ACQ 202 Module 4 Exam, Part I (Contains 19 Questions Wit Answers)
ACQ 202 Module 4 Exam, Part I (Contains 19 Questions Wit Answers) A Government official who obligates the Government on a contract without having sufficient funds to cover that expense has violated the _______________. Reprogramming Thresholds Misappropriation Act Anti-Deficiency Act Bona Fide Need Rule 2.) The Army can transfer excess funds from a Procurement appropriation to a Research, Development, Test, and Evaluation (RDT&E) appropriation to cover a funding shortfall of $3 million without prior approval of Congress. True False 3.) Match each System Product Lifecycle element to the appropriate software configuration management baseline. System Functional Baseline System Product Baseline System Allocated Baseline 4.) The approved detail design resulting from the __________ serves as a basis for making the decision to begin production. Preliminary Design Review System Requirements Analysis; Softw are Requirements Analysis Softw are Coding Softw are Design; Interface Design; Database Design Systems Requirement Review Test Readiness Review Critical Design Review 5.) The management of internal interface design would usually be the responsibility of the _____________? Government Program Manager Independent Test and Evaluation Agency Joint Interoperability Test Command Contractor 6.) Which of the following configuration baselines is used to define the overall system level capabilities of a system? Product Baseline Functional Baseline Allocated Baseline Item Baseline 7.) One of the many potential issues associated with the configuration management of commercial items, is the ongoing requirement to track: The contractor and sub-contractor workforce skill sets The development of technical performance measures The corrective actions applied to developmental test failures The numerous product releases over the life cycle of the program 8.) A new joint command and control system is being developed to meet the strategic information needs of all the military services. The Air Force is the lead service, but the Army and Navy have different points of view about what functions the system should perform. Which one of the software acquisition best practices would be most relevant in managing this issue as the program office undertakes system development? [27c. Identify developer practices essential for creation of high quality software.] [Remediation Accessed: Y] Manage and trace requirements Ensure data and database interoperability Track defects against quality targets Manage testing as a continuous process 9.) Using pre-production systems, an Operational Assessment can reduce program risk by _____________________. Tracking the development of the critical operational issues Providing operational effectiveness and suitability data Supporting the decision to begin full rate production (FRP) Looking at suitability issues during developmental test and evaluation 10.) A program manager should normally look for opportunities to integrate developmental testing (DT) and operational testing (OT) in order to save time and money. True False 11.) Within _____ days after a program deviation occurs, the Program Manager [4b. Identify when program deviations [Remediation Accessed: N] must inform the Milestone Decision Authority of the action(s) necessary to get the program back on track.
Geschreven voor
- Instelling
- Defense Information School
- Vak
- ACQ 202 (ACQ202)
Documentinformatie
- Geüpload op
- 1 mei 2022
- Aantal pagina's
- 24
- Geschreven in
- 2021/2022
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
acq 202
-
acq
-
202
-
acq 202 module 4 exam
-
acq 202 module 4 exam
-
part i
-
part i contains 19 questions wit answers