CLC 056 Analyzing Contract Costs Exam 100%
1. Which of the following situations are considered exempt from the submission of Certified Cost
or Pricing Data?
 Prices are set by law or regulation
 Sole source acquisition of $3.5M FFP effort; price determined using cost analysis
 Price may be determined fair and reasonable based on price analysis proposal
techniques
 Non-commercial modification of a commercial item. Modification funded by DoD and
constitutes 5% of value of modification

2. When given a set of data that appears to contain outliers, which measure of central tendency
is most appropriate to use?
 Median
 Coefficient of Determination
 Mean
 Mode

3. What is an important driver to a successful negotiation?
 Listen to understand
 Ensure your position is heard
 Maintain position of power
 Obtain the lowest price for the government

4. Which of the following would be a proper method of determining the reasonableness of a
contractor’s proposed labor hour estimate?
 Compare proposed hours with a Government should-cost estimate
 Compare proposed hours with all other contracts from the same contractor
 Decrement labor hours estimate according to DCAA standard decrement
 Use a stratified sampling techniques to evaluate contractor’s labor hour estimate

5. Which of the following situations would exempt a contract or subcontract from CAS
coverage?
 The contract or subcontract is with a small business
 Value of the contract or subcontract is $7.5M or less
 The Economic Price Adjustment clause for a commercial item is based on an index
formulated with a contractor’s historical cost data
 Sole source firm fixed price contract requiring submission of cost or pricing data

6. True or False: “Direct labor positions” share the same titles and pay levels.
 True
 False

7. Which situation below would you use improvement curve analysis to evaluating proposed
costs?
 Assembly line with high proportion of manual labor
 Fabrication plant that generates 100,000 units per month
 Production facility specializing in “one-off” or unique item production
 Fully automated assembly line
8. Using a direct comparison with the cost of a similar contract effort is an acceptable summary



This study source was downloaded by 100000822442696 from CourseHero.com on 05-26-2022 00:01:51 GMT -05:00


https://www.coursehero.com/file/51760938/CLC-056-Analyzing-Contract-Costs-Examdocx/

, estimating technique
 True
 False

9. Identify circumstances when cost analysis should be performed by answering the following
question. “Unless an exception to certified cost or pricing data applies, you can perform cost
analysis on which of the following procurements?"
 The modification of any sealed bid or negotiated contract
 The award of any negotiated contract (except for undefinitized actions such as letter
contracts)
 All of these are correct
 The award of a subcontractor at any tier, if the contractor and each higher-tier
subcontractor have been required to furnish certified cost or pricing data

10. Which sampling technique is used to focus on high-value items?
 Stratified
 Random
 Cluster
 Nonprobability

11. Which of the following is an effective use of stratified sampling?
 Analyzing the items that make up 80% of the total material cost and 10% of the
remaining items
 Analyzing 20% of the items that are under $25,000
 Analyzing 100% of the items
 Analyzing 10% of the items selected randomly

12. Which of the following is a phase in the allocation cycle?
 Interim Processing Phase
 Adjustment on Rates Phase
 Final Allocation Phase
 Continuous Rate Application Phase

13. The purpose of an audit is to:
 All of these are correct
 Determine if the data is accurate and complete
 Verify transaction legality
 Determine the degree of compliance with established procedures

14. How may you request an audit?
 All of these are correct
 By telephone call
 By mail
 By e-mail

15. Which of the following is the best strategy to mitigate cost risk?
 Conduct adequate market research prior to entering negotiations
 Rely on the contractor’s proposed costs, supported by anecdotal data provided by the
 contractor
 Evaluate other contract actions awarded to the contractor you’re negotiating with
 Establish a firm profit/fee percentage prior to entering negotiations


This study source was downloaded by 100000822442696 from CourseHero.com on 05-26-2022 00:01:51 GMT -05:00


https://www.coursehero.com/file/51760938/CLC-056-Analyzing-Contract-Costs-Examdocx/

Geschreven voor

Vak

Documentinformatie

Geüpload op
26 mei 2022
Aantal pagina's
8
Geschreven in
2020/2021
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$14.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Succeed Havard University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1823
Lid sinds
6 jaar
Aantal volgers
1499
Documenten
5755
Laatst verkocht
1 dag geleden

3.9

293 beoordelingen

5
167
4
34
3
36
2
9
1
47

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen