Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CSE 360 Exams 2021/2022 with complete solution

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
21-04-2022
Written in
2021/2022

Which is not true? The software crisis identified that software is delivered over-budget late incrementally with too many remaining errors Correct answer- incrementally In Scrum, who is responsible for removing any impediments that are obstructing the team from achieving its sprint goal? Scrum Master Customer Product owner Team members Correct answer- Scrum Master Software deteriorates rather than wears out because Correct answer- multiple change requests introduce errors in component interaction A stakeholder is Correct answer- Anyone who has a vested interest in the success of the project Which is not one of the questions answered by each team member at a daily Scrum meeting? What did you do since the last meeting? What obstacles are you encountering? What is the cause of the problems you are encountering? What do you plan to accomplish by the next team meeting? Correct answer- What is the cause of the problems you are encountering? The critical path Correct answer- determines the total calendar time required to complete a project Which of the following is not a configuration management activity? change management performance assessment version management system building Correct answer- performance assessment In version control, which of the following is a sequence of versions of source code? Correct answer- codeline True or false: The Software Engineering Code of Ethics takes that a professional software engineering should be committed to lifelong learning Correct answer- True Which of the following type of version control system creates a clone of the project repository? agile file controlled centralized distributed Correct answer- distributed In configuration management storage management, keeping a difference between one version and other than making a complete copy is called a difference copy a source translation a delta a clone Correct answer- delta Which of the following is not a common trait in software processes? design and implementation evolution specifications incremental development validation Correct answer- incremental development Which is the best type of project to apply a waterfall method? requirements are not well defined and will not change the customer cannot clearly define the requirements a great deal of risk is involved many rapid releases are needed Correct answer- requirements are well-defined and will not change The prototyping of a software is Correct answer- a useful approach when a customer cannot clearly define requirements clearly How do agile processes accommodate change to requirements? incremental releases refactoring test driven development pair programming Correct answer- incremental releases The formal proclamation defining the key values of agile development is the Correct answer- Manifesto for Agile Software In Scrum, the sprint backlog is Correct answer- taken from the product backlog The common template for a user story "As a A, I want to be B so C. What is A? a developer a type of user a customer none of the above Correct answer- a type of user As defined in this class, a use case scenario is a high level design a list of requirements the same thing as a user story a textual description of actions and conditions Correct answer- a textual description of actions and conditions Which question no longer concerns the modern software engineer? Correct answer- Why does computer hardware cost so much? Which of the following is a continuous process of improvement? restructuring refactoring re-engineering rewriting Correct answer- refactoring True or false: The waterfall model of software development is no longer an appropriate approach in today's development. Correct answer- false Which is not true about Gantt Charts? project tasks are listed in the left hand column horizontal bars indicate the duration of each task task dependency cannot be shown task concurrency can be clearly shown Correct answer- task dependency cannot be shown Which of the following is not an activity of project management? people management technology evaluation project planning risk management Correct answer- people management Which of the following is lowest on the hierarchy of needs? esteem needs self-realization needs physiological needs social needs Correct answer- physiological needs Which of the following is not usually part of a project plan? monitoring mechanisms hardware requirements high-level design work breakdown structure Correct answer- high-level design In agile-planning, which is the functionality of the different increments decided? Correct answer- during development Which of the following is not an important factor when managing people? honesty competition consistency respect Correct answer- competition Which personality type is motivated by he presence and actions of co-workers? self-oriented reward-oriented task-oriented interaction-oriented Correct answer- interaction oriented True or false: non-functional requirements are only created by the customer/user Correct answer- false Which of the following is NOT a non-functional requirement? ease of use robustness correctness portability Correct answer- correctness Which of the following is not a generic activity common to all requirements engineering processes? Elicitation Analysis Validation Prototyping Correct answer- Prototyping Which is true about using a natural language for representing requirements? The semantics of a natural language can cause confusion Functional and non-functional requirements are always clearly separated Multiple requirements are never grouped together They are the easiest to understand Correct answer- The semantics of a natural language can cause confusion. What is not included in the validation of requirements? Checking for validity Checking for ease of code Checking for completeness Checking for verifiability Correct answer- Checking for ease of code What should not be included in a use case scenario? precondition normal flow of events high level design abnormal flow of events Correct answer- high level design UML stands for Correct answer- unified modeling language What modeling perspective is when you model the context or environment of the system? External perspective Interaction perspective Structural perspective Behavioral perspective Correct answer- External perspective Which UML diagram shows the interactions between a system and its environment? activity diagrams state diagrams use case diagrams class diagrams Correct answer- use case diagrams

Show more Read less
Institution
Course

Content preview

CSE 360 Exams

Which is not true? The software crisis identified that software is delivered
over-budget
late
incrementally
with too many remaining errors
Correct answer- incrementally

In Scrum, who is responsible for removing any impediments that are obstructing the
team from achieving its sprint goal?
Scrum Master
Customer
Product owner
Team members
Correct answer- Scrum Master

Software deteriorates rather than wears out because
Correct answer- multiple change requests introduce errors in component interaction

A stakeholder is
Correct answer- Anyone who has a vested interest in the success of the project

Which is not one of the questions answered by each team member at a daily Scrum
meeting?
What did you do since the last meeting?
What obstacles are you encountering?
What is the cause of the problems you are encountering?
What do you plan to accomplish by the next team meeting?
Correct answer- What is the cause of the problems you are encountering?

The critical path
Correct answer- determines the total calendar time required to complete a project

Which of the following is not a configuration management activity?
change management
performance assessment
version management
system building
Correct answer- performance assessment

In version control, which of the following is a sequence of versions of source code?
Correct answer- codeline

, True or false: The Software Engineering Code of Ethics takes that a professional
software engineering should be committed to lifelong learning
Correct answer- True

Which of the following type of version control system creates a clone of the project
repository?
agile
file controlled
centralized
distributed
Correct answer- distributed

In configuration management storage management, keeping a difference between one
version and other than making a complete copy is called
a difference copy
a source translation
a delta
a clone
Correct answer- delta

Which of the following is not a common trait in software processes?
design and implementation
evolution
specifications
incremental development
validation
Correct answer- incremental development

Which is the best type of project to apply a waterfall method?
requirements are not well defined and will not change
the customer cannot clearly define the requirements
a great deal of risk is involved
many rapid releases are needed
Correct answer- requirements are well-defined and will not change

The prototyping of a software is
Correct answer- a useful approach when a customer cannot clearly define requirements
clearly

How do agile processes accommodate change to requirements?
incremental releases
refactoring
test driven development
pair programming
Correct answer- incremental releases

Written for

Course

Document information

Uploaded on
April 21, 2022
Number of pages
14
Written in
2021/2022
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EvaTee Phoenix University
Follow You need to be logged in order to follow users or courses
Sold
5205
Member since
4 year
Number of followers
3567
Documents
55654
Last sold
14 hours ago
TIGHT DEADLINE? I CAN HELP

Many students don\'t have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don\'t hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

3.8

947 reviews

5
451
4
167
3
171
2
48
1
110

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions