DAU ISA 101 Module 11 Test
Measurement: Application Exam
Here is your test result.The dots represent the choices you have
made. The highlighted questions are the questions you have
missed.
Remediation Accessed shows whether you accessed those links.'N' represents links not
visited and 'Y' represents visited links.
Back to Status page
contains 5 Questions
1) Which of the following is a FALSE statement about the interpretation of software
measurements? [19.101.3.1 Recognize the impacts to the software development plan (e.g., trends)
when interpreting software measures.]
Measurements typically give exact answers without the need for any further analysis.
The Software Schedule measurement is one example of a leading software indicator; as
such it can be used to help predict a potential future problem.
Multiple software measures are generally better than relying on a single measure.
Several different interpretations of a given measurement are frequently possible, so further
probing of the situation is required to get to the core issue.
2) When a software measure reveals a wide gap between planned results and actual
accomplishments and this is discovered late in the project schedule, why does adding more
programming and staffing resources usually result in diminished return? [19.101.3.2 Describe
potential software acquisition problems after viewing a program's metric data.]
It disrupts existing progress and on-going personnel collaboration.
It requires time to acquire additional space, hardware, and software.
It makes negatively affects morale and makes present personnel feel unproductive.
The new employees usually cost more than their counterparts.
3) The role of Technical Performance Measurement (TPM) is to: [19.101.3.3 Recognize
characteristics of Technical Performance Measurement and software measurement.]
Gain insights into critical systems-level technical issues.
Evaluate Major Automated Information Systems (MAIS) for code complexity.
Analyze the technical performance maturity of a software developer as measured across
several projects.
Test, evaluate, and measure the performance of a completed system.
DAU