Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Unit 29 Manufacturing Planning Assignment BELFAST METROPOLITAN COLLEGEBTEC QCFLEVEL 3 ASSESSMENT

Rating
-
Sold
-
Pages
5
Grade
A
Uploaded on
14-05-2022
Written in
2021/2022

BELFAST METROPOLITAN COLLEGE BTEC QCF LEVEL 3 ASSESSMENT FRONT SHEETS CAM AREA: Science, Engineering and Transportation Programme Title: B-TEC level 3 Extended Diploma Manufacturing Engineering Assessment Set by: Kenneth Cheetham Date: 30th Oct 2019 Assessment Validated by: Wesley Williamson Date: 02nd Sept 2019 Learner Name: Unit Number & Title: Unit 29: Manufacturing Planning Assessor Name: Special Instructions: Kenneth Cheetham This assessment must be submitted to K Cheetham between the hours of 9:00 -10:00 am. the assessment must be word processed and suitably referenced Date Issued: Submission date Deadline: Submitted on 08/November/2019 13/December/2018 Assessment Title: ASSIGNMENT.1 Types of Production in Manufacturing Industries In this assessment you will have opportunities to provide evidence against the following criteria. Criteria Reference: To achieve the criteria the evidence must show that the learner is able to: Task No. Achieved / Not Achieved P1 Describe the six different types of production 1 P2 Describe a stock holding policy for a given type of inventory 2 P3 Determine an economic order quantity from given data 3

Show more Read less
Institution
Course

Content preview

BELFAST METROPOLITAN COLLEGE
BTEC QCF LEVEL 3 ASSESSMENT FRONT SHEETS


CAM AREA: Science, Engineering and Programme Title: B-TEC level 3 Extended Diploma
Transportation Manufacturing Engineering
Assessment Set by: Kenneth Cheetham Date: 30th Oct 2019
Assessment Validated by: Wesley Williamson Date: 02nd Sept 2019


Learner Name: Unit Number & Title:
Unit 29: Manufacturing Planning
Assessor Name: Special Instructions:
This assessment must be submitted to K Cheetham between the hours of
Kenneth Cheetham 9:00 -10:00 am. the assessment must be word processed and suitably referenced
Date Issued: Submission date Deadline: Submitted on

08/November/2019 13/December/2018

Assessment Title: ASSIGNMENT.1 Types of Production in Manufacturing Industries
In this assessment you will have opportunities to provide evidence against the following criteria.

Criteria To achieve the criteria the evidence must show that the learner is able to: Task No. Achieved / Not
Reference: Achieved

P1 Describe the six different types of production 1
P2 Describe a stock holding policy for a given type of inventory 2
P3 Determine an economic order quantity from given data 3
Describe an Appropriate technique used to improve product
P4 4
manufacturing Efficiency
Explain the circumstances in which cellular production would be
M1 5
better than batch production

Learner Declaration: Student Signature: Date:
Student Declaration: I have read the College ‘Academic Misconduct Policy that incorporates Plagiarism,
Cheating and Other Forms of Academic Misconduct’ and I certify that all materials submitted for this assessment
are my own work.


Assessor Signature on PRINT Kenneth Cheetham
Date:
completion of marking: Signature

Internal Verification PRINT
Date:
Signature: Signature

Lead Internal Verifier PRINT
Date:
Signature: Signature

SV /QA Signature: PRINT
Date:
Signature




This
BTECstudy source3was
QCF LEVEL downloaded
COVER 2014/16 by 100000835818796 from CourseHero.com on 05-14-2022 02:36:36 GMT -05:00
(ALAN SERPLUS) - STANDARDS IMPROVEMENT UNIT


https://www.coursehero.com/file/104611163/Unit-29-Manufacturing-Planning-Assignment-1-2019-2020doc/

, BELFAST METROPOLITAN COLLEGE
BTEC QCF LEVEL 3 ASSESSMENT FRONT SHEETS
ASSESSOR'S COMMENTS
Unit Number
and Title: Learner
Unit 29: Manufacturing Planning
Name:


Learner Feedback




Assessor Feedback:



Assessment/Grading Criteria Covered
FEEDBACK
Ref Criterion


Describe the six different types of
P1 production, jobbing; batch; cellular;
flow; mass; automatic
Describe a stock holding policy for a
P2
given type of inventory.
Determine an economic order quantity
P3
from given data.
Describe an Appropriate technique
P4 used to improve product manufacturing
Efficiency
Explain the circumstances in which
cellular production would be better
M1 than batch production
Assessor I certify that, in my professional opinion and to the best of my knowledge, the evidence submitted for this assessment is
the learner’s own and completed within the rules of assessment. The learner has clearly referenced any sources used in
Declaration:
the work.
Assessor
Signature: Date:

Learner
Signature: Date:




This
BTECstudy source3was
QCF LEVEL downloaded
COVER 2014/16 by 100000835818796 from CourseHero.com on 05-14-2022 02:36:36 GMT -05:00
(ALAN SERPLUS) - STANDARDS IMPROVEMENT UNIT


https://www.coursehero.com/file/104611163/Unit-29-Manufacturing-Planning-Assignment-1-2019-2020doc/

Written for

Institution
Study
Unknown
Course

Document information

Uploaded on
May 14, 2022
Number of pages
5
Written in
2021/2022
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$8.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
tinahmasterall Bradford College
Follow You need to be logged in order to follow users or courses
Sold
12
Member since
4 year
Number of followers
11
Documents
396
Last sold
1 year ago

2.5

2 reviews

5
0
4
1
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions