Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

DAU ISA 101 Module 11 Test

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
04-04-2022
Written in
2022/2023

DAU ISA 101 Module 11 Test Measurement: Application Exam Here is your test result.The dots represent the choices you have made. The highlighted questions are the questions you have missed. Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status page contains 5 Questions 1) Which of the following is a FALSE statement about the interpretation of software measurements? [19.101.3.1 Recognize the impacts to the software development plan (e.g., trends) when interpreting software measures.] Measurements typically give exact answers without the need for any further analysis. The Software Schedule measurement is one example of a leading software indicator; as such it can be used to help predict a potential future problem. Multiple software measures are generally better than relying on a single measure. Several different interpretations of a given measurement are frequently possible, so further probing of the situation is required to get to the core issue. 2) When a software measure reveals a wide gap between planned results and actual accomplishments and this is discovered late in the project schedule, why does adding more programming and staffing resources usually result in diminished return? [19.101.3.2 Describe potential software acquisition problems after viewing a program's metric data.] It disrupts existing progress and on-going personnel collaboration. It requires time to acquire additional space, hardware, and software. It makes negatively affects morale and makes present personnel feel unproductive. The new employees usually cost more than their counterparts. 3) The role of Technical Performance Measurement (TPM) is to: [19.101.3.3 Recognize characteristics of Technical Performance Measurement and software measurement.] Gain insights into critical systems-level technical issues. Evaluate Major Automated Information Systems (MAIS) for code complexity. Analyze the technical performance maturity of a software developer as measured across several projects. Test, evaluate, and measure the performance of a completed system. 4) Which of the following is TRUE about the role of enterprise-level measurement regarding Information Technology (IT) investments? [19.101.3.4 Recall characteristics of enterprise-level measurement.] Enterprise level measures help to determine the nature and value of the system to be built, as well as whether the system should be built at all. IT enterprise-level measurements include, as a core element, highly technical software design and quality coding indicators. Enterprise-level performance measures are useful for measuring quality, but provide very little help in identifying cost or budget issues. Among its provisions, the Title 40, Subtitle III, Clinger-Cohen Act removes previous legal requirements for Federal agencies to focus on the results they are achieving through their IT investments. 5) The requires agencies to define cost, schedule and performance goals for acquisition programs and to monitor goals to ensure they remain within prescribed tolerances. (Fill in the blank.) [19.101.3.5 Recall key laws mandating enterprise-level measurement.] Federal Acquisition Streamlining Act (FASA) Defense Acquisition Guidebook (DAG) Government Performance and Results Act (GPRA) Brooks' Law (BL)

Show more Read less
Institution
Course

Content preview

DAU Page 1 of 2




DAU ISA 101 Module 11 Test


Measurement: Application Exam
Here is your test result.The dots represent the choices you have
made. The highlighted questions are the questions you have
missed.
Remediation Accessed shows whether you accessed those links.'N' represents links not
visited and 'Y' represents visited links.
Back to Status page
contains 5 Questions


1) Which of the following is a FALSE statement about the interpretation of software
measurements? [19.101.3.1 Recognize the impacts to the software development plan (e.g., trends)
when interpreting software measures.]


Measurements typically give exact answers without the need for any further analysis.

The Software Schedule measurement is one example of a leading software indicator; as
such it can be used to help predict a potential future problem.

Multiple software measures are generally better than relying on a single measure.

Several different interpretations of a given measurement are frequently possible, so further
probing of the situation is required to get to the core issue.


2) When a software measure reveals a wide gap between planned results and actual
accomplishments and this is discovered late in the project schedule, why does adding more
programming and staffing resources usually result in diminished return? [19.101.3.2 Describe
potential software acquisition problems after viewing a program's metric data.]

It disrupts existing progress and on-going personnel collaboration.

It requires time to acquire additional space, hardware, and software.

It makes negatively affects morale and makes present personnel feel unproductive.
The new employees usually cost more than their counterparts.

3) The role of Technical Performance Measurement (TPM) is to: [19.101.3.3 Recognize
characteristics of Technical Performance Measurement and software measurement.]

Gain insights into critical systems-level technical issues.

Evaluate Major Automated Information Systems (MAIS) for code complexity.

Analyze the technical performance maturity of a software developer as measured across
several projects.

Test, evaluate, and measure the performance of a completed system.

DAU

Written for

Course

Document information

Uploaded on
April 4, 2022
Number of pages
3
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BestSolutions Chamberlain College Nursing
Follow You need to be logged in order to follow users or courses
Sold
173
Member since
4 year
Number of followers
135
Documents
3003
Last sold
7 months ago

4.8

53 reviews

5
48
4
2
3
2
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions