Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Fiscal Law Final Exam, Questions And Answers. Latest 2022

Beoordeling
-
Verkocht
1
Pagina's
10
Cijfer
A+
Geüpload op
11-03-2022
Geschreven in
2022/2023

Fiscal Law Final Exam, Questions And Answers. Latest 2022. QUE S T ION 1 1. It is appropriate for the Army to acquire lawn cutting services through the Project Order Statute. True False QUE S T ION 2 1. The proper amount of money to obligate at the award of a firm fixed- price contract is: The full amount of the contract. Nothing until the contractor performs the required work. Half of the total liability. A conservative amount based on the government’s estimated future requirements. QUE S T ION 3 1. How long does the Department of Defense Financial Management Regulation give an individual discovering a possible Antideficiency Act violation to report it to his/her chain of command and the Financial Management Comptroller? 5 working days. 2 weeks. 90 calendar days. 45 days. QUE S T ION 4 1. On 1 September 2011 the command at New Sands Missile Range purchases an x-ray machine for the installation hospital, which arrives and is accepted on 15 September 2011. The x-ray machine is not needed until August of 2012, when an increased number of Soldiers arrive due to BRAC. Assuming there is no applicable delivery or production lead time exception (as this is a commercial item and readily available off the shelf), has an ADA violation been committed and is it correctable? No ADA violation has been committed. As the bona fide need is in 2012, an ADA violation has been committed but it is correctable. As the bona fide need is in 2012, an ADA violation has been committed, and is not correctable since proper funds, FY 2012 O&M (or procurement, depending on the value) were not available at the time of obligation. Although the bona fide need is in 2012, there is no ADA violation because the command was engaged in advanced planning, and was smartly purchasing an item ahead of the expected need and perhaps even getting a better price. QUE S T ION 5 1. On 30 September 2010, $275,000 remains in the Operations and Maintenance, Army (OMA) allowance at the XVIII Airborne Corps. On that day, the contracting officer is about to award a supply contract, obligating $300,000 OMA. Award of the supply contract: Will cause an Antideficiency Act (ADA) violation because the contract price exceeds the amount of OMA available at the XVIII Airborne Corps. Will cause an ADA violation unless the contracting officer shows that she neither knew nor should have known that the XVIII Airborne Corps had only $275,000 in the OMA account. Will cause an ADA violation if the XVIII Airborne Corps’s major command, FORSCOM, lacks sufficient OMA funds in its formal subdivision to cover the overobligation. Will not cause an ADA violation if Congress enacts either a Continuing Resolution Authority (CRA) or a permanent appropriation before the vendor seeks payment for the supplies. Will not cause an ADA violation because the OMA account at the XVIII Airborne Corps was a target/allowance and an obligation in excess of a target/allowance can never result in an ADA violation.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

Fiscal Law Final Exam

QUE S T ION 1
1. It is appropriate for the Army to acquire lawn cutting services
through the Project Order Statute.

True

False
4 points
QUE S T ION 2
1. The proper amount of money to obligate at the award of a firm fixed-
price contract is:
The full amount of the contract.
Nothing until the contractor performs the required work.
Half of the total liability.
A conservative amount based on the government’s estimated
future requirements.
4 points
QUE S T ION 3
1. How long does the Department of Defense Financial Management
Regulation give an individual discovering a possible Antideficiency Act
violation to report it to his/her chain of command and the Financial
Management Comptroller?
5 working
days.
2 weeks.
90 calendar
days.
45 days.
4 points
QUE S T ION 4
1. On 1 September 2011 the command at New Sands Missile Range
purchases an x-ray machine for the installation hospital, which arrives and is
accepted on 15 September 2011. The x-ray machine is not needed until
August of 2012, when an increased number of Soldiers arrive due to BRAC.
Assuming there is no applicable delivery or production lead time exception
(as this is a commercial item and readily available off the shelf), has an ADA
violation been committed and is it correctable?
No ADA violation has been committed.
As the bona fide need is in 2012, an ADA violation has been committed
but it is correctable.
As the bona fide need is in 2012, an ADA violation has been committed,
and is not correctable since proper funds, FY 2012 O&M (or
procurement,

,

Geschreven voor

Vak

Documentinformatie

Geüpload op
11 maart 2022
Aantal pagina's
10
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
StudyConnect Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
266
Lid sinds
5 jaar
Aantal volgers
232
Documenten
1719
Laatst verkocht
1 maand geleden
Study Connect

Latest Exams, Notes, Practice Tests And All Latest Study Materials to help You Pass your Exams

3.5

40 beoordelingen

5
15
4
7
3
9
2
0
1
9

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen