Running Head: GETTA BYTE SOFTWARE PROJECT PART 1




Alyssa Miller

DeVry University

Professor Silas – MGMT 404

October 21, 2020

Getta Byte Software Project

,Getta Byte Software Project


Table of Contents
1. Introduction..............................................................................................................................3

1.1 Project goals and objectives..............................................................................................3

1.2 Management of the project...............................................................................................4

1.3 Internal and external factors that may affect processes and procedure of the project......4

2 Stakeholder Engagement Plan...............................................................................................10

3 Communication management plan........................................................................................11

4 Project Scope Statement........................................................................................................13

5 WBS and the Project Schedule……………………………………………………………...…16

5.1 WBS................................................................................................................................16

5.2 Project scheduling...........................................................................................................18

6 Resource Allocations and Budget Reports…………………………………………… ... 22

6.1 Budget Reports………………………………………………………………………..

7 Risk Register……………………………………………………………………………

8 Conclusion…………………………………………………………………………….

10 References……………………………………………………………………………..

,Getta Byte Software Project


1. Introduction
1.1 Project goals and objectives

The Getta Byte Software gave great insight on a god project charter. Due to their current

manual system having a few challenges such as inaccuracies in their data entries as well as being

time consuming. Inaccurate data can put the company at great risk and therefore, this current

manual system must be replaced. Getta Byte Software Project main mission and goal is to

replace their current manual billing system with an online software system that will enable a

more accurate, easy, and fast data entry system. This upgrade in online software will enhance

their data entry, conceive a dynamic update towards their receivables as well as having a

potential savings of 25% of their total labor costs per month.

As the project manager, along with the CFO, CEO, finance department, the billing

department, and customer care services will work together to ensure the project is a success. The

success of the project shall be attributed to the fact that the billing cycles are reduced to more

than 30% each month, as well as having dynamic report generation and speed up transactions

and response times.

As per the project schedule, it is expected that the development and testing of the software

be done by August 15 and the first pilot done by September 1.This gives the team plenty of time

to work out any mishaps and ensure the system is working accurately and within the expectations

and goals of the project. The final release of the software is to be done by September 10th. The

project total budget is $ 250, 000.

, Getta Byte Software Project


1.2 Management of the project

The project manager will be liable in carrying out the entire project. The project manager

shall then appoint their team such as the human resource manager, the software engineer, the

project coordinator and assigns objective tasks within the project. Each team member will be

responsible in their area of operation and to ensure their task is completely efficiently and

accurately in accordance with the project objectives. The project manager role shall be to oversee

the entire process and therefore identifying the key stakeholders- such as the CEP, CFO, Finance,

Billing and Customer Service is important within the project. Ensuring that there is great

communication between the team will help establish a clear direction for the project and stable

leadership roles from the project manager. Having a clear direction can ensure that the team is

aware of the objections and goals of the project and everyone can give their best effort in

completing a successful project.

1.3 Internal and external factors that may affect processes and procedure of the project

As the project progresses and develops it is important to identify the potential internal and

external factors that may pose risks and challenges to the project. These risks or challenges can

make decisions within the project more difficult to carry out procedures and tasks. One of the

risks that have been identified as an external factor is the potential of a network issue when

transferring data into the new system. Since the new software is online based it is important to

note that the network must be up and running to have a smooth-running project. The potential of

a network problem would absolutely affect the rate at which data is transferred and the

replacement process.

Another factor that needs to be considered is security to the network. Since the software is

online the risk of online hacking increases. This is an external factor that need to be put into

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
20 april 2022
Aantal pagina's
34
Geschreven in
2020/2021
Type
SAMENVATTING

Onderwerpen

$10.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Examiner651 Freelance
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
20
Lid sinds
4 jaar
Aantal volgers
5
Documenten
3737
Laatst verkocht
2 maanden geleden

5.0

2 beoordelingen

5
2
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen