Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Exam (elaborations) ACQ 202 Module 1/ACQ 202 Module 1 Exam: Consideration of Alternatives, Latest 2022

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
04-03-2022
Written in
2021/2022

ACQ 202 Module 1 Exam: Consideration of Alternatives What element of International Acquisition & Exportability (IA&E) assesses the risks of transferring controlled technology and information that provide U.S. warfighters a combat advantage as well as the benefits of international participation? - -IA&E Planning & Analysis -International Contracting -International Cooperative Programs -Technology Security and Foreign Disclosure -Sales & Transfers -Defense Exportability What is the procurement cost of this system? Cost Types Cost (in millions of dollars) Research, Development, Test & Evaluation $400 Procurement of Prime Mission Equipment $800 Procurement of Support Equipment $100 Procurement of Initial Spares $100 Operations and Support $70,0000 Disposal $100 – -$1,400 million -$800 million -$900 million -$1,000 million The largest amount of cost for a system is related to its operations and support. - -True -False Which of the following are characteristics of International Cooperation Programs (ICPs)? (Select the three that apply.) – -Shared cost -Shared risks and benefits -One way transfers/grants -Foreign aid -Buyer-seller relationship -Government-to-Government Program Management Offices/Integrated Product Teams should conduct their initial International Acquisition & Exportability (IA&E) Assessment during the Production & Deployment phase of traditional, major capability 5000.02 acquisition programs. - -True -False Program-level exportability feasibility studies should be conducted as early as possible in a system's life cycle to assess the international market for potential cooperative programs, foreign sales, or transfers; identify the feasibility of designing and developing defense exportability features (DEF) for the system; and estimate potential return on investment from future international acquisition partnership and sales efforts. - -True -False DoD receives a Foreign Military Sales (FMS) Letter of Request (LOR) from an allied nation for a DoD system that is currently in Low Rate Initial Production. At this point in the acquisition life cycle, what are the possible impacts to the program if an exportable version of the system is available for offer to this prospective FMS customer? (Select the three that apply.) - (WRONG COMBINATION) -Lower research and development costs through Research, Development Test, and Evaluation (RDT&E) cost sharing -Lower production costs for the DoD and the FMS customer due to economic order quantity savings -Reduced DoD and FMS customer Operations & Support (O&S) costs if common product support strategies are used -Enhanced U.S. political-military relationships with foreign nations (WRONG COMBINATION) -Lower research and development costs through Research, Development Test, and Evaluation (RDT&E) cost sharing -Lower production costs for the DoD and the FMS customer due to economic order quantity savings -Reduced DoD and FMS customer Operations & Support (O&S) costs if common product support strategies are used -Enhanced U.S. political-military relationships with foreign nations (wrong COMBINATION) -Lower research and development costs through Research, Development Test, and Evaluation (RDT&E) cost sharing -Lower production costs for the DoD and the FMS customer due to economic order quantity savings -Reduced DoD and FMS customer Operations & Support (O&S) costs if common product support strategies are used -Enhanced U.S. political-military relationships with foreign nations Based on information from the Initial Capabilities Document (ICD), an AoA includes (Select all that apply): - -Test Requirements -Key attributes as defined by Measures of Effectiveness -Range of Military Operations -Functional Areas -Detailed System Specifications The largest percentage of software life cycle costs is associated with _________? - -Design and Development -Upgrades and Maintenance -Research and Development -Test and Evaluation What document is developed for DoD acquisition programs with substantial international involvement, as a companion to the Acquisition Strategy, to ensure effective integration of domestic and international acquisition efforts throughout the program's life cycle? - -Technology Release Roadmap (TRR) -Contract Data Requirements List (CDRLs) -Data Item Descriptions (DIDs) -International Business Plan (IBP) Affordability is most concerned with: - -Making tradeoffs in performance and schedule to achieve cost objectives within affordability constraints. -Use of commercial design practices to save development and production costs. -Making tradeoffs that will provide the best possible system in the least amount of time. -Use of state-of-the-art design and materials to accomplish the mission documented in the Initial Capabilities Document (ICD) and Capability Development Document (CDD). The Air Force is in process of completing development on an upgrade to an existing fighter aircraft that will improve survivability and reliability. The contractor has provided the Government with detailed technical drawings and associated costs of the parts, materials, and labor required to produce the system. What cost estimating technique would the Air Force most likely use to prepare their budget estimate for the upgrade? - -Actual Cost -Analogy -Parametric -Engineering Which of the following requires that U.S. Government tariffs be added to purchases of international products or materials, unless an exception (such as public interest) applies or the foreign sourced items are acquired from a qualifying country with a Reciprocal Procurement Memorandum of Understanding (MOU). - -Competition in Contracting Act (CICA) -Buy American Statute -National Defense Authorization Act (NDAA) -Barry Amendment DoD Component International Program Organizations and Program Management Offices are responsible for approving export license requests made by program contractors and support contractors. - -True -False When comparing alternative concepts to provide needed warfighting capabilities, which of the following must be met? - -Goals -Targets -Thresholds -Objectives The _______________ and the _____________________ along with the Funding Plan should be established early on in the Joint Capabilities Technology Demonstration (JCTD) to ensure that preparations are developed to facilitate movement of the JCTD into the acquisition process. Please choose from below to fill in the blanks. - -Program Management Office and an Acquisition Strategy -Management Plan and Transition Plan -Technical Support IPT and a Technical Integration Plan -Contracting Officer and an Acquisition Plan A software costing method that uses a team of experts working both independently and together to combine different approaches and arrive at a collective judgment through consensus is an example of the _________ costing method. - -Delphi -Bottom-up -Parametric -Top-Down Which of the following International Acquisition & Exportability (IA&E) activities addressed in the "International Considerations" section of the Acquisition Strategy could influence the program's overall acquisition strategy? (Select the three that apply.) – -Potential export version(s) cost, schedule and performance characteristics -Potential changes in international lending policies and practices -Defense exportability feasibility study results -Participation of international companies as potential subcontractors or suppliers in domestic and international acquisition efforts -Balance of payments issues with foreign nations _______ refers to the cost of procuring prime mission equipment. - -Life Cycle Cost -Flyaway Cost -Development Cost -Weapon System Cost In certain situations, there may be a U.S. Government requirement to restrict specific portions of a weapon system sale to "Foreign Military Sales (FMS)-only" while permitting other portions to be acquired through Direct Commercial Sales (DCS). - -True -False The majority of a system's life cycle costs can be attributed directly to ______. - -operations and support costs -weapons system costs -procurement costs -research and development costs what steps must be taken to obtain technology security and foreign disclosure (TSFD) authorizations? (select three that apply) - INCORRECT COMBINATION -identify the system's critical technology areas -implement guidance into defense exportability integration plan -approve export license requests -engage with TSFD pipe owners -submit international cooperative program (ICP) of foreign military sales (FMS) congressional notifications required by the Arms Export Control Act. UNSURE COMBINATION -identify the system's critical technology areas -implement guidance into defense exportability integration plan -approve export license requests -engage with TSFD pipe owners -submit international cooperative program (ICP) of foreign military sales (FMS) congressional notifications required by the Arms Export Control Act. both army and marine corps have a capability need to procure additional helicopters beyond the number specified in the current contract; the helicopter program is currently in production. what cost estimating technique would the services most likely use as a basis for requesting the funding to par for the additional aircraft? - -engineering -actual cost -parametric -analogy an international agreement is established between the us and a partner nation to develop a new defense capability. what are the benefits that typically result from establishing a successful international cooperative program (ICP)? select three that apply – -lower research and development costs through research, development test, and evaluation (RDT&E) cost sharing -enhanced us political-military relationships with foreign nations -extend dod service life through sustainment cooperation for systems transitioning into non-program of record -sell/transfer dod inventory of spare parts that are no longer needed to allied/friendly nations -enhanced capability and interoperability based on access to foreign partner technology and industrial capabilities the best time to reduce life cycle cost is ____ in the life cycle process. _____ can be applied throughout the life cycle to achieve an affordable and effective system. which combination below provides the CORRECT response for the blanks above? - -when the budget is submitted / the spending plan -late / CAIV -early / affordability and should cost -mid way / tradeoffs in which of the following areas do contracting officers support program managers/integrated product teams on both domestic and international acquisitions programs? (select two) – -evaluating proposed technology security and foreign disclosure (TSFD) guidance alternatives -including international acquisition-specific documentation requirements in the contract data requirements list (CDRLs) -developing program protection measures for restricted technology and information -communicating requirements in the request for proposal (RFP) the largest distribution of software cost will be _____ in the program's life cycle. - -late -early When comparing two alternative concepts, you discover that both will provide the needed capabilities. Alternative 1 requires new development that will take 7 years and will cost more than the other alternative. alternative 2 can be developed in 4 years relying on proven joint capabilities technology demonstration technology. based on the information provided here, which is a better alternative? - -alternative 1 -alternative 2 what is a characteristic of a joint capabilities technology demonstration (JCTD)? - -is based on a validated requirement which is documented in a capability development document (CDD) -requires no user involvement until after successful completion of the demonstration. -demonstrates technology in a field environment -is funded by procurement money set aside specifically for JCTDs which of the following guidance documents requires dod components to incorporate interoperability and defense exportability aspects into joint capabilities integration and development system (JCIDS) requirements documents to ensure they are addressed in initial planning and design? - -national defense authorization act (NDAA) 2019 -defense acquisition guidebook (DAG) chapter 9, program protection -joint requirements oversight council memorandum (JRCOM) -defense federal acquisition regulations supplement (DFARS) during a program's initial design and development efforts, program managers and integrated product team members should allocate sufficient time, talent, and study funding to assess the potential impact of international acquisition & exportability (IA&E) considerations- both positive and negative- on the program's overall acquisition strategy. - -true -false when comparing two alternative concepts to provide needed warfighting capabilities, you discover that the total life cycle costs of both are projected to be nearly the same. Alternative 1 relies on technology that has been successfully demonstrated during advanced technology demonstrations and can be fielded in 5 years. alternative 2 relies on technology that is in the basic research stage and can be fielded in 8 years. based on the information provided here, which is the better alternative? - -alternative 1 -alternative 2 For foreign military sales (FMS) non-program of record acquisition programs, the fms customer nation is responsible for developing, awarding, and executing the contract in accordance with their own contracting policies and procedures. - -true -false during which part of the international acquisition & exportability (IA&E) assessment does the program management office and integrated product team identify the technology security and foreign disclosure (TSFD) technology areas ("pipes") that are relevant to the program's future international acquisition activities? – -program protection considerations -international markets -cooperative opportunities -interoperability requirements the _____ compares alternatives by estimating their ability to satisfy the identified capability need through an effectiveness analysis and by estimating their life cycle costs through cost analysis - -analysis of alternatives -cost analysis requirements description -capability development document -acquisition decision memorandum a software-costing method that bases cost estimates upon statistical data such as source lines of code is an examples of a _______ costing model - -bottom-up -parametric -delphi -top-down which of the following international acquisition & exportability (IA&E) areas described in the international considerations section of a program's acquisition strategy could have significant long-term impact on overall program affordability? select three - - un delib -establishing a domestic -pending decisions -international partner -coordination with partner an analysis of alternatives is a study of the ______ - -cost analysis for the alternatives -potential acquisition strategies for the alternatives -potential technical solutions -operational effectiveness and life cycle cost of the alternatives What is the weapon systems cost of this system? Cost Types Cost (in millions of dollars) Research, Development, Test & Evaluation $400 Procurement of Prime Mission Equipment $800 Procurement of Support Equipment $100 Procurement of Initial Spares $100 Operations and Support $70,0000 Disposal $100 - 900 million to obtain guidance and (if required) approvals on the level and type of protection required (eg additional program protection measures, removal of critical program technology... – -technology security and foreign disclosure (TSFD) technology area ("pipe") owners/authorities -under secretary of defense for acquisition & sustainment - - affordability and should cost means _________. – performance and schedule tradeoffs will be made to achieve cost objectives estimating potential demand for a capability and developing a rough order of magnitude (ROM) estimate of future sales are characteristics of which international acquisitions & exportability - international markets the international involvement section of the acquisition must include a list of the system's critical program information (CPI) and a detailed description of anti-tamper - -true -false _______ consists of all costs associated with developing, procuring and housing a weapon system. - -flyaway cost -life cycle cost -weapon system cost -program acquisition cost one cost estimation method can be used in combination with another method. - -true -false

Show more Read less
Institution
Course

Content preview

ACQ 202 Mod 1

What element of International Acquisition & Exportability (IA&E) assesses the risks of transferring controlled
technology and information that provide U.S. warfighters a combat advantage as well as the benefits of
international participation?
-IA&E Planning & Analysis incorrect
-International Contracting
-International Cooperative Programs incorrect
-Technology Security and Foreign Disclosure incorrect
-Sales & Transfers
-Defense Exportability incorrect
What is the procurement cost of this system?
Cost Types Cost (in millions of dollars)
Research, Development, Test & Evaluation $400
Procurement of Prime Mission Equipment $800
Procurement of Support Equipment $100
Procurement of Initial Spares $100
Operations and Support $70,0000
Disposal $100
-$1,400 million
-$800 million
-$900 million
-$1,000 million
The largest amount of cost for a system is related to its operations and support.
-True
-False

Which of the following are characteristics of International Cooperation Programs (ICPs)? (Select the three that
apply.)
-Shared cost
-Shared risks and benefits
-One way transfers/grants
-Foreign aid
-Buyer-seller relationship
-Government-to-Government

Program Management Offices/Integrated Product Teams should conduct their initial International Acquisition
& Exportability (IA&E) Assessment during the Production & Deployment phase of traditional, major capability
5000.02 acquisition programs.
-True
-False


This study source was downloaded by 100000829216747 from CourseHero.com on 03-04-2022 06:08:43 GMT -06:00


https://www.coursehero.com/file/79751674/ACQ-202-Mod-1pdf/

, Program-level exportability feasibility studies should be conducted as early as possible in a system's life cycle
to assess the international market for potential cooperative programs, foreign sales, or transfers; identify the
feasibility of designing and developing defense exportability features (DEF) for the system; and estimate
potential return on investment from future international acquisition partnership and sales efforts.
-True
-False
DoD receives a Foreign Military Sales (FMS) Letter of Request (LOR) from an allied nation for a DoD system
that is currently in Low Rate Initial Production. At this point in the acquisition life cycle, what are the possible
impacts to the program if an exportable version of the system is available for offer to this prospective FMS
customer? (Select the three that apply.)
(WRONG COMBINATION)
-Lower research and development costs through Research, Development Test, and Evaluation (RDT&E) cost
sharing
-Lower production costs for the DoD and the FMS customer due to economic order quantity savings
-Reduced DoD and FMS customer Operations & Support (O&S) costs if common product support strategies
are used
-Enhanced U.S. political-military relationships with foreign nations
(WRONG COMBINATION)
-Lower research and development costs through Research, Development Test, and Evaluation (RDT&E) cost
sharing
-Lower production costs for the DoD and the FMS customer due to economic order quantity savings
-Reduced DoD and FMS customer Operations & Support (O&S) costs if common product support strategies
are used
-Enhanced U.S. political-military relationships with foreign nations
(wrong COMBINATION)
-Lower research and development costs through Research, Development Test, and Evaluation (RDT&E) cost
sharing
-Lower production costs for the DoD and the FMS customer due to economic order quantity savings
-Reduced DoD and FMS customer Operations & Support (O&S) costs if common product support strategies
are used
-Enhanced U.S. political-military relationships with foreign nations
Based on information from the Initial Capabilities Document (ICD), an AoA includes (Select all that apply):
-Test Requirements
-Key attributes as defined by Measures of Effectiveness
-Range of Military Operations
-Functional Areas
-Detailed System Specifications

The largest percentage of software life cycle costs is associated with _________?
-Design and Development
-Upgrades and Maintenance
-Research and Development
-Test and Evaluation
This study source was downloaded by 100000829216747 from CourseHero.com on 03-04-2022 06:08:43 GMT -06:00


https://www.coursehero.com/file/79751674/ACQ-202-Mod-1pdf/

Written for

Course

Document information

Uploaded on
March 4, 2022
Number of pages
8
Written in
2021/2022
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Rubricguru Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
1084
Member since
6 year
Number of followers
1042
Documents
3652
Last sold
6 months ago
Rubric Guru

Nursing Being my main profession line, I have essential guides that are A graded, I am a very friendly person so don't hesitate to ask me for any assistant required to be well prepared. Thank you

3.5

138 reviews

5
57
4
27
3
14
2
9
1
31

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions