DAU ISA 101 Module 14 Test 1
Software Development: Requirements and Design
Exam
Here is your test result.The dots represent the choices you have
made. The highlighted questions are the questions you have
missed.
Remediation Accessed shows whether you accessed those links.'N' represents links not
visited and 'Y' represents visited links.
Back to Status page
contains 12 Questions
1) Which of the following IS NOT one of the Systems Engineering Technical Processes used for
system design or product realization? [27.101.2.1 Identify the eight (8) steps of the Systems
Engineering technical processes.]
Interface Management Process
Design Solution Process
Requirements Development
Process Verification Process
Transition Process
2) Each of the following is a Systems Engineering Technical Management Process EXCEPT:
[27.101.2.2 Identify the eight (8) Systems Engineering technical management processes.]
Requirements Development
Process Configuration Management
Process Interface Management
Process Technical Planning
Process
3) Which of the following describes the purpose of the Systems Engineering technical process
of Verification? [27.101.2.3 Describe the purpose of each Systems Engineering technical process.]
To confirm that a system element meets its design-to or build-to specifications.
To move the system element to the next stage of development, or for the end-item system, to
the user.
DAU
, DAU Page 2 of 3
To confirm that a system element meets its Stakeholder Requirements.
To improve understanding of the defined requirements and the relationships among the
requirements.
4) Which of the following Systems Engineering technical management processes purpose is
described as the "Provides traceability ultimately back to user-defined capabilities and
needs?" [27.101.2.4 Describe the purpose of each Systems Engineering technical management process.]
DAU