1) Your new-start program was approved in this year's Authorization Bill and you are
currently operating under Continuing Resolution Authority. To avoid losing a top
engineer from your program, you authorize the Contractor to begin work since you
expect the Appropriation Bill to be signed next week. You are now in conflict with
the __________. [12b. Select the appropriate public law (i.e., Misappropriation Act, Anti-
Deficiency Act, Bona Fide Need) that applies to the use of appropriated funds under specific
circumstances.]
Anti-Deficiency
Act
Misappropriation
Act
Reprogramming
Thresholds
Defense Authorization
Bill
2) The Navy can transfer $11 million Research, Development, Test, and Evaluation
(RDT&E) funds from one program element to another without prior approval of
Congress. [12d. Given a funding shortfall, apply the rules governing reprogramming of
appropriated funds in each appropriation category to resolve the problem.]
True
Fals
e
3) The _______ defines design requirements and is primarily documented by the Item
Performance Specifications. [23a. Relate the different types of program unique specifications to
their appropriate configuration baselines and technical review requirements.]
Allocated
This study source was downloaded by 100000841990434 from CourseHero.com on 03-22-2022 16:08:16 GMT -05:00
https://www.coursehero.com/file/32413315/ACQ-202-Module-4-Exam-Part-1/
, Baseline
Product
Baseline
Maintenance
Baseline
Functional
Baseline
4) The approved detail design resulting from the __________ serves as a basis for
making the decision to begin production. [24e. Identify the purpose of specific technical
reviews and their relationship to the acquisition process.]
Critical Design
Review
Preliminary Design
Review
Systems Requirement
Review
Test Readiness
Review
5) The management of internal interface design would usually be the responsibility of
the _____________? [25a. Identify the roles, responsibilities, and methods for interface control and
technical data management.]
Contract
or
Government Program
Manager
Joint Interoperability Test
Command
Independent Test and Evaluation
Agency
6) Which of the following configuration baselines is used to define the overall system
level capabilities of a system? [25c. Identify the relationship between configuration baselines,
specifications, and configuration management planning.] [Remediation Accessed :N]
Functional
Baseline