1) The largest percentage of software life cycle costs is associated with
_________? [26b. Relate the typical distribution of software life cycle costs to the planning of an
acquisition program.]
Upgrades and
Maintenance
Research and
Development
Design and
Development
Test and
Evaluation
2) One cost estimation method can be used in combination with another
method. [28d. Select an appropriate approach (e.g., Analogy, Parametric, Top-Down,
Engineering (Bottom Up, Actual, Delphi) to estimate the cost and schedule for a software-intensive
system.]
True
Fals
e
3) Based on information from the Initial Capabilities Document (ICD), an AoA
includes (Select all that apply): [2a. Given an Initial Capabilities Document (ICD) and a
summary Analysis of Alternatives (AoA), select an appropriate concept, from the perspective of the
system developer, to meet the user's requirements.]
, Test
Requirements
Key attributes as defined by Measures of
Effectiveness
Functional
Areas
Detailed System
Specifications
Range of Military
Operations
4) The majority of a system's life cycle costs can be attributed directly to
_________. [33a. Recognize the impact and interrelationship of life cycle product support and life
cycle cost.]
Operations and Support
Costs
Research and Development (R&D)
Costs
Procurement
Costs
Weapons System
Costs
5) What is a characteristic of a Joint Capabilities Technology Demonstration
(JCTD)? [3c. Determine the applicability of science and technology activities to the acquisition of a
system.]
Demonstrates technology in a field
environment
Requires no user involvement until after successful completion of the
demonstration
Is funded by procurement money set aside specifically for
JCTDs.
Is based on a validated requirement which is documented in a Capability
, Development Document (CDD).
6) __________ consists of all costs associated with developing, procuring and
housing a weapon system. [9a. Given a cost breakdown, determine Development Cost,
Flyaway Cost, Weapons System Cost, Procurement Cost, Acquisition Cost, and Life Cycle Cost.]
Program Acquisition
Cost
Flyaway
Cost
Weapon System
Cost
Life Cycle
Cost
7) What is the procurement cost of this system?
Cost (in millions of
Cost Types
dollars)
Research, Development, Test &
$400
Evaluation
Procurement of Prime Mission
$800
Equipment
Procurement of Support Equipment $100
Procurement of Initial Spares $100
Operations and Support $70,000
Disposal $100
[9a2. Given a cost breakdown, determine Development Cost, Flyaway Cost, Weapons System Cost,
Procurement Cost, and Life Cycle Cost.] [Remediation Accessed :N]
$1,000
million
$800
million
$900
million
$1,400
million
8) The Air Force is in process of completing development on an upgrade to
an existing fighter aircraft that will improve survivability and reliability. The