Identify the item that is not a characteristic of a mature process. Correct answer- The process requires further process engineering improvements. Establishing manufacturing capabilities focuses on Correct answer- manufacturing process planning and production resource planning. Producibility Engineering and Planning focuses on key processess and key product characteristics as well as: Correct answer- Identifying any new processes or materials as soon as possible and planning development concurrently with the product design. Integrated Management Planning (IMP) is __________________. Correct answer- the merging of manufacturing and production planning and development activities and quality practices Four keys to achieving quality are: Correct answer- Quality of design, conformance to requirements, fitness for use, and cost. Identify the key element(s) necessary to achieve quality products and services when performing quality assurance planning. Correct answer- All of the choices apply Select a manufacturing metric that applies during Production. Correct answer- Process variance data used to monitor and maintain process capability What is a group of activities that address process and product design and system engineering? Correct answer- Manufacturing Engineering Preparing finished products for shipment to the customer is: Correct answer- Packaging Which of the following might be considered a key product characteristic of a work boot? Check all that apply: Correct answer- Sole durability Sole traction Steel toe thickness Verification that the key processes are achieving the key product characteristics is accomplished by conducting which of the following? Correct answer- Dedicated process demonstrations A key step in the control system methodology is: Correct answer- Decide if corrective action is warranted What processes are responsible for achieving key product characteristics? Correct answer- Key Processes Which of the following is NOT an example of a material management approach (Push or Pull system)? Correct answer- DFARS What measurement is used to judge the quality of incoming material from a particular supplier? Correct answer- Purchased materials acceptance rate What is the production control method most often used in industries that process liquid or gaseous materials? Correct answer- Flow Control What is a document that lists all of the assemblies, parts, and components that make up the final product? Correct answer- Bill-of-material Why are quality systems developed? Correct answer- Because technical specifications alone do not guarantee that the customer's requirements will be consistently met A company wants to manufacture a closet door that has the following specifications: Height: 7'1", Width: 2'6", and Thickness: 1 5/8". Which of the doors below meet the manufacturer specifications? Correct answer- Height: 7'1", Width: 2'6", and Thickness: 1 5/8" Which of the following is NOT one of the steps when applying the "Concept of Control Systems"? Correct answer- Set an arbitrary value Which process may be used to verify that identified key processes are achieving the associated key product characteristics? Correct answer- Review of test article experience and process demonstrations. What type of Material Management System is "Just-In-Time"? Correct answer- Pull System Which of the following describes the DOD policy regarding a contractor's selection and use of a quality system? Correct answer- Contractors may be allowed to develop their own quality systems that meet contractual requirements; they are not restricted only to ISO/ANSI/ASQ 9000 criteria. What is continuous process improvement? Correct answer- All of the above What confirms the actions taken to achieve the target? Correct answer- Study Results What is a quick and easy way for a group to prioritize large lists without creating a "win/lose" situation? Correct answer- Multi-voting The Pareto Chart can be best described as: Correct answer- all of the above Which tool uses either a tabular and/or pictorial depiction of the collected data? Correct answer- Check Sheet What is the difference between a histogram and a scatter diagram ? Correct answer- Answers A and C. The Bell-shaped curve is a graphical representation of a set of sample data points known as Abnormal Distribution. Correct answer- False This rule is used to represent the probabilities of many common occurrences. Correct answer- Empirical Rule Being one of the most frequently used distributions, the Bell Shaped Curve is the basis for the _____________________. Correct answer- Statistical Process Control (SPC) What is a meaure that slices the bell-shaped curbe into increments of equal width, each represented in the graphic by the Greek letter Sigma? Correct answer- Standard Deviation What are the characteristics of a normal distribution? Correct answer- Approximately 68% of the data should lie within one standard deviation of the mean, about 95% of the data should lie between 2 standard deviations from the mean, approximately 99.7% of all data should lie within three deviations of the mean. What is the difference between a run chart and a control chart? Correct answer- A run chart is a graph that shows the changes in a process measurement over time that recognizes abnormal behavior in a process. A control chart is a graph that shows how a process varies over time, while identifying special causes of variation and changes in performance. What is good for preventing nonconformances and truly controlling a process, but data is hard (costly) to obtain? Correct answer- X-R What data requires collecting 10 to 20 subgroups (samples) of data and computing the subgroup statistics and control limits for the type of chart used? Correct answer- Attribute What process capability decision describes a process whose variability is greater than the specification limits and is experiencing a large number of nonconformances? Correct answer- Incapable process How are Cp and CpK related? Correct answer- Answers a and c What happens when the Cp and Cpk are the same value, and both are 1.33? Correct answer- The process is both precise and accurate. Which of the following matches each term to its correct value? (Carry out the values to the second decimal place). 1.m 2.n ll mean of X ge of R 5.A2 6.D3 7.D4 A. 2.28 B. 20 C. 0 D. 0.73 E. 4 F. 5.75 G. 46.29 Correct answer- m=20, n=4, overall mean of X=46.29, average of R=5.75, A2=0.73, D3=0, D4=2.28 Which of the following matches each term to its correct value? (Carry out the values to the second decimal place). 1.Upper Control Limit for the average of x chart 2.Lower Control Limit for the average of x chart 3.Centerline for the average of x chart 4.Upper Control Limit for the R chart 5.Lower Control Limit for the R chart 6.Centerline for the R chart A. 13.11 B. 5.75 C. 0 D. 50.49 E. 46.29 F. 42.09 Correct answer- 1-D, 2-F, 3-E, 4-A, 5-C, and 6-B Which one of the following "Tools" shows the possible relationship between one variable and another? Correct answer- Scatter Diagram Which of the following are computed from process performance data? Correct answer- Process Control Limits Which of the following Process Capability Ratios asks the question: "Is the Process Capable"? Correct answer- Cp The Shewhart Cycle or Ishikawa Circle has which of the following activities? Correct answer- All the choices apply When using the Empirical Rule (Bell-Shaped-Curve), what percent of the data can we expect to fall within 2 standard deviations? Correct answer- 95% Which type of control chart provides a good management overview, but provides little value from a troubleshooting or prevention perspective? Correct answer- p and np control chart What is a merger of computer technology and mechanical drawing? Correct answer- CAD What is a third-level system that uses computer simulated trials to project into the future and assist in decision making? Correct answer- Decision Support What are some advantages of using modeling and simulation for the DoD? A. Reduced costs for testing, training and DoD weapon acquisition B. Increased effectiveness of the design, test, and manufacturing functional specialists C. Increased real life trial and error testing D. Answers A and B E. Answers A and C Correct answer- Answers A and B Why is modeling and simulation especially important in the manufacturing process? Correct answer- Manufacturing expertise is integrated into the design process What is the purpose of prototyping? -To generate information concerning the design -To give a visual and tactile description of the design -To achieve a desirable level of functionality -All of the above Correct answer- All of the above Which characteristic sets rapid prototyping apart from other types of prototyping? Correct answer- The ability to create actual, physical models from the computer simulation models Stereolithography is: A. A mechanical drafting tool B. The most widely used rapid protoypting and manufacturing technique C. A rapid prototyping tool D. Answers B and C E. All of the above Correct answer- Answers B and C What has a variety of product lines and a significant amount of output? Correct answer- FCIM systems Why has the Army Materials Command (AMC) been so successful in utilizing FCIM at all AMC sites and in industry? -By establishing teaching factories -By teaching workshops and implementing networks to and with vendors -By sharing flexible manufacturing centers -All of the above Correct answer- All of the above Which of the following is a method for developing the technology and infrastructure to integrate various business processes within an enterprise to rapidly design, manufacture, repair, and deliver complex parts on demand? Correct answer- FCIM Which of the following is an advantage of using M&S in DOD manufacturing processes? Correct answer- Reduction of process time What is the result when a control structure is provided that creates process discipline? Correct answer- Product quality and defect free products What does the Master Production Schedule Identify? -All of the choices apply -Due date of deliverable end-items -Quantity -Configuration Correct answer- All of the choices apply The ANSI/ISO/ASQ 9000 Series is a set of three individual, but related standards on Quality Management and Quality Assurance that commonly serve as a __________ in the DOD to evaluate systems. Correct answer- Guide Which type of data is usually less expensive to collect, easier to interpret, and training is less complex? Correct answer- Attribute data Which of the following describes Cpk? Correct answer- The actual performance of a process is measured If a manufacturing process sustained a small degree of variation over time, one can assume which of the following? Correct answer- The value of sigma for the process is small The Shewart Cycle or Ishikawa Circle is which type of improvement model? Correct answer- Process Which of the following are required in order to implement an FCIM application? -All the choices apply -Automated processes -Automated material handling -Computer controls linked by Local Area Network (LAN) Correct answer- All the choices apply A weapon system developer is currently designing the production system for full-scale production. Which of the following would be a potential reason(s) for the contractor to use simulation instead of other methods of analyzing the system? Correct answer- It is not economically feasible to build a physical (actual working model) prototype of the system. What are some possible disadvantages of converting to a CAD-based system? -All of the choices apply -High initial capital investment in computers and CAD tools -Retraining of drafting personnel -Sensitive technical design data is more easily copied or stolen Correct answer- All of the choices apply What is used by decision-makers to assess if the acquisition makes good business sense, effectively implements laws and policies, and reflects priorities? Correct answer- Acquisition Strategy Which of the following does not apply to negotiated procurements? Correct answer- Used when product design is stable and requirements and specifications are adequate What type of contract and basic provisions are anticipated by the government? Correct answer- Model Contract What function would assess the offerers accounting system and document the information on the SFI 408 (acct syst)? Correct answer- Auditors One main purpose of source selection is to select a proposal which best meets the government requirements because it _________________. Correct answer- is the best value What indicates a low probability of satisfying the requirement and has significant but correctable deficiencies? Correct answer- Yellow Which of the following does not apply to source selection? -CRs identify areas in a proposal that are unclear and need clarification -Offerors and the government arrive at a common understanding of the proposal essentials during discussion and negotiation -Information for past performance evaluation is based solely on the information offerors submit with their proposals -After BAFOs have been requested, the government can no longer discuss proposals with any offerors Correct answer- Information for past performance evaluation is based solely on the information offerors submit with their proposals

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

PQM 101 - Production, Quality and
Manufacturing Fundamentals

Identify the item that is not a characteristic of a mature process. Correct answer- The
process requires further process engineering improvements.

Establishing manufacturing capabilities focuses on Correct answer- manufacturing
process planning and production resource planning.

Producibility Engineering and Planning focuses on key processess and key product
characteristics as well as: Correct answer- Identifying any new processes or materials
as soon as possible and planning development concurrently with the product design.

Integrated Management Planning (IMP) is __________________. Correct answer- the
merging of manufacturing and production planning and development activities and
quality practices

Four keys to achieving quality are: Correct answer- Quality of design, conformance to
requirements, fitness for use, and cost.

Identify the key element(s) necessary to achieve quality products and services when
performing quality assurance planning. Correct answer- All of the choices apply

Select a manufacturing metric that applies during Production. Correct answer- Process
variance data used to monitor and maintain process capability

What is a group of activities that address process and product design and system
engineering? Correct answer- Manufacturing Engineering

Preparing finished products for shipment to the customer is: Correct answer- Packaging

Which of the following might be considered a key product characteristic of a work boot?
Check all that apply: Correct answer- Sole durability
Sole traction
Steel toe thickness

Verification that the key processes are achieving the key product characteristics is
accomplished by conducting which of the following? Correct answer- Dedicated process
demonstrations

A key step in the control system methodology is: Correct answer- Decide if corrective
action is warranted

, What processes are responsible for achieving key product characteristics? Correct
answer- Key Processes

Which of the following is NOT an example of a material management approach (Push or
Pull system)? Correct answer- DFARS

What measurement is used to judge the quality of incoming material from a particular
supplier? Correct answer- Purchased materials acceptance rate

What is the production control method most often used in industries that process liquid
or gaseous materials? Correct answer- Flow Control

What is a document that lists all of the assemblies, parts, and components that make up
the final product? Correct answer- Bill-of-material

Why are quality systems developed? Correct answer- Because technical specifications
alone do not guarantee that the customer's requirements will be consistently met

A company wants to manufacture a closet door that has the following specifications:
Height: 7'1", Width: 2'6", and Thickness: 1 5/8". Which of the doors below meet the
manufacturer specifications? Correct answer- Height: 7'1", Width: 2'6", and Thickness: 1
5/8"

Which of the following is NOT one of the steps when applying the "Concept of Control
Systems"? Correct answer- Set an arbitrary value

Which process may be used to verify that identified key processes are achieving the
associated key product characteristics? Correct answer- Review of test article
experience and process demonstrations.

What type of Material Management System is "Just-In-Time"? Correct answer- Pull
System

Which of the following describes the DOD policy regarding a contractor's selection and
use of a quality system? Correct answer- Contractors may be allowed to develop their
own quality systems that meet contractual requirements; they are not restricted only to
ISO/ANSI/ASQ 9000 criteria.

What is continuous process improvement? Correct answer- All of the above

What confirms the actions taken to achieve the target? Correct answer- Study Results

What is a quick and easy way for a group to prioritize large lists without creating a
"win/lose" situation? Correct answer- Multi-voting

Geschreven voor

Vak

Documentinformatie

Geüpload op
21 april 2022
Aantal pagina's
13
Geschreven in
2021/2022
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EvaTee Phoenix University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
5227
Lid sinds
4 jaar
Aantal volgers
3570
Documenten
56158
Laatst verkocht
2 uur geleden
TIGHT DEADLINE? I CAN HELP

Many students don\'t have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don\'t hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

3.8

952 beoordelingen

5
453
4
167
3
174
2
48
1
110

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen