Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Fiscal Law Final Exam answered- spring 2022 | Graded A+

Beoordeling
-
Verkocht
-
Pagina's
9
Cijfer
A+
Geüpload op
01-03-2022
Geschreven in
2021/2022

QUE ST ION 1 1. It is appropriate for the Army to acquire lawn cutting services through the Project Order Statute. True False 4 points QUE ST ION 2 1. The proper amount of money to obligate at the award of a firm fixedprice contract is: The full amount of the contract. Nothing until the contractor performs the required work. Half of the total liability. A conservative amount based on the government’s estimated future requirements. 4 points QUE ST ION 3 1. How long does the Department of Defense Financial Management Regulation give an individual discovering a possible Antideficiency Act violation to report it to his/her chain of command and the Financial Management Comptroller? 5 working days. 2 weeks. 90 calendar days. 45 days. 4 points QUE ST ION 4 1. On 1 September 2011 the command at New Sands Missile Range purchases an x-ray machine for the installation hospital, which arrives and is accepted on 15 September 2011. The x-ray machine is not needed until August of 2012, when an increased number of Soldiers arrive due to BRAC. Assuming there is no applicable delivery or production lead time exception (as this is a commercial item and readily available off the shelf), has an ADA violation been committed and is it correctable? No ADA violation has been committed. As the bona fide need is in 2012, an ADA violation has been committed but it is correctable. As the bona fide need is in 2012, an ADA violation has been committed, and is not correctable since proper funds, FY 2012 O&M (or procurement, This study source was downloaded by from CourseH on :56:14 GMT -06:00 depending on the value) were not available at the time of obligation. Although the bona fide need is in 2012, there is no ADA violation because the command was engaged in advanced planning, and was smartly purchasing an item ahead of the expected need and perhaps even getting a better price. 4 points QUE ST ION 5 1. On 30 September 2010, $275,000 remains in the Operations and Maintenance, Army (OMA) allowance at the XVIII Airborne Corps. On that day, the contracting officer is about to award a supply contract, obligating $300,000 OMA. Award of the supply contract: Will cause an Antideficiency Act (ADA) violation because the contract price exceeds the amount of OMA available at the XVIII Airborne Corps. Will cause an ADA violation unless the contracting officer shows that she neither knew nor should have known that the XVIII Airborne Corps had only $275,000 in the OMA account. Will cause an ADA violation if the XVIII Airborne Corps’s major command, FORSCOM, lacks sufficient OMA funds in its formal subdivision to cover the overobligation. Will not cause an ADA violation if Congress enacts either a Continuing Resolution Authority (CRA) or a permanent appropriation before the vendor seeks payment for the supplies. Will not cause an ADA violation because the OMA account at the XVIII Airborne Corps was a target/allowance and an obligation in excess of a target/allowance can never result in an ADA violation. 4 points QUE ST ION 6 1. Assume a contracting officer (KO) at Ft. Bragg, NC awards a contract on 20 September 2010 for $10 million inadvertently committing an ADA violation by causing the Army to exceed the amount available in its FY 2010 O&M appropriation. Which of the following is correct: The KO is subject to administrative discipline because good faith or mistake of fact does not relieve him from liability under the ADA. There is no ADA violation if DoD has sufficient funds to cover the overage. The KO is not subject to criminal or adverse administrative action because Ft. Bragg's allotment is an informal subdivision of funds. The KO will surely go to jail for an ADA violation, serving a mandatory minimum. 4 points QUE ST ION 7 1. The fiscal year for the U.S. Government is a 12-month period from: This study source was downloaded by from CourseH on :56:14 GMT -06:00 1 July through 30 June. 1 October through 30 September. 1 September through 30 August. 1 January through 31 December 4 points QUE ST ION 8 1. Any obligation of appropriated funds must comply with which of the following fiscal constraints: The Minimum Needs Rule. The Bona Fide Needs Rule. The Paperwork Reduction Act. The Cost Accounting Standards Board. Omnibus Budget Reconciliation Act of 1947. 4 points QUE ST ION 9 1. Due to increased operations in Afghanistan, the Army is running low on Hellfire missiles (air launch, anti-tank missile.) Having exhausted the Missile Procurement, Army appropriation, an enterprising comptroller recommends using funds from the Procurement of Ammunition, Army appropriation. His argument is that “missiles are a type of ammunition so we can use either.” Can the Army use the Procurement of Ammunition, Army appropriation? Yes. It is for the war effort so anything goes. Yes. The enterprising comptroller is correct; missiles are a type of ammunition. No. This purchase should be handled by the Department of State as it deals with overseas activities. No. There is a specific appropriation for the purchase of missiles. This is the only proper appropriation that can be used. 4 points QUE ST ION 10 1. You work at the Orange Sands Missile Range (OSMR) Legal Office. The SJA wants your advice on two pieces of equipment that he personally would like to see purchased for use in the common break area of the legal office. He wants to use appropriated funds to buy a refrigerator and a microwave. His rationale is that employees (both military and civilian) need a place to This study source was downloaded by from CourseH on :56:14 GMT -06:00 store and prepare food they bring in from home. You respond by telling him: (Select the best answer) The refrigerator and microwave must be purchased using private resources. The SJA may either pay for their purchase entirely out of his own pocket or he may take up a collection from others in the office who will also utilize these items. Absent any local or service-level policies to the contrary, the refrigerator and microwave may be purchased with Operations and Maintenance, Army appropriations. The Comptroller General has determined that such equipment reasonably relates to the efficient performance of the agency. The refrigerator and microwave may be purchased with Operations and Maintenance, Army appropriations only if it is determined commercial eating facilities are not reasonably available within the immediate area of OSMR, or it is expected that employees will be required to work evening or weekend hours. Since the primary purpose of the equipment is to enhance office morale, Morale, Welfare, and Recreation (MWR) funds should be used for the proposed purchase. 4 points QUE ST ION 11 1. On 1 September 2010 a Contracting Officer properly awards a contract to ABC Corporation for 1000 widgets. The widgets are delivered on 1 November 2010. The Contracting Officer correctly determined that the "leadtime" exception for supplies was applicable under the circumstances. The government paid ABC Corporation on 15 November 2010. What day did obligation of funds for this contract occur? 1 September 2010 1 November 2010 15 November 2010 The Government and the contractor can agree on an obligation date so the government can use funds from the fiscal year with the most money available. 4 points QUE ST ION 12 1. If a particular expenditure is not provided for by Congress, in order to meet the requirements of the Purpose Statute, 31 U.S.C. § 1301, the expenditure must be necessary and incident to the proper execution of the general purpose of the appropriation. The GAO has created a three-part test to determine whether an expenditure is a “necessary expense” of an appropriation. Which of the following IS NOT part of the three-part purpose test? The expenditure must be necessary and incident to the purposes This study source was downloaded by from CourseH on :56:14 GMT -06:00 of the appropriation. The expenditure must not be prohibited by law. The comptroller must certify the funds. The expenditure must not be otherwise provided for. 4 points QUE ST ION 13 1. A continuing resolution is: an authorization act an appropriation, in the form of a joint resolution, that provides budget authority for federal agencies, specific activities, or both to continue operation when Congress and the President have not completed action on the regular appropriations acts by the beginning of the fiscal year The Department of Defense Appropriations Act none of the above 4 points QUE ST ION 14 1. The Department of Justice Trial Attorneys spoke to your contracting officer because the contractor was successful on a claim that was filed by the contractor on a 2005 construction project. The Court of Federal Claims ruled that the contractor's claim was based on an in-scope modification and the agency is responsible for paying the claimed amount. Fortunately, the funds which funded the original contract are not yet closed. Unfortunately, the expired funds which funded the original contract are exhausted. How should the agency handle this judgment? The contracting officer should seek payment from the Judgment Fund and reimbursement using current funds. The contracting officer should seek payment from the Judgment Fund and disregard any reimbursement since the funds are exhausted. The contracting officer should reallocate the FY 2005 funds to create funding to pay the judgment. The contracting officer cannot pay the claim without creating an Antideficiency Act Violation. 4 points QUE ST ION 15 1. Mr. Sanders is a Government Commercial Purchase Card (GCPC) holder at Fort Coop. His boss, COL Perdue, is the G-4 (Logistics Officer). One of her collateral duties as the G-4 includes serving as the certifying official for the ten GCPC holders in her office. Mr. Sanders used his GCPC to pay for BG Rooster’s (Ft. Coop’s Commander) annual Labor Day BBQ for the 25 military This study source was downloaded by from CourseH on :56:14 GMT -06:00 and civilian employees and 12 contractors that work in Fort Coop’s headquarters building. It is now 1 November and someone is questioning the purchase. Which statement is true? Commanders have complete authority and are certainly entitled to treat their employees to a BBQ once a year. Since the expenditure obviously was made with last year’s funds, and the period of availability of those funds has ended, it’s really too late to do anything. Since food is generally considered a personal expense, the only issue raised by these facts is a potential ADA violation. COL Perdue could be held pecuniarily liable if the purchase is found to be improper. 4 points QUE ST ION 16 1. An accountable officer is not liable for an improper payment: if there was a lack of fault or negligence; if the certification was based upon official records and the accountable officer using reasonable diligence could not have discovered the correct information; or if the obligation was incurred in good faith, no law specifically prohibits the payment, and the government received some benefit. in some parallel universe. In our world, an accountable officer of the U.S. Government is always strictly liable for improper payments. if the accountable officer obtained an advance decision from the proper authority and the improper payment was made in reliance on that advanced decision, or if he's a DoD Departmental Accountable Official and there was no fault or negligence. if he was completely without fault or negligence, and he sought and reasonably relied upon the advice of his Judge Advocate before certifying the voucher for payment. 4 points QUE ST ION 17 1. When working with the reprogramming of military construction appropriations, some of the permissible reasons for reprogramming of military construction and family housing funds are that reprogramming is necessary in response to: Emergencies. Accommodation of unexpected price increases. A need to restore or replace damaged or destroyed facilities. All of the above. 4 points QUE ST ION 18 This study source was downloaded by from CourseH on :56:14 GMT -06:00 1. When an agency “reprograms” funds, there is no change in the total amount available in the appropriations account. True False 4 points QUE ST ION 19 1. When operating under Continuing Resolution Authority, government agencies: (Choose the best answer). Are not authorized to obligate funds Are authorized to obligate funds, but only to pay for contracts awarded during the previous fiscal year. May obligate funds for new contracts, but only if the new contract is not a “new start.” May continue on as normal, because CRA has no effect on the authority to obligate funds. 4 points QUE ST ION 20 1. Which is the most likely example of a project that would be proper using humanitarian and civic assistance (HCA) authority (10 U.S.C. § 401)? Building of a state-of-the-art two story health clinic in Kandahar, Afghanistan, by an infantry platoon. An Army doctor training local civilian doctors to stitch and bandage a local boy's injured leg in Lagos, Nigeria, while on a COCOM approved combined training exercise with the Nigerian Army. Grading and paving of a 5-mile road from Ba'quabah and Al Khalis, Iraq, by an engineering company. Purchase of 1,000 math, science, and history books, 300 student desks, a year's supply of paper and pencils for a school in Herat, Afghanistan. 4 points QUE ST ION 21 1. True or False. DoD Commanders tasked to provide disaster assistance in Haiti following an earthquake can fund humanitarian assistance projects for the local civilian population with the Commander's Emergency Response Program (CERP). True False 4 points QUE ST ION 22 This study source was downloaded by from CourseH on :56:14 GMT -06:00 1. Under the Military Construction Codification Act (10 U.S.C. §2801), a “Military Construction Project” is defined as: Any construction, maintenance and repair carried out on a military installation regardless of the source of funding. All military construction work necessary to produce a complete and usable facility or a complete and usable improvement to an existing facility. All specified military construction carried out on a military installation with a funded cost of $1.5 million or greater. Any specified or unspecified construction carried out by the Corps of Engineers using Operations and Maintenance funds. 4 points QUE ST ION 23 1. Which U.S. Government agency is primarily responsible for funding foreign humanitarian or security assistance provided to our allies? DoD- Department of Defense USDA- U.S. Department of Agriculture DoS- Department of State The U.S. Treasury Department 4 points QUE ST ION 24 1. True or False. In accordance with Army Regulations, construction projects which have a common support purpose but are not mutually dependent are funded as separate projects. True False 4 points QUE ST ION 25 1. Combined Security Transition Command-Afghanistan (CSTC-A) has the mission to train and equip the Security Forces of Afghanistan. The CSTC-A Commander wants to train an Afghan Battalion on Airborne Operations. The training will take three months. It will include a two-month long airborne school and one month of training on the Military Decision Making Process (MDMP). It will also cost approximately $15 million to conduct the 3-month training event. By the way, you have to build the school house and training facilities for approximately $12 million. Can CSTC-A pay for all of this? CSTC-A can fund the training with appropriations that Congress has provided DoD, but we cannot build the school or training facilities because this cost exceeds the contingency construction authority. Yes sir, but only if we can get the DoS funds to pay for it, since this is This study source was downloaded by from CourseH on :56:14 GMT -06:00 clearly "Big T" Security Assistance Training. We can legally fund all the planned training and construction with the ISFF appropriation. We can legally fund all the planned training and construction with the ASFF appropriation. This study source was downloaded by from CourseH on

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

QUESTION 1
1. It is appropriate for the Army to acquire lawn cutting services through
the Project Order Statute.

True

False

4 points
QUESTION 2
1. The proper amount of money to obligate at the award of a firm fixed-
price contract is:
The full amount of the contract.
Nothing until the contractor performs the required work.
Half of the total liability.
A conservative amount based on the government’s estimated
future requirements.
4 points
QUESTION 3
1. How long does the Department of Defense Financial Management
Regulation give an individual discovering a possible Antideficiency Act
violation to report it to his/her chain of command and the Financial
Management Comptroller?
5 working
days.
2 weeks.
90 calendar
days.
45 days.

4 points
QUESTION 4
1. On 1 September 2011 the command at New Sands Missile Range
purchases an x-ray machine for the installation hospital, which arrives and is
accepted on 15 September 2011. The x-ray machine is not needed until
August of 2012, when an increased number of Soldiers arrive due to BRAC.
Assuming there is no applicable delivery or production lead time exception
(as this is a commercial item and readily available off the shelf), has an ADA
violation been committed and is it correctable?
No ADA violation has been committed.
As the bona fide need is in 2012, an ADA violation has been committed
but it is correctable.
As the bona fide need is in 2012, an ADA violation has been committed,
and is not correctable since proper funds, FY 2012 O&M (or procurement,


This study source was downloaded by 100000829818949 from CourseHero.com on 03-01-2022 04:56:14 GMT -06:00


https://www.coursehero.com/file/44882224/Fiscal-Law-Final-Examdocx/

, depending on the value) were not available at the time of obligation.
Although the bona fide need is in 2012, there is no ADA violation
because the command was engaged in advanced planning, and was
smartly purchasing an item ahead of the expected need and perhaps
even getting a better price.
4 points
QUESTION 5
1. On 30 September 2010, $275,000 remains in the Operations and
Maintenance, Army (OMA) allowance at the XVIII Airborne Corps. On that day,
the contracting officer is about to award a supply contract, obligating
$300,000 OMA. Award of the supply contract:
Will cause an Antideficiency Act (ADA) violation because the contract
price exceeds the amount of OMA available at the XVIII Airborne Corps.
Will cause an ADA violation unless the contracting officer shows that she
neither knew nor should have known that the XVIII Airborne Corps had
only $275,000 in the OMA account.
Will cause an ADA violation if the XVIII Airborne Corps’s major command,
FORSCOM, lacks sufficient OMA funds in its formal subdivision to cover
the overobligation.
Will not cause an ADA violation if Congress enacts either a Continuing
Resolution Authority (CRA) or a permanent appropriation before the
vendor seeks payment for the supplies.
Will not cause an ADA violation because the OMA account at the XVIII
Airborne Corps was a target/allowance and an obligation in excess of a
target/allowance can never result in an ADA violation.
4 points
QUESTION 6
1. Assume a contracting officer (KO) at Ft. Bragg, NC awards a contract
on 20 September 2010 for $10 million inadvertently committing an ADA
violation by causing the Army to exceed the amount available in its FY 2010
O&M appropriation. Which of the following is correct:
The KO is subject to administrative discipline because good faith or
mistake of fact does not relieve him from liability under the ADA.
There is no ADA violation if DoD has sufficient funds to cover the
overage.
The KO is not subject to criminal or adverse administrative action
because Ft. Bragg's allotment is an informal subdivision of funds.
The KO will surely go to jail for an ADA violation, serving a mandatory
minimum.
4 points
QUESTION 7
1. The fiscal year for the U.S. Government is a 12-month period from:



This study source was downloaded by 100000829818949 from CourseHero.com on 03-01-2022 04:56:14 GMT -06:00


https://www.coursehero.com/file/44882224/Fiscal-Law-Final-Examdocx/

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
1 maart 2022
Aantal pagina's
9
Geschreven in
2021/2022
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
abram23 Adams State College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
676
Lid sinds
5 jaar
Aantal volgers
546
Documenten
3338
Laatst verkocht
2 dagen geleden
QUALITY WORK OF ALL KIND OF QUIZ or EXAM WITH GUARANTEE OF AN A

Im an expert on major courses especially; psychology,Nursing, Human resource Management & Project writting.Assisting students with quality work is my first priority. I ensure scholarly standards in my documents . I assure a GOOD GRADE if you will use my work.

4.0

142 beoordelingen

5
78
4
26
3
16
2
3
1
19

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen