Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Information Technology Project Management 8th Edition Kathy Schwalbe Test Bank_ Complete Chapters 1-13.

Beoordeling
-
Verkocht
-
Pagina's
224
Cijfer
A+
Geüpload op
31-03-2022
Geschreven in
2021/2022

Information Technology Project Management 8th Edition Kathy Schwalbe Test Bank_ Complete Chapters 1-13.

Instelling
Vak

Voorbeeld van de inhoud

,Chapter 1

1. Until the 1980s, project management primarily focused on providing schedule and resource data to top
management in the military, computer, and construction industries.
TRUE


2. A research report showed that the U.S. spends $2.3 trillion on projects every year, an amount equal to 40
percent of the nation’s gross domestic product.
FALSE

3. One attribute that helps define a project is that a project has a unique purpose.
TRUE

4. A project should be developed using progressive elaboration, starting from specific details and broadening in
scope as it progresses.
FALSE

5. Projects are often defined narrowly when they begin.
FALSE

6. Projects rarely involve uncertainty.
FALSE

7. Every project is constrained in different ways by its scope and cost goals; these limitations are sometimes
referred to in project management as the double constraint.
FALSE

8. Questions about how long a project’s schedule should be are related to the issue of the project’s scope.
FALSE

9. Because projects involve uncertainty and limited resources, projects rarely finish according to discrete scope,
time, and cost goals as originally planned.
TRUE

10. Managing the triple constraint involves making trade-offs between scope, time, and cost goals for a project.
TRUE

11. Some people refer to the “double constraint” of project management to include quality and customer
satisfaction.
FALSE

,12. In the example of building a new house, the support staff would provide the wood, windows, flooring
materials, appliances, and so on.
FALSE

13. Stakeholders’ needs and expectations are only important in the beginning of a project.
FALSE

14. There are six core knowledge areas of project management.
FALSE

15. Follow-up studies done by the Standish Group showed that the number of failed projects has more than
doubled in the past decade.
FALSE

16. The 2006 Standish Group survey showed that IT project success rates had risen from 16 percent in 1994 to
35 percent in 2006.
TRUE

17. Project management is the silver bullet that guarantees success on all projects.
FALSE

18. A key finding of a 2004 study is that relationship management is viewed as a top success factor for
information systems in China, while it is not mentioned in U.S. studies.
TRUE

19. Winners in project delivery know that strong program managers—referred to as project leaders—are crucial
to project success.
TRUE

20. A program is “a group of related projects managed in a coordinated way to obtain benefits and control not
available from managing them individually.”
TRUE

21. Program managers are not responsible for coordinating the efforts of project teams, functional groups,
suppliers, and operations staff.
FALSE

22. The job description for a project manager can vary by industry and by organization.
TRUE

23. Project managers should possess general management knowledge and skills.
TRUE

24. Project managers must be able to make effective use of technology as it relates to the specific project.
TRUE

, 25. Project managers for large information technology projects have to be experts in the field of information
technology.
FALSE

26. Project managers often take on the role of both leader and manager.
TRUE

27. Today’s project managers still draw Gantt charts by hand.
FALSE

28. Determining the relationships among tasks is not essential in helping to improve project scheduling.
FALSE

29. New software makes basic tools, such as Gantt charts and network diagrams, inexpensive, easy to create,
and available for anyone to update.
TRUE

30. Many people still use basic productivity software, such as Microsoft Word or Excel, to perform many
project management functions.
TRUE

31. A research report showed that the U.S. spends ____ on projects every year.
A. $2.3 billion
B. $23 billion
C. $2.3 trillion
D. $23 trillion

32. A research report showed that the U.S. spends the equivalent of ____ percent of the nation’s gross domestic
product on projects every year.
A. 10
B. 20
C. 25
D. 50

33. Many organizations assert that using project management provides advantages, such as ____.
A. lower profit margins
B. lower costs
C. less internal coordination
D. lower worker morale

34. Because a project requires resources, often from various areas, many projects cross ____ or other
boundaries to achieve their unique purposes.
A. financial
B. spatial
C. departmental
D. technological

Geschreven voor

Vak

Documentinformatie

Geüpload op
31 maart 2022
Aantal pagina's
224
Geschreven in
2021/2022
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Malicine Alliant International University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
545
Lid sinds
4 jaar
Aantal volgers
507
Documenten
1581
Laatst verkocht
4 weken geleden

3.3

72 beoordelingen

5
26
4
11
3
12
2
7
1
16

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen