risks.


e), Staffing.




1

,3. Executing: A major portion of the project work take place – both physical and
mental.


(SCQF)


a). Status Reports


b). Changes.


c). Quality.


d). Forecasts.


4. Closing: (TTREL)


a). Train Customer.


b). Transfer documents.


c). Release Resources.


d). Evaluation.


e). Lessons learned.


2. What are some of the key environmental forces that have changed the way
projects are managed? What has been the effect of these forces on the
management of projects?


1). Some key environmental forces that have changed the way we manage projects are


a). the product life cycle,


b). knowledge growth,


c). global competition,


d). organization downsizing,


e). technology changes,


f). time-to-market.


2). The impact of these forces:


a). more projects per organization,


2

, b). project teams responsible for implementing projects,


c). accountability,


d). changing organization structures,


e). need for rapid completion of projects,


f). linking projects to organization strategy and customers,


g). prioritizing projects to conserve organization resources,


h). alliances with external organizations, etc.


3. Why is the implementation of projects important to strategic planning and
the project manager?


Strategic plans are implemented primarily through projects—e.g.,


a). a new product,


b). a new information system,


c). a new plant for a new product.


The project manager is the key person responsible for completing the project


-) on time,


-) on budget, and


-) within specifications so the project’s customer is satisfied.


If the project is not linked to the strategic plan of the organization, resources
devoted to the project are wasted and a customer need is not met. This lack of
connectivity occurs more in practice than most would believe.


4. The technical and sociocultural dimensions of project management are two
sides to the same coin. Explain.


The system and sociocultural dimensions of project management are two sides of the
same coin because successful project managers are skillful in both areas.


The point is successful project managers need to be very comfortable and skillful in
both areas.




3

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
27 februari 2022
Aantal pagina's
40
Geschreven in
2020/2021
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$6.29
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Beoordelingen van geverifieerde kopers

Alle 2 reviews worden weergegeven
1 jaar geleden

I couldn't find the answers for my assignment

4 jaar geleden

3.0

2 beoordelingen

5
1
4
0
3
0
2
0
1
1
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
jayjayza University of South Africa (Unisa)
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
158
Lid sinds
9 jaar
Aantal volgers
121
Documenten
29
Laatst verkocht
1 jaar geleden

3.3

51 beoordelingen

5
13
4
11
3
13
2
4
1
10

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen