Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

ACQ 202 Module 2 Exam: Part I Planning - Acquisition Strategy Development

Rating
-
Sold
-
Pages
4
Grade
A+
Uploaded on
25-05-2022
Written in
2021/2022

Which of the following is a true statement about the Product Support Strategy Process Model? -It enables the identification of supportability and sustainment strategies near the end of the life. -It is an iterative process in which the sustainment of a system (or systems) is adapted and evolved to optimally support the needs and requirements of the Warfighter. -It is a continuing process that assists in the identification and evolution of the PSM IPT. -It is a one-time process that defines the needs and requirements of the Warfighter early in the life cycle. Executive Orders on environmental activities and policy, sometimes referred to as "Greening the Government": -States that Major Program Managers must take and pass formal training in environmental protection. -Directs all Federal Agencies to establish plans to improve energy efficiency, reduce greenhouse gas emissions, conserve and protect water resources and reduce or eliminate toxic or hazardous materials. -Exempts less-than-ACAT I programs from compliance with National Environmental Policy Act (NEPA) procedures if they have an approved Environmental Impact Statement. -Applies only to ACAT I and ACAT II programs. 00:03 01:46 Which one of the following test and evaluation (T&E) products is required at Milestone C? -DOT&E Report on Initial Operational Test and Evaluation (IOT&E) -Operational Assessment (OA) Results -Early Operational Assessment (EOA) -Live Fire Test and Evaluation (LFT&E) Report How does a program management office show the sequence and interrelationship of all the business and technical activities required to accomplish the acquisition? -Integrated Product and Process Development (IPPD) Plan (NOT THIS ONE) -Risk Management Plan -Acquisition Strategy - Program Structure Chart -Integrated Systems Engineering/Business Management Plan A TEMP (either initial or updated, as appropriate) must be provided for consideration and approval before each milestone review, starting with Milestone B. -True -False The ____________________ provides military intelligence to defense policy makers, force planners and warfighters in DOD in support of weapons system acquisition. -Defense Intelligence Agency (DIA) -Director of National Intelligence (DNI) -Army Intelligence -National Security Agency (NSA) By implementing Integrated Product and Process Development (IPPD), gains realized by the early integration of business, contracting, manufacturing, testing, training, and support considerations in the design process can result in ___________________. -increased logistics footprint -unnecessary schedule delays -fewer costly changes made later in the process -complicated detail design reviews The purpose of the Program Protection Plan (PPP) is to help programs ensure that they adequately protect their technology, components, and information. It is used to develop __________________ for dissemination and implementation throughout the program for which it is created. -System security engineering plans -Updated criticality analysis -Counterintelligence analytical products -Tailored protection guidance Transitioning to Integrated Product and Process Development (IPPD) will involve application of certain key tenets, such as customer focus, concurrent development, and: -Risk avoidance -Reliance on independent organizations -Event-driven scheduling -Supervisory leadership In which phase of the life cycle does the Life Cycle Sustainment Plan (LCSP) focus on how sustainment performance is measured, managed, assessed, and reported? -TMRR Phase -P&D Phase -EMD Phase -O&S Phase The Test and Evaluation Master Plan (TEMP) is mandated by DoD policy and must be updated periodically to ensure that it stays current as the program evolves through the life cycle. -True -False Operational Measures of Effectiveness (MOE) and Measures of Suitability (MOS) are formally documented in the ________. -Work Breakdown Structure (WBS) -Initial Capabilities Document (ICD) -Acquisition Strategy -Test and Evaluation Master Plan (TEMP

Show more Read less
Institution
Course

Content preview

ACQ 202 Module 2 Exam: Part I Planning
- Acquisition Strategy Development
Which of the following is a true statement about the Product Support Strategy Process
Model? - ANSWER-It enables the identification of supportability and sustainment
strategies near the end of the life.
-*It is an iterative process in which the sustainment of a system (or systems) is adapted
and evolved to optimally support the needs and requirements of the Warfighter.*
-It is a continuing process that assists in the identification and evolution of the PSM IPT.
-It is a one-time process that defines the needs and requirements of the Warfighter early
in the life cycle.

Executive Orders on environmental activities and policy, sometimes referred to as
"Greening the Government": - ANSWER-States that Major Program Managers must
take and pass formal training in environmental protection.
-*Directs all Federal Agencies to establish plans to improve energy efficiency, reduce
greenhouse gas emissions, conserve and protect water resources and reduce or
eliminate toxic or hazardous materials.*
-Exempts less-than-ACAT I programs from compliance with National Environmental
Policy Act (NEPA) procedures if they have an approved Environmental Impact
Statement.
-Applies only to ACAT I and ACAT II programs.

Which one of the following test and evaluation (T&E) products is required at Milestone
C? - ANSWER-DOT&E Report on Initial Operational Test and Evaluation (IOT&E)
-*Operational Assessment (OA) Results*
-Early Operational Assessment (EOA)
-Live Fire Test and Evaluation (LFT&E) Report

How does a program management office show the sequence and interrelationship of all
the business and technical activities required to accomplish the acquisition? -
ANSWER-Integrated Product and Process Development (IPPD) Plan (NOT THIS ONE)
-Risk Management Plan
-Acquisition Strategy - Program Structure Chart
-Integrated Systems Engineering/Business Management Plan

A TEMP (either initial or updated, as appropriate) must be provided for consideration
and approval before each milestone review, starting with Milestone B. - ANSWER-True
-*False*

The ____________________ provides military intelligence to defense policy makers,
force planners and warfighters in DOD in support of weapons system acquisition. -
ANSWER-*Defense Intelligence Agency (DIA)*
-Director of National Intelligence (DNI)
-Army Intelligence
-National Security Agency (NSA)

Written for

Course

Document information

Uploaded on
May 25, 2022
Number of pages
4
Written in
2021/2022
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$8.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
millyphilip West Virginia University
Follow You need to be logged in order to follow users or courses
Sold
2924
Member since
4 year
Number of followers
1958
Documents
44390
Last sold
2 days ago
white orchid store

EXCELLENCY IN ACCADEMIC MATERIALS ie exams, study guides, testbanks ,case, case study etc

3.6

551 reviews

5
239
4
87
3
104
2
32
1
89

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions